| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹53.3 L+₹2.6 L (5.05%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | TOWER-ROCK CONSTRUCTIONS (P) LTD. L2 | SAMEER ALI CT L1 |
|---|---|---|---|---|---|
| 1.00Supply and Laying HDPE pipes | |||||
| 1.00 | OD249781/2024-2025:Supply of 710mm dia HDPE pipe PE100,( PN-10),IS 14333 for sewerage application including charges for unloading and stacking in yard | 50 | metre | 28,384.93 ₹14,19,246.5 | 26,236 ₹13,11,800 Lowest |
| 1.00 | OD249782/2024-2025:Installation,testing ,trial run of HDPE -710mm Dia ,pipe by horizontal directional drilling method in all types of soil including rock,bolders etc above /below water table for gravity sewer including preparing, setting up the plant and equipment, installing new pipe ,testing and commissioning including the cost for butt jointing the pipe ,other civil works suh as preparing the entry pipt and exit pit as per requirement, dewatering, drilling, stringing reaming ,pulling back the new pipe on the designed alignment and monitoring by approved guidance system, including wastage of pipe proper disposal of fluid/bentonite slurry, proper backfilling of pits and holes by approved borrow meterials as per specification, approved method statement or directed by Engineer in charge. | 50 | metre | 38,639.09 ₹19,31,954.5 | 35,714 ₹17,85,700 Lowest |
| 2.00Working charges | |||||
| 2.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 45 | cum | 693.26 ₹31,196.7 | 693 ₹31,185 Lowest |
| 2.00 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 22.5 | cum | 961.12 ₹21,625.2 | 961 ₹21,622.5 Lowest |
| 2.00 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | 16 | metre | 113.87 ₹1,821.92 | 113 ₹1,808 Lowest |
| 2.00 | 100.7.2:Bailing out water with engine and pump set above 5HP up to 10HP including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 7,161.6 | Kwh | 20.13 ₹1,44,163.01 | 20 ₹1,43,232 Lowest |
| 2.00 | OD248033/2024-2025:Construction of temporary bund using earth filled cement bags including cutting of earth filling conveying and placing in position filling with contractors on earth (excluding rock )in the core portion of earthen bund by consolidating each deposited layer by ramming and watering .supplying conveying and covering using best quality
poly-ether sheet on bund to protect from seasonal changes conveying and providing bamboo poles@3 m per 4 m cub (1 m in each longitudinal ,horizontal and vertical directions for reinforcing the temporary bund dismantlement sand /earth filled cement bags from the foundation site of bund apron on both sides counter walls and removing from the bags and disposing the damaged cement bags properly as per the direction of the department officers including cost of all labor charges and hire for tools and plants etc complete | 44.48 | cum | 8,580.03 ₹3,81,665.47 | 8,580 ₹3,81,664.14 Lowest |
| 2.01 | 100.98.1008:Engaging Coolie. | 75 | no | 1,106.22 ₹82,966.5 | 1,106 ₹82,950 Lowest |
Tender Value
₹50.7 L
EMD Value
₹50,000
Closing Date
2 Jun 2025, 3:00 pmClosed
Executive Engineer
EE, PD, KWA, TVPM
Interconnection works from the conveyance main to pumping station at Karimanal 710mm dia HDPE pipe by HDD method
2025_KWA_766344_1
04/2025-25/KWA/PD/TVM(RT1)
Open Tender
Civil Works - Water Works
Item Rate
90 days
Karimanal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
15 Nov 2025
26 May 2025
3 Jun 2025
26 May 2025
2 Jun 2025
26 May 2025
26 May 2025 - 2 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .