Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 LAdmitted-Finance 01 OPPOSITE D C OFFICE LAL CHOWK ANANTNAG LAL CHOWK ANANTHNAG JAMMU KASHMIR 192101 UDYAM JK 01 0002801 | ANANTNAG | JAMMU AND KASHMIR | 192101 | ₹11.0 L | L2 | Admitted-Finance |
| 3 | L3₹11.0 LAdmitted-Finance | ₹11.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R .D ENTERPRISES L3 | SIMPLE ENGINEERING AND CO. L1 | BLUE STAR AND CO L2 |
|---|---|---|---|---|---|---|
| 1.00 | ENGAGEMENT OF THREE (03) NOS. AIR POLLUTION CONTROL DEVICE OPERATORS (SKILLED CATEGORY) IN 3 SHIFT DURING 24 HRS. HAVING ABILITY OF FAULT-FINDING, MINOR REPAIRING CONNECTED WITH THE ELECTRO-MECHANICAL WORKS, WATER CIRCULATION, SLURRY WATER DISCHARGE SYSTEM INCLUDING DAMPER & ID FAN OPERATION. | 12 | Monthly | 49,600 ₹5,95,200 | 49,030 ₹5,88,360 | 49,260 ₹5,91,120 |
| 2.00 | ENGAGEMENT OF ONE (01) NOS. SWEEPER FOR SWEEPING THE WHOLE AIR POLLUTION CONTROL DEVICE AREA, CLEANING THE DRAIN, SPRADING DISINFECTANT ETC. (ALL SWEEPING MATERIAL SUPPLIED BY THE CONTRACTOR). | 12 | Monthly | 13,220 ₹1,58,640 | 13,047 ₹1,56,564 | 13,260 ₹1,59,120 |
| 3.00 | PROPORTIONATE CASUAL LEAVE IMPOSED AS PER MPL. SECRETARY'S CIRCULAR NO.23 OF 2012-13 DT. 10.12.12 VIDE THE MIC ITEM NO.M 39.7 DT.14.08.12 ADDING THE TOTAL WAGES AMOUNT 4.53% OF SL. NO. [1]+[2] | 0.05 | ONE ITEM | 7,53,480 ₹34,132.64 | 7,44,924 ₹33,745.06 | 7,50,240 ₹33,985.87 |
| 4.00 | ENGAGEMENT OF A RELIEVER FOR AIR POLLUTION CONTROL DEVICE OPERATORS (SKILLED CATEGORY) IN THE WEEKLY OFF-DAYS. | 156 | DAYS | 630 ₹98,280 | 623 ₹97,188 | 626 ₹97,656 |
| 5.00 | ENGAGEMENT OF A RELIEVER FOR THE SWEEPER IN THE WEEKLY OF- DAYS. | 52 | DAYS | 504 ₹26,208 | 498 ₹25,896 | 500 ₹26,000 |
| 6.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60(SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN
PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | 12 | Monthly | 4,600 ₹55,200 | 4,575 ₹54,900 | 4,580 ₹54,960 |
| 7.00 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR
MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60 (SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | 12 | Monthly | 4,600 ₹55,200 | 4,525 ₹54,300 | 4,580 ₹54,960 |
| 8.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CLEANING OF BLOWER BY OPENING THE INLET HUB AND REMOVING CANVAS CLOTH. THE DEPOSITED CARBON FROM INSIDE THE BLOWER TO BE CLEANED MANUALLY AND BY HIGH-PRESSURE JET PUMP. AFTER CLEANING THE INLET HUB TO BE REFITTED AND CANVAS CLOTH TO BE RE-WRAPPED. | 12 | Monthly | 3,300 ₹39,600 | 3,220 ₹38,640 | 3,260 ₹39,120 |
| 9.00 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CHIMNEY DOOR TO BE UNSCREWED AND DEPOSITED CARBON PARTICLES ARE TO BE MANUALLY REMOVED FROM INSIDE THE CHIMNEY BASE AND WASHED WITH WATER. REMOVED CARBON PARTICLES TO BE PACKED UP IN GUNNY BAGS AND DROPPED AT THE
