Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
7 Oct 2022, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMDT(JG) VINAYAK SRIVASTAVA
CGDHQ-8, ANCHORAGE CAMP, HALDIA
DEFECT RECTIFICATION ON ROTABLE MAIN ENGINE ONBOARD ACV H-188
2022_ICG_714661_1
D-8/FM/MW/H-188/06/22-23
Single
Miscellaneous Services
Works
180 days
CGDHQ-8, ANCHORAGE CAMP, HALDIA
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
Exempted
10 Oct 2022
26 Sept 2022
10 Oct 2022
26 Sept 2022
7 Oct 2022
26 Sept 2022
26 Sept 2022 - 7 Oct 2022
E-022/H-188 Rotable Main Engine (Make:- IVCO, Model:- V8FVAE2884AB201) of ACV H-188 is non ops. DI/DR to be undertaken and ME to be proved for satisfactory /safe operation. Scope Of Work (A) Removal and replacement of front left side broken Engine Mount. 1. Front Engine Mount to be disassembled by removing the fasteners. 2. New Engine Mount to be fitted on the position and Torque tightening to be done. (B) Removal and replacement of rear both side broken Engine Mount. 1. Rear both Engine Mount to be disassembled by removing the fasteners. 2. New Engine Mount to be fitted on the position and Torque tightening to be done. (C) Removal and replacement of rear crank case cover assembly. 1. Rear crank case sub assemblies to be dismantled. 2. New rear crank case cover assembly to be fitted on its position and torque tightening to be done. 3. Sub assemblies to be fitted back and torque tightening to be done. (D) Cleaning of Cooling system pipes and hoses. 1. All open coolant pipes and hoses to be cleaned and inspection to be carried out. (E) Post completion of engine assembly, trail to be carried out. 1. Main Engine to be shifted from maintenance stand to Testing Bed. 2. All necessary electrical connection to be done for starting the Engine. 3. 24V Battery connection to be done. 4. Diagnostic Kit to be connected with the Engine ECU. 5. Cold checks to be carried out before starting the Engine. 6. Engine to be started and all parameters in diagnostic kit to be checked. (F) Post completion of Engine Trial, Preservation and packing to be done. 1. Main Engine to be Run with the calibration fluids for preservation. 2. All open air intake pipes to be spray for the preservation. 3. All open pipes and hose to be secured for the protection from the dust. 4. Main Engine packing to be done for transporting.
stage.html
html • 0.02 MB
finance_751763.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .