Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | A M KUNJUMOHAMMED L1 |
|---|---|---|---|---|
| 1.00Rectification of preventing leakage | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 420 | sqm | 10.2 ₹4,284 Lowest |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 3.79 | cum | 1,709.87 ₹6,483.83 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.8 | cum | 9,426.05 ₹1,67,821.39 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 153.2 | sqm | 424.78 ₹65,076.3 Lowest |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 269.76 | sqm | 378.17 ₹1,02,015.14 Lowest |
Tender Value
₹3.1 L
EMD Value
₹7,856
Closing Date
15 Oct 2025, 1:00 pmClosed
Assistant Executive Engineer
PVIP Sub Division No IV Aluva
Rectification of canal lining between Ch. 1350m and Ch.1380m of Kottappuram SBC and between Ch. 2000m and 2008.30m of Varappuzha SBC
2025_Irrig_801007_3
16/AEE4/PVIP/2025-26
Open Tender
Civil Works - Canal
Item Rate
180 days
Aluva
7 documents required · 7 mandatory
₹695
Yes
₹7,856
Yes
12 Nov 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
15 Oct 2025
10 Oct 2025
10 Oct 2025 - 15 Oct 2025
Amount
Rectification of preventing leakage
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Bidder Name
A M KUNJUMOHAMMED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347504.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .