| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹3.5 L+₹1.0 L (41.4%)Accepted-AOC | L2 | Accepted-AOC L2 Bidder | |
| 3 | L3₹3.6 L+₹1.1 L (44.7%)Accepted-AOC | L3 | Accepted-AOC L3 Bidder |
Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
16 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Lucknow
Work
2022_UPTCL_743764_2
Very short term e-tender 49/2022-23
Open Tender
Electrical Works
Piece-work
10 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹5,000
13 Jan 2023
10 Nov 2022
17 Nov 2022
10 Nov 2022
16 Nov 2022
10 Nov 2022
Amount
Following works are to be carried out at 220 KV Substation Bijnaur ,Lucknow for Erection & Commissioning of 132/33 KV 40 MVA Transformer (Make- Atlanta) in place of defective 132/33 KV 40 MVA Transformer (Make- TAL), along with all associated works including all cost of men, miscellaneous consumables, T&P, Crane etc. required for satisfactory completion of the job as per direction of supervising engineer.
1) Shifting/Dragging of Main tank of 132/33 KV 40 MVA Transformer up to 200 mtr distance including turning of the tank ,as required alongwith associated accessories from existing place to near the erection place at 220 KV Substation Bijnaur, Lucknow with all due care of safety & precautions. (01 Job for every 20 mtr dragging)
2) Additional shifting of Transformer tank upto 100 mtr distance at 220 KV Substation Bijnaur,Lucknow. (1 Job for every 5 mtr.)
3) Erection of 40 MVA Transformer RTCC Panel including termination after shifting from storage place to control room as per direction of supervising engineer.
4) Complete erection of 132/33 KV 40 MVA Transformer including erection of Radiators, Conservator Tank, Bushings, Connecting pipe lines, Cooling fans and pumps, Marshalling box, OTI, WTI, Capillary pipes etc.
5) Filling & Topping up of fresh Transformer oil from oil drums in tank, radiators, Conservator tank etc. and attending the oil leakages, if any, and all other associated works for satisfactory completion of work. All required T&P shall be arranged by the contractor.
6) Centrifuging/ Dehydration of the complete Transformer oil of 40 MVA Transformer by using Ultra High Vacuum Oil Filtration Plant (to be arranged by Contractor) after connecting the centrifuging pipes with Transformer tank to oil filtration plant with all cost of centrifuging machine, CFM operator, Lubricant etc. The work shall include recording the BDV values of oil and IR values of the Transformer periodically till the required value is achieved.
7) Dismantling of 30 KV LA's alongwith ALP structure with earthing etc.
8) Earthing of main tank of the Transformer, RTCC Panel, Marshalling box, drive mechanism of the cooling fans etc.of 40 MVA Transformer with 50 x 6 mm / 75 x 10 mm size M S flat (to be provided by department), its jointing with already laid earthmat and necessary modification in existing support for earthing of Neutral bushing and then painting of earthing strips as per technical specification/ standard practices.
9) Earthing of Transformer HV & LV neutral with separate 75 x 10 mm size M S flats by connecting with existing delta including making of new delta, if required, painting of flats and others associated works as per technical specifications.
10) Jumpering of various equipment with ACSR Zebra conductor in T/F HV bay between 132KV HV side bushing of T/F and LAs by due cutting and bending of conductor and fixing & tighting etc of the conductor/ clamps/ connectors/ spacers etc(01 job for all 3 phases)
11) Jumpering of various equipment with ACSR Zebra conductor in T/F LV bay between 33KV bushing of T/F to LV side LAs including isolators, CTs,LAs by due cutting and bending of conductor and fixing & tighting of the conductor/ clamps/ connectors/ spacers etc(01 job for all 3 phases)
12) Re-termination of existing control and power cables of Old 40 MVA Transformer and its OLTC/ RTCC panels into new 40 MVA Transformer and control and Relay panel, cooling fans and pumps, Marshaling box etc. at both ends as per cable schedule using existing cable including laying, dressing and binding of additional control cables if required as per site requirement and termination along with making necessary holes using glands plate or box where ever required, fixing of cable glands of appropriate size, providing of ferrules and cable termination as per standard practice and all other associated works as per technical specification .
13) Erection of 33 KV LA alongwith its ALP Structure included making its termination, jumpering and earthing etc and shifting from storage place safely as per technical specification.
Perfect Power Transformer Associates
HARE KRISHNA ENERGY PROJECTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .