| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC | ₹50.7 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹53.2 LRejected-Finance | ₹53.2 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹59.5 LRejected-Finance N A | ₹59.5 L | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹60.2 LRejected-Finance | ₹60.2 L | L4 | Rejected-Finance 4th Lowest |
| 5 | L5₹62.7 LRejected-Finance | ₹62.7 L | L5 | Rejected-Finance 5th Lowest |
| Sl No | Description | Qty | Unit | MOHD. HANIF CHAUDHRY L1 | Ms Lokesh Kathayat L7 | SHRI KRISHNA CONSTRUCTION CO. L3 | M/S Ravindra Builders and Engineers L6 | M.G.M. Construction. Co L4 | Nazim contractor L2 | M/S SAANVI STEEL FABRICATION & HARDWARE L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 180.6 | Cum | 181.16 ₹32,717.5 | 171.05 ₹30,891.63 | 174.27 ₹31,473.16 | 194 ₹35,036.4 | 189 ₹34,133.4 | 150 ₹27,090 | 250 ₹45,150 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 64.77 | Cum | 4,740.92 ₹3,07,069.39 | 4,476.43 ₹2,89,938.37 | 4,560.58 ₹2,95,388.77 | 5,080 ₹3,29,031.6 | 4,970 ₹3,21,906.9 | 3,200 ₹2,07,264 | 6,400 ₹4,14,528 |
| 3.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 78.64 | Sqm | 7,553.29 ₹5,93,990.73 | 7,131.37 ₹5,60,810.94 | 7,265.96 ₹5,71,395.09 | 8,094 ₹6,36,512.16 | 7,890 ₹6,20,469.6 | 7,500 ₹5,89,800 | 3,500 ₹2,75,240 |
| 4.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Reinforcement for R.c.c work Using Thermo-mechanically treated bars | 72.22 | Qtl | 75.06 ₹5,420.83 | 8,362.94 ₹6,03,971.53 | 7,220.47 ₹5,21,462.34 | 8,043 ₹5,80,865.46 | 7,860 ₹5,67,649.2 | 8,550 ₹6,17,481 | 107 ₹7,727.54 |
| 5.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 300 | Sqm | 108.61 ₹32,583 | 121.01 ₹36,303 | 104.48 ₹31,344 | 116 ₹34,800 | 113 ₹33,900 | 100 ₹30,000 | 156 ₹46,800 |
| 6.00 | Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 Sq M over and including priming coat of exterior primer applied @ 2.20 kg/10 Sq M) | 300 | Sqm | 155.62 ₹46,686 | 124.53 ₹37,359 | 107.52 ₹32,256 | 120 ₹36,000 | 116 ₹34,800 | 125 ₹37,500 | 250 ₹75,000 |
| 7.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 20.3 | Cum | 123.53 ₹2,507.66 | 201.84 ₹4,097.35 | 118.83 ₹2,412.25 | 132 ₹2,679.6 | 130 ₹2,639 | 100 ₹2,030 | 220 ₹4,466 |
| 8.00 | Centring and shuttering including strutting,ropping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete. | 320 | Sqm | 272.93 ₹87,337.6 | 304.08 ₹97,305.6 | 262.54 ₹84,012.8 | 292 ₹93,440 | 285 ₹91,200 | 60 ₹19,200 | 350 ₹1,12,000 |
| 9.00 | Centring and shuttering including strutting,ropping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 128.94 | Sqm | 515.51 ₹66,469.86 | 571.02 ₹73,627.32 | 493.02 ₹63,570 | 549 ₹70,788.06 | 538 ₹69,369.72 | 450 ₹58,023 | 700 ₹90,258 |
| 10.00 | Centring and shuttering including strutting,ropping etc. and removal of form for
Suspended floors, roofs, landings, balconies and access platform. | 494.77 | Sqm | 645.33 ₹3,19,289.92 | 719.02 ₹3,55,749.53 | 620.79 ₹3,07,148.27 | 692 ₹3,42,380.84 | 675 ₹3,33,969.75 | 450 ₹2,22,646.5 | 900 ₹4,45,293 |
Tender Value
₹68.4 L
EMD Value
₹1.4 L
Closing Date
9 Mar 2026, 5:00 pmClosed
PM CONSTRUCTION UNIT UKPJN HALDWANI
PROJECT MANAGER, CONSTRUCTION UNIT, UTTARAKHAND PEYJAL NIGAM, Ist FLOOR IN VIDHYA COMPLEX, VIDHYAPURAM, R.K. TENT HOUSE ROAD, KUSUMKHERA HALDWANI DISTT-NAINITAL 263139
CONSTRUCTION OF PARKING SHED, SITE DEVELOPMENT, WATER PROOFING RECONSTRUCTION OF BOUNDARY WALL AND MISCELLANEOUS WORK AT STATE TAX OFFICE RAMNAGAR
2026_MDPEY_92064_1
133/Nivida/6 Dt. 17.02.2026
Open Tender
Civil Works
270 days
State Tax Office Ramnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
PM CONSTRUCTION UNIT UKPJN HALDWANI
₹1.4 L
PM CONSTRUCTION UNIT UKPJN HALDWANI
7 Jul 2026
18 Feb 2026
13 Mar 2026
18 Feb 2026
9 Mar 2026
24 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 180.6 | Cum | 220.59 | ₹39,838.55 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 64.77 | Cum | 5,772.88 | ₹3,73,909.44 |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 78.64 | Sqm | 9,197.42 | ₹7,23,285.11 |
| 4 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Reinforcement for R.c.c work Using Thermo-mechanically treated bars | 72.22 | Qtl | 9,139.83 | ₹6,60,078.52 |
| 5 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 300 | Sqm | 132.25 | ₹39,675 |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 Sq M over and including priming coat of exterior primer applied @ 2.20 kg/10 Sq M) | 300 | Sqm | 136.1 | ₹40,830 |
| 7 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 20.3 | Cum | 150.42 | ₹3,053.53 |
| 8 | Centring and shuttering including strutting,ropping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete. | 320 | Sqm | 332.33 | ₹1,06,345.6 |
| 9 | Centring and shuttering including strutting,ropping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 128.94 | Sqm | 624.07 | ₹80,467.59 |
| 10 | Centring and shuttering including strutting,ropping etc. and removal of form for
Suspended floors, roofs, landings, balconies and access platform. | 494.77 | Sqm | 785.81 | ₹3,88,795.21 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_109018.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
Tenderdocuments.pdf
Tender Documents • 8.97 MB
BOQ_109018.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid