Loading…
Loading…
Tender ID
Tender Value
₹4.8 L
EMD Value
₹9,606
Closing Date
19 May 2026, 11:00 amClosed
E.O,RAJPUR SONARPUR MUNICIPALITY
RAJPUR SONARPUR MUNICIPALITY
Construction WOODEN BRIDGE at Panchpota Santinagar and Natundiyara Sitala Mandir in ward no-03 under Rajpur Sonarpur Municipality.
2026_MAD_1023875_1
WBMAD/ULB/RSM/2121/25-26/2nd Call
Open Tender
CIVIL WORKS
Percentage
30 days
RAJPUR SONARPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,606
15 May 2026
11 May 2026
21 May 2026
11 May 2026
19 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Sal-bullah piles at work site, including dressing and making one end pointed(vi) 200mm diameter | 1 | MTR | 386 | ₹385.61 |
| 2 | Supplying Sal-bullah piles at work site, including dressing and making one end pointed(iii) 150mm diameter | - | MTR | 263 | - |
| 3 | Supplying Sal-bullah piles at work site, including dressing and making one end pointed(i) 100mm diameter | 1 | MTR | 142 | ₹141.86 |
| 4 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.(vi) 225mm diameter | - | MTR | 119 | - |
| 5 | Sal-wood work rough dressed including necessary hoisting and fitting, and fixing in position including cost of nails but excluding cost of bolts, nuts and washer in Bridge Work excluding Bridge Floor. | 1 | cum | 55,160 | ₹55,104.84 |
| 6 | Sal-wood work rough dressed in bridge floor fitted and fixed with patent or round headed nails including cost of materials and fittings. | - | cum | 62,150 | - |
| 7 | Coal tarring on wooden surfaces including cost of materials (a) Double coat. | - | SQM | 36 | - |
| 12 | GST @ 18% | - | Nos | 1 | - |
| 13 | Labour Welfare Cess @ 1% | - | Nos | 1 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_2516401.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .