Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-AOC | ₹12.5 L | 1 | Accepted-AOC Admitted |
| 2 | 2₹13.0 LRejected-AOC | ₹13.0 L | 2 | Rejected-AOC Not Admitted |
| 3 | 3₹13.7 LRejected-AOC | ₹13.7 L | 3 | Rejected-AOC Not Admitted |
| 4 | 4₹17.6 LRejected-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹17.6 L | 4 | Rejected-AOC Not Admitted |
| 5 | 5₹17.8 LRejected-AOC | ₹17.8 L | 5 | Rejected-AOC Not Admitted |
| Sl No | Description | Qty | Unit | Lalit Kumar Rajani Thekedar L2 | MOHD. ZAKI CONTRACTOR L3 | SARLA DEVI CONTRACTOR L5 | M/S OM BALA JEE CONSTRUCTION L4 | PARVEJ URF MEENU L6 | TYAGI JI CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging in dry drain/helping drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,376 | Cum | 46 ₹63,296 | 25.14 ₹34,592.64 | 32.2 ₹44,307.2 | 60 ₹82,560 | 34.34 ₹47,251.84 | 23 ₹31,648 Lowest |
| 1.02 | Silt clearance/trench digging in wetted drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,480 | Cum | 23.9 ₹59,272 | 32.25 ₹79,980 | 41.3 ₹1,02,424 | 60 ₹1,48,800 | 44.05 ₹1,09,244 | 23 ₹57,040 Lowest |
| 1.03 | Silt clearance/trench digging in under water in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 10,604 | Cum | 30 ₹3,18,120 | 37.17 ₹3,94,150.68 | 51.1 ₹5,41,864.4 | 60 ₹6,36,240 | 50.77 ₹5,38,365.08 | 22.9 ₹2,42,831.6 Lowest |
| 1.04 | Silt clearance/trench digging in under water Slush and lehal in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 14,513 | Cum | 55 ₹7,98,215 | 53.84 ₹7,81,379.92 | 69.3 ₹10,05,750.9 | 58 ₹8,41,754 | 73.54 ₹10,67,286.02 | 23 ₹3,33,799 Lowest |
| 1.05 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning | 25,052 | Sqm | 2.5 ₹62,630 | 3 ₹75,156 | 3.5 ₹87,682 | 2 ₹50,104 Lowest | 4.1 ₹1,02,713.2 | 23.3 ₹5,83,711.6 |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
30 May 2026, 2:00 pmClosed
Executive Engineer
Office Sharda Sagar Division Pilibhit
Cleaning of Chuka Drain Between Km.0.000 to Km 15.800 for Year 2026-27(Lot 01)
2026_UPIDC_1143214_23
02/E.E/2026-27
Open Tender
Civil Works
Item Rate
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹51,000
Yes
10 Jun 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging in dry drain/helping drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,376 | Cum | 518 | ₹7,12,768 |
| 1.02 | Silt clearance/trench digging in wetted drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,480 | Cum | 100 | ₹2,48,000 |
| 1.03 | Silt clearance/trench digging in under water in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 10,604 | Cum | 100 | ₹10,60,400 |
| 1.04 | Silt clearance/trench digging in under water Slush and lehal in drain including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 14,513 | Cum | 100 | ₹14,51,300 |
| 1.05 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning | 25,052 | Sqm | 10 | ₹2,50,520 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2160539.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].