DEPARTMENTAL VAT. | 12 | Monthly | 3,500 ₹42,000 | 3,450 ₹41,400 | 3,460 ₹41,520 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
30 May 2026, 2:00 pmClosed
D.G. (E)
Chaplin Bhawan, New Market, Esplanade Kolkata-700 013 West Bengal
OPERATION AND MAINTENANCE OF AIR POLLUTION CONTROL DEVICE CONNECTED WITH ELECTRIC FURNACES NO. 1 AND 2 AT SHANAGAR BURNING GHAT
2026_KMC_1024447_1
KMC/LTG/CRM/SBG/APC/OM/01/25 -26 (for 1st call)
Open Tender
Miscellaneous Services
365 days
SHANAGAR BURNING GHAT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,000
9 Jun 2026
15 May 2026
1 Jun 2026
15 May 2026
30 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ENGAGEMENT OF THREE (03) NOS. AIR POLLUTION CONTROL DEVICE OPERATORS (SKILLED CATEGORY) IN 3 SHIFT DURING 24 HRS. HAVING ABILITY OF FAULT-FINDING, MINOR REPAIRING CONNECTED WITH THE ELECTRO-MECHANICAL WORKS, WATER CIRCULATION, SLURRY WATER DISCHARGE SYSTEM INCLUDING DAMPER & ID FAN OPERATION. | - | Monthly | - | - |
| 2 | ENGAGEMENT OF ONE (01) NOS. SWEEPER FOR SWEEPING THE WHOLE AIR POLLUTION CONTROL DEVICE AREA, CLEANING THE DRAIN, SPRADING DISINFECTANT ETC. (ALL SWEEPING MATERIAL SUPPLIED BY THE CONTRACTOR). | - | Monthly | - | - |
| 3 | PROPORTIONATE CASUAL LEAVE IMPOSED AS PER MPL. SECRETARY'S CIRCULAR NO.23 OF 2012-13 DT. 10.12.12 VIDE THE MIC ITEM NO.M 39.7 DT.14.08.12 ADDING THE TOTAL WAGES AMOUNT 4.53% OF SL. NO. [1]+[2] | 0.2 | ONE ITEM | - | - |
| 4 | ENGAGEMENT OF A RELIEVER FOR AIR POLLUTION CONTROL DEVICE OPERATORS (SKILLED CATEGORY) IN THE WEEKLY OFF-DAYS. | - | DAYS | - | - |
| 5 | ENGAGEMENT OF A RELIEVER FOR THE SWEEPER IN THE WEEKLY OF- DAYS. | - | DAYS | - | - |
| 6 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60(SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN
PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | - | Monthly | - | - |
| 7 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR
MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60 (SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | - | Monthly | - | - |
| 8 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CLEANING OF BLOWER BY OPENING THE INLET HUB AND REMOVING CANVAS CLOTH. THE DEPOSITED CARBON FROM INSIDE THE BLOWER TO BE CLEANED MANUALLY AND BY HIGH-PRESSURE JET PUMP. AFTER CLEANING THE INLET HUB TO BE REFITTED AND CANVAS CLOTH TO BE RE-WRAPPED. | - | Monthly | - | - |
| 9 | (AS PER PRESENT MARKET PRICE):LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CHIMNEY DOOR TO BE UNSCREWED AND DEPOSITED CARBON PARTICLES ARE TO BE MANUALLY REMOVED FROM INSIDE THE CHIMNEY BASE AND WASHED WITH WATER. REMOVED CARBON PARTICLES TO BE PACKED UP IN GUNNY BAGS AND DROPPED AT THE
DEPARTMENTAL VAT. | - | Monthly | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_2517707.xls
BOQ • 0.34 MB
form.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid