Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC VADANA HOUSE KUMMANNOOR | KERALA | ₹1.2 L | 1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Mathachan m vadana L1 |
|---|---|---|---|---|
| 1.00ramp | ||||
| 1.00 | OD433603/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 1.45 | cum | 3,200 ₹4,640 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6 | sqm | 303 ₹1,818 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.5 | cum | 8,560 ₹1,15,560 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,320
Closing Date
16 Jul 2026, 2:00 pmClosed
SARITHA P GOPAL
O/O Assistant Engineer,LSGD Ayarkunnam
Pr No 183/25-26 2 Ramps From Thiruvanchoor Vannalloorkara Road to Kezhuvally padasekharam
2026_LSGD_859180_1
AE/LIDEW/183/ARKM/26-27
Open Tender
Civil Works - Others
Item Rate
90 days
Ayarkunnam GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,320
Yes
17 Sept 2026
6 Jul 2026
18 Jul 2026
6 Jul 2026
16 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ramp | |||||
| 1.001 | OD433603/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | - | cum | - | - |
| 1.002 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1452700.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
183pa.pdf
Tender Documents • 0.25 MB
183sbd.pdf
Tender Documents • 1.97 MB
183ft.pdf
Tender Documents • 0.25 MB
183af.pdf
Tender Documents • 0.24 MB
Epaymentform.pdf
Tender Documents • 0.01 MB
Formofintegritypact.pdf
Tender Documents • 0.01 MB
183nit.pdf
Tender Documents • 0.02 MB
BOQ_1452700.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .