Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,977
Closing Date
20 Aug 2026, 4:00 pmClosed
Divisional Manager Works - Marketting
HMT Zainakote, Srinaagr
Providing/Fixing of 150 mm PVC pipes including construction of collection chamber and inspection chambers at different intervals for smooth flow into the CETP at District hospital Kupwara
2026_SICOP_321052_1
e Nit No. 05 of 07/2026-27/ of DMW (M) Dated 31/0
Open Tender
Civil Works - Others
Percentage
183 days
Kupwara
As Per e Nit
2 documents required · 2 mandatory
₹1,500
Divisional Manager Works 05600101000000684
₹9,977
14 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas disposed earth to be leveled and neatly dressed in all kinds of soil | 74.76 | Cum | 263.44 | ₹19,694.77 |
| 2 | Supplying/filling dry stone soling tightly hand packed under foundation and under floors incl. all leads, lifts and all carriages upto site of work | 21 | Cum | 731.74 | ₹15,366.54 |
| 3 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering, all work upto plinth level in 1:4:8 (1 cement:4 coarse sand: 8 graded stone agg. 40mm nominal size) using crushed agg. Including all complete. | 21 | Cum | 3,984.38 | ₹83,671.98 |
| 4 | P/L in position Reinforce cement concrete of specified grade excluding the cost of centering and shuttering, all work up to plinth level in 1:1.5:3 mix M20 grade using crushed agg. Including all work complete. | 6.58 | Cum | 7,323.38 | ₹48,187.84 |
| 5 | Centering and shuttering incl. strutting, propping etc. and removal of form work in foundation and plinth | 9.66 | Sqm | 255 | ₹2,463.3 |
| 6 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in superstructure above plinth level up to floor V level in cement mortar 1:6 (1 cement: 6 coarse sand include. All carriages/head load up to site of work complete. | 9.64 | Cum | 8,500 | ₹81,940 |
| 7 | Steel reinforcement for RCC work incl. straightening, cutting, bending, placing in position and binding all complete cold twisted bars (TMT bars) incl. all carriages complete. | 385 | kgs | 91.34 | ₹35,165.9 |
| 8 | P/L of 15 mm thick cement plaster in 1:4 mix with proper curing | 123.97 | sqm | 213 | ₹26,405.61 |
| 9P/F of PVC pipe including cost of all fitting complete job. | |||||
| 9.1 | 4" dia. 100 MM (prince C type) | 240 | rft | 80 | ₹19,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1069763.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .