Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹19.1 L+₹6,291.22 (0.33%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹21.2 L+₹2.1 L (11.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹22.5 L+₹3.4 L (18.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹24.0 L+₹5.0 L (26.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MOHAMMED KAYANIKKARA L1 | NAUFAL P L3 | ARDEN INFRATECH PRIVATE LIMITED L2 | Sasikumaran T L4 | Jishnu Das P L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Hand rail repair works | ||||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.03 | Hectare | 48,552.7 ₹1,262.37 Lowest | 54,067 ₹1,405.74 | 48,714 ₹1,266.56 | 57,312 ₹1,490.11 | 57,312 ₹1,490.11 |
| 1.00 | 16.18:Replacement of Damaged Concrete Railing. | 194.4 | RM | 525.19 ₹1,02,096.94 Lowest | 584 ₹1,13,529.6 | 527 ₹1,02,448.8 | 620 ₹1,20,528 | 1,000 ₹1,94,400 |
| 1.00 | 14.6:Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. | 97.2 | RM | 2,225.61 ₹2,16,329.29 Lowest | 2,478 ₹2,40,861.6 | 2,233 ₹2,17,047.6 | 2,627 ₹2,55,344.4 | 3,500 ₹3,40,200 |
| 1.00 | 14.1C.1.2.A:Furnishing and Placing RCC Grade M30 using concrete mixer in super-structure as per drawing and Technical Specification For T-beam & slab - Height upto 5m | 7.29 | cum | 9,800.57 ₹71,446.16 Lowest | 10,913 ₹79,555.77 | 9,833 ₹71,682.57 | 11,569 ₹84,338.01 | 11,569 ₹84,338.01 |
| 1.00 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | 0.66 | MT | 86,209.78 ₹56,553.62 Lowest | 96,001 ₹62,976.66 | 86,592 ₹56,804.35 | 1,01,762 ₹66,755.87 | 1,01,762 ₹66,755.87 |
| 1.01 | OD92437/2026-2027:Polymer Modified Mortar (Pre-Packed): Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturer?s specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification . Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness upto 50mm of PMM for patch area repaired) | 118.88 | sqm | 3,849.28 ₹4,57,602.41 Lowest | 4,286 ₹5,09,519.68 | 3,862 ₹4,59,114.56 | 4,544 ₹5,40,190.72 | 4,544 ₹5,40,190.72 |
| 1.01 | OD153320/2025-2026:Scrapping and cleaning old painted surface with sand paper, wire brush, coir brush, etc including removal of all kind of fungus/mess,dirty and shabby look patches and any kind of old paint from the wall surface and make the surface fit for applying new coat of paint including labour charges etc. complete. | 742.3 | sqm | 48.26 ₹35,823.4 Lowest | 53 ₹39,341.9 | 48.41 ₹35,934.74 | 57 ₹42,311.1 | 57 ₹42,311.1 |
| 1.01 | 55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013. | 1,222.46 | sqm | 364.06 ₹4,45,048.79 Lowest | 405 ₹4,95,096.3 | 365.25 ₹4,46,503.52 | 430 ₹5,25,657.8 | 430 ₹5,25,657.8 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 47.25 | cum | 6,070.26 ₹2,86,819.79 Lowest | 6,759 ₹3,19,362.75 | 6,090 ₹2,87,752.5 | 7,165 ₹3,38,546.25 | 7,165 ₹3,38,546.25 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
16 Sept 2026, 3:00 pmClosed
Executive Engineer,PWD Bridges Division, Palakkad.
O/o the Executive Engineer, PWD Bridges Division, Palakkad.
GENERAL-Bridge Safety works- Urgent repair works to Poonkudi Bridge in Eranad LAC in Malappuram district-Repair works-General Civil Work.
2026_PWD_868090_1
PWD/BR/TR/17220/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Poonkudi Bridge
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
22 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hand rail repair works | |||||
| 1.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.03 | Hectare | - | - |
| 1.002 | 16.18:Replacement of Damaged Concrete Railing. | 194.4 | RM | - | - |
| 1.003 | 14.6:Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. | 97.2 | RM | - | - |
| 1.004 | 14.1C.1.2.A:Furnishing and Placing RCC Grade M30 using concrete mixer in super-structure as per drawing and Technical Specification For T-beam & slab - Height upto 5m | 7.29 | cum | - | - |
| 1.005 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | 0.66 | MT | - | - |
| 1.006 | OD92437/2026-2027:Polymer Modified Mortar (Pre-Packed): Providing and Applying single component, high strength, fibre reinforced, thixotropic cementitious patch repair mortar that achieves compressive strength minimum of 15 MPa at 1 day and 45 MPa at 28 days and capable of applying upto 50mm thick in single layer such as Renderoc SP40 of Fosroc or Master Emaco S 348 of BASF or equivalent, to the prepared concrete area for thickness up to 50mm, after applying epoxy resin based bonding coat as per manufacturer?s specification, before the bonding agent becomes tack free, initially by hand and finally finishing the same with trowel carefully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns, slabs, beam etc. at all heights, where the thickness of application is less than 50 mm in patches as per specification . Item rate is inclusive of all material including the bond coat, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete and as directed by Engineer-in-charge and/or consultant. (Payment to be made in Sq.M for thickness upto 50mm of PMM for patch area repaired) | 118.88 | sqm | - | - |
| 1.007 | OD153320/2025-2026:Scrapping and cleaning old painted surface with sand paper, wire brush, coir brush, etc including removal of all kind of fungus/mess,dirty and shabby look patches and any kind of old paint from the wall surface and make the surface fit for applying new coat of paint including labour charges etc. complete. | 742.3 | sqm | - | - |
| 1.008 | 55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013. | 1,222.46 | sqm | - | - |
| 1.009 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 47.25 | cum | - | - |
stage.html
html • 0.02 MB
finance_1470260.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.28 MB
BOQ_1470260.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .