| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-AOC | ₹28.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹32.7 LRejected-Finance | ₹32.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹33.0 LRejected-Finance | ₹33.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹35.7 L
EMD Value
₹71,500
Closing Date
7 Apr 2026, 11:00 amClosed
The Chief Engineer
EMD,Vidyut Bhavan,3rd floor,A block,Kol-700091
Thorough repair-maintenance and painting (both outside and inside) of the two-storied Data Center Building at Newtown
2026_WBSED_1017991_1
WBSEDCL / CE / EMD / 2025-26 / e tender / 47 Date 5.3.2026
Open Tender
CIVIL WORKS
Percentage
150 days
Data center, New Town
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹71,500
31 Jul 2026
5 Mar 2026
9 Apr 2026
16 Mar 2026
7 Apr 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish from the working site and disposal of the same beyond the SCADA compound, in conformity with the Municipal / Corporation Rules for such disposal including all leads and lifts, loading into truck and cleaning the site in all respect complete as per direction of EIC from any floor. | 2 | Cum | 613 | ₹1,226 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and and removing rubbish from the working site and disposal of the same beyond the SCADA compound, in conformity with the Municipal / Corporation Rules for such disposal including all leads and lifts, loading into truck and cleaning the site in all respect complete as per direction of EIC from any floor. Upto 150 mm thick. | 50 | Cum | 1,105 | ₹55,250 |
| 3 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish from the working site and disposal of the same beyond the SCADA compound, in conformity with the Municipal / Corporation Rules for such disposal including all leads and lifts, loading into truck and cleaning the site in all respect complete as per direction of EIC from any floor. | 50 | Sqm | 22.32 | ₹1,116 |
| 4 | Dismantling R.C. floor, roof, beams etc. including cutting rods and and removing rubbish from the working site and disposal of the same beyond the Vidyut Bhavan compound, in conformity with the Municipal / Corporation Rules for such disposal including all leads and lifts, loading into truck and cleaning the site in all respect complete as per direction of EIC from any floor. including stacking of steel bars. | 5 | Cum | 2,122 | ₹10,610 |
| 5 | Easing and oiling W.I. Gate or G.I. Gate, Grill or other ornamental works | 6 | Sqm | 7 | ₹42 |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4). Ground floor including roof. | 20 | Sqm | 736 | ₹14,720 |
| 7 | Brick work with 1st class bricks in cement mortar (1:6) In superstructure, In Gr. floor including roof. | 5 | Cum | 5,636 | ₹28,180 |
| 8 | Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4cementitious material) or as per manufacturer's specification for waterproofing layer. | 5 | Sqm | 258 | ₹1,290 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works. Upto roof of ground floor | 5 | Sqm | 335 | ₹1,675 |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 2nd floor including roof. | 5 | Sqm | 353 | ₹1,765 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_2501679.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].