Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
13 Jul 2026, 12:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
MGS
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The Tenderer must have successfully completed or substantially completed any of the following during last 7(Seven) years , ending last day of month previous to the one in which tender is invited: (i) Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. NOTE :- Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/ registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar Nature of work means - ''Any work involving networking system using switches/router/WI-FI/IP Based CCTV any Goverment Organization/PSU.''
114 conditions · 18 needing a document upload
Verification of Tender's credentials:- The tenderers shall submit a copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder is enclosed as Annexure-V. Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested / digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected.
A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
Following documents shall be submitted by the tenderer in case of Sole Proprietorship Firm: Sole Proprietorship Firm: (i) An undertaking that he is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (ii) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
Following documents shall be submitted by the tenderer in case of HUF: A copy of notarized affidavit on Stamp Paper declaring that his Concern is a proprietary Concern and he is sole proprietor of the Concern OR he who is signing the affidavit on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii) An undertaking that the HUF is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which HUF was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (iii) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
Following documents shall be submitted by the tenderer in case of Partnership Firm: The tenderer shall clearly specify that the tender is submitted on behalf of a partnership firm. (i) A notarized copy of partnership deed. (ii) A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm. Note :- One or more of the partners of the firm or any other person (s) shall be designated as the authorized person (s) on behalf of the firm, who will be authorized by all the partners to act on behalf of the firm through a "Power of Attorney", specially authorizing him / them to submit & sign the tender, sign the agreement, receive payment, witness measurements, sign measurement books, make correspondences, compromise / settle / relinquish any claim (s) preferred by the firm, sign "No Claim Certificate", refer all or any dispute to arbitration and to take similar such action in respect of the "said tender" / contract. Such "Power of Attorney" shall be notarized / registered and submitted along with the tender.
Following documents shall be submitted by the tenderer in case of Company registered under Companies Act 2013: (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation (iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv) An undertaking that the Company is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (v) All other documents in terms of explanatory notes in clause 10 of GCC 2022
Following documents shall be submitted by the tenderer in case of LLP (Limited Liability Partnership): If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the tenderer shall submit along with the tender: A copy of LLP Agreement. (i)A copy of Certificate of Incorporation (ii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iii)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (iv)All other documents in terms of Para 10 of the Tender Form (Second Sheet). (v) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under.
In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit besides banning of business for a period of upto five years.
In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
Certificates which may be an attested Certificate from the client, Audited Balance Sheet duly certified by the Chartered Accountant etc regarding contractual payments received in the past.
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GCC -2022 with latest amendments and instructions is an integral part of the contract document. All terms and conditions mentioned therein to be followed.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
In addition to GCC 2022 and Indian Railway Unfiled standard specification works materials volume I II 2010, revised up to date, special condition attached shall also apply.
Taxes as per GST (1st july2017), Income tax, TDS, Sales tax/Business tax, Royalty etc Royalty etc. will be recovered as per extant instruction on the subject.
Certificates from private individuals for whom such works are executed being executed is not acceptable.
Eligibility criteria for works tender in respect of partnership firms to be dealt as per GCC -2022.
In case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for this tender.
Any Conditional offer will be summarily rejected.
For Standard Financial criteria and Standard Technical criteria - Tenderers are required to submitted authenticated certificate along with the tenders from officers of government or semi- government/public sector undertakings under whom the work has been executed indicating there in the name of work executed, value of works/payment details and period during which completed. Such certificates should have signature and seal of the concerned officer. In the absence of such certificate the tender may not be considered. Certificates from private individuals for whom such works are executed being executed is not acceptable.
BOOKS OF REFERENCE: These tender documents are to be read with the followings books with versions updated/corrected/modified up to the date of tender opening: 1) Standard General Conditions of Contract 2022 as amended by updated correction slips termed GCC 2022. 2) Eastern Railway L&M Sch 87 as amended by updated correction slips. 3) E. C. Railway Engineering department unified standard schedule or rates 2012 as amended by updated correction slips (termed USSOR, 2012) up to the date of tender dropping. 4) Standard specifications contained in Indian Railways Hand Book Specifications (works and materials)2010. These four books are where-in-after called the "Books of reference" and shall govern this tender as well as the contract resulting from the acceptance from this tender, to the extent that these contents do not conflict with the contains of the various chapters of these documents.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Railway administration will not be responsible for any delay/difficulties/inaccessibility of the downloading facility for any reason whatsoever. In case of any discrepancy between the tender document downloaded from the internet and the master copy available in the office mentioned above, later shall prevail and will be binding on the tenderer. No claim on this account will be entertained.
If working through contract Labour, the contractor must register with Labour Commissioner necessary license to be submitted with tender or to be produced before signing of contract agreement.
The contractor will be permitted to make use of the service roads already existing within the Railway possession. If additional service roads are required within Railway premises the contractor may be allowed to make them at his own costwith the prior approval of the Railway's Engineer. All service roads required outside Railway boundary shall be constructed by the contractor at his own risk and cost. These roads shall be maintained by the contractor at his own cost. The Railway reserves the right to make use of these service roads as and when necessary without any payment to the contractor.
The intending tenderer should study with General Conditions of Contract, Special Conditions of Contract, and Instructions to Tenderer, Technical Specification, Drawings, Documents, Schedules etc. enclosed and also the General Conditions of Contract, 2022 of the Engg. Department with up to date modifications and IRS Conditions of Contract for the Stores department with up to date modifications all herein after collectively referred to as Tender Specification.
Provision in the instructions, General Conditions of Contract and Special Conditions of the Contract in the tender documents will override any overlapping provisions of General Conditions of contract 2022 of the Engg with up to date modifications and IRS Conditions of Contract for the Stores department with up to date modifications. When there is conflict between General Conditions of contract 2022 and special conditions of the contract, the special conditions shall prevail.
Other Local Taxes levied either by Governmental agency or by Municipal agency shall not be paid by the Railway. These are deemed to be included in the F.O.R. price, unless specifically brought out in the offer.
SCHEDULE COVERING DELIVERY OF MATERIALS AND THE EXECUTION OF THE WORK AT SITE: The tenderer shall attach to his offer a time schedule showing the guaranteed time (i) schedule for the supply of materials, the progress and completion of the works at site. (ii) The time Schedule shall be as referred to in Para - 4 of Instruction to tenderer. (iii) The tenderer should offer the time schedule for supply of materials, the duration of erection and completion period for the work and it should be kept the barest minimum. This aspect will be particularly taken into account while examining the offer. In any case this period shall not be more than the time specified in the tender documents, reckoning from the of date of issue of Letter of Acceptance.
GENERAL REQUIREMENT :(a)All documents to be submitted in connection with this tender will be written in English. (b) Dimensions