Loading…
Loading…
| # | Company | Amount | Rank |
|---|---|---|---|
| 1 | L1₹29.4 Cr | L1 | |
| 2 | L2₹30.3 Cr+₹97.0 L (3.30%) | L2 |
Tender Value
₹27.7 Cr
EMD Value
₹5 L
Closing Date
23 Feb 2026, 5:30 pmClosed
MR Suyash Sharma
PHED RAIPUR
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 19.0m and 25m length approach bridge, approach road, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water V.T. pumps and motors 3no of 35BHP having -70638LPH discharge and 93.0m head at village kewarabahara , 2.5 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors 02 no of 15 BHP having 27500LPH and 81m head. 54063LPH discharge 148m head -3no of 50BHP,Clear Water Electric Sub station160 KVA/11/0.415 KV with all required Work at village pushla, 65 KL capacity 21 staging MBR-1 no at village pushla,100 KL capacity 25 staging MBR-1 no at village sonhat,150 KL capacity 30 staging MBR-1 no at village anandpur, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 pipe 250 mm Dia - 9150 m And Clear water pumping main 150 mm Dia DI K-9 Length- 17936 m,200mm dia length -9951m total -27887m& Clear Water Gravity Mains O-pvc Pipe PN-16- 250mm dia – 383m , 160mm dia – 20906m., 110mm dia – 50563m. Total Length- 71852 m with all required valves &specials,as per attached key plan map, Providing and fixing Bulk flow meters for Entire Scheme upto inlet of following Village OHTs, nala crossing and work include taking permission to PWD,WRD deptt.etc. Allied all civil works including Boundary wall around WTP campus completion period 12 months including rainy season Integration of all components comprises of 03 month testing and 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis).KATGHODI GROUP WATER SUPPLY SCHEME BLOCK- SONHAT DISTRICT –KOREA
184607
331/Tendercell/EE/MD/Raipur Date 29-01-2026
RESTRICTED TENDER
WORKS
PERCENTAGE
12 days
PHED RAIPUR
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
14 documents required · 14 mandatory
₹0
₹5 L
23 Feb 2026
31 Jan 2026
26 Feb 2026
31 Jan 2026
25 Feb 2026
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .