Loading…
Loading…
Tender Value
₹27.8 Cr
EMD Value
₹55.5 L
Closing Date
20 Aug 2026, 6:00 pm
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_580284_1
NIT 14/2026-27 (25)
Open Tender
Civil Works
Percentage
450 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
7500 Secrectry KDA, 2500 MD RISL
₹55.5 L
Yes
31 Jul 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.
By Mechanical Means Cement Concrete | 1,556.25 | Cum | 308 | ₹4,79,325 |
| 2 | Scarifying old bituminous road by making 50x50mm furrows criss-cross at 1.0 metre intervals at 45 degree to the center line of the carriageway | 18,675 | Sqm | 2 | ₹37,350 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,112.5 | Cum | 58 | ₹1,80,525 |
| 4 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,112.5 | Cum | 59 | ₹1,83,637.5 |
| 5 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge For 5 Km | 6,225 | Cum | 66 | ₹4,10,850 |
| 6 | Granular Sub-base with Well Graded Material (Table 400-1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.
For Grading III Material | 4,183.2 | Cum | 450 | ₹18,82,440 |
| 7 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.
By Mechanical Means with all lead | 7,594.5 | Cum | 1,147 | ₹87,10,891.5 |
| 8 | Prime Coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 29,295 | Sqm | 31 | ₹9,08,145 |
| 9 | Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 29,295 | Sqm | 9.6 | ₹2,81,232 |
| 10 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30)
Grading - I (37.50mm (Nominal Size)) | 2,050.65 | Cum | 6,786 | ₹1,39,15,710.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Bid_Document_Chanellize.pdf
Tender Documents • 32.14 MB
BOQ_1031103.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].