Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -6.90% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.3 L (2.79%)Admitted-Finance | -4.30% | ₹1.2 Cr+₹3.3 L (2.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹7.5 L (6.34%)Admitted-Finance E 315 1ST FLOOR SECTOR 27 NOIDA G B NAGAR 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -1.00% | ₹1.3 Cr+₹7.5 L (6.34%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical 15 3 625017 | MADURAI | TAMIL NADU | 625017 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 Cr
EMD Value
₹3.0 L
Closing Date
25 May 2026, 5:00 pmClosed
GM(CIVIL)
MAIN ADMIN BUILDING SECTOR 6 NOIDA
D/o and M/o Village (Construction of C C Roads and Drain Work in Pipal Wali Gali Village Kondli ) Noida
2026_NOIDA_1146765_1
11/GM/SM(WC10)/ET/26-27
Open Tender
Civil Works
Fixed-rate
90 days
NOIDA
REFER TO TENDER DOCUMENT
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.0 L
23 Jul 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 231 | Cum | 5,214.8 | ₹12,04,618.8 |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 24 | Cum | 7,790.67 | ₹1,86,976.08 |
| 3 | 12 mm cement plaster :1:4 (1 cement : 4 coarse sand) | 1,504 | Sqm | 176.77 | ₹2,65,862.08 |
| 4 | Neat cement punning | 1,504 | Sqm | 39.13 | ₹58,851.52 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.) The Contractor has detect different utilities like sewer line, Water Supply Line, Electric Cable, Telephone Cable, Gas Pipe Line(using Utility Detecting MAchine Before Start of Excavation and Shall start Excavation only after getting Permission of Engineer-in-Charge. | 903 | Cum | 136 | ₹1,22,808 |
| 6 | Filling availabe excavated earth ( excluding rock ) in trenches,plinth,side of foundation etc.in layers not exceeding 20 cm depth,comsolidating each deposited layer by ramming and watering lead up to 60 and lift upto 1.6m. | 903 | Cum | 93 | ₹83,979 |
| 7 | Earth work in embankment in ordinary soil embankment to be in 20cm layer including ramming dressing the surface to required levels with half tonne steel or wooden rammer and rolling every third and top most layer in roller 8 to 10 tonne capacity and including 1.50mtr, lift and all lead (earth shall be brought from a place with including cartage of earth by mechanically transport and T & P Labour etc required for proper completion earth shall be arranged by the contractor at his own cost. | 4,511 | Cum | 363.05 | ₹16,37,718.55 |
| 8 | Construction of granular sub-base by provkllna close araded material, spra1dln11 In uniform layers with motor grader on prepared surface, mbclng by· mix In place method with front end loadar at OMC. and compactln1 with vibratory rolier to achieve the desired density, complate as per clause 401 | 752 | Cum | 4,093.5 | ₹30,78,312 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 20 mm nominal size) | 301 | Cum | 5,746.88 | ₹17,29,810.88 |
| 10 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ ecoverable separately). | 482 | Cum | 8,141.85 | ₹39,24,371.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
11TD.pdf
Tender Documents • 28.54 MB
BOQ_2144669.xls
BOQ • 0.26 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .