Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Quoted rate -1.00 |
| 2 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Quoted rate -1.00 |
| 3 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Quoted rate -1.00 |
| 4 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Quoted rate -1.00 |
| 5 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance Quoted rate -1.00 |
Tender Value
₹39.1 L
EMD Value
₹39,140
Closing Date
27 May 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, ANANDPUR
Construction of Homoeopathic Dispensary Building at Kendua of Ghasipura Block in the District of Keonjhar for the year 2025-26.
2026_CERWI_129641_1
02/EE/RW/AND/2026-27
Open Tender
Civil Works - Buildings
270 days
Salapada
Please refer tender documents as per DTCN
2 documents required · 2 mandatory
₹6,000
₹39,140
Yes
1 Jul 2026
22 May 2026
28 May 2026
22 May 2026
27 May 2026
22 May 2026
22 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed upto the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc. complete as directed by the Engineer-in-charge. | 197.59 | cum | 311.55 | ₹61,559.16 |
| 2 | Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished section only etc.complete as directed by the Engineer-in-charge. | 82.88 | cum | 579.18 | ₹48,002.44 |
| 3 | Cement concrete (1:3:6) with 4cm size hard granite metal of approved quality and approved quarry in foundation including hoisting laying concrete with cost conveyance of materials including watering, curing, royality all T & P required for the work etc. complete as per direction of the Er. in charge. | 32.75 | cum | 6,850.74 | ₹2,24,361.74 |
| 4 | Fly Ash Brick masonary in cement mortar ( 1:6 )using K.B.Bricks of size 10"x5"x3" having crushing strength between 100 Kg/Cm2 to 149 Kg/Cm2 after immersing the bricks for six hours in water before use in foundation plinth & basement and for ornamental flower beds plinth moulding and similar such type of works with all necessary projections flooring moulding corbelling, champhering watering and curing etc.including cost,conveyance,royalties and all taxes of all materials and cost of all labouir with T&P required for the work etc.complete in all respect as per direction of Engineer-in-charge. | 66.66 | cum | 5,941.53 | ₹3,96,062.39 |
| 5 | Fly Ash Brick masonary in cement mortar ( 1:6 )using K.B.Bricks of size 10"x5"x3" having crushing strength between 100 Kg/Cm2 to 149 Kg/Cm2 after immersing the bricks for six hours in water before use in Super Structure & basement and for ornamental flower beds plinth moulding and similar such type of works with all necessary projections flooring moulding corbelling, champhering watering and curing etc.including cost,conveyance,royalties and all taxes of all materials and cost of all labouir with T&P required for the work etc.complete in all respect as per direction of Engineer-in-charge. | 70.67 | cum | 5,974.86 | ₹4,22,243.36 |
| 5.01 | First Floor | 8.97 | cum | 6,381.92 | ₹57,245.82 |
| 6 | 25mm damp proof course with cc (1:2:4) using 12mm size hard granite chips
Ground floor | 22.67 | sqm | 408.55 | ₹9,261.83 |
| 7 | Providing Reinforcement cement concrete (1:1½:3) mix with nominal size stone aggregate in foundation upto a depth of 1.5m below ground level & upto bed level including cost & conveyance of all materials to site & all labour charges complete as per the direction of Engineer in Charge.
Column Base & Footing
Ground Floor | 27.69 | cum | 7,917.69 | ₹2,19,240.84 |
| 7.01 | Column & beam
Ground Floor | 11.93 | cum | 19,739.9 | ₹2,35,497.01 |
| 7.02 | 1st floor | 1.89 | cum | 22,304.08 | ₹42,154.71 |
stage.html
html • 0.18 MB
tech_eval.pdf
fin_eval.pdf
finance_592224.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.07 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_592224.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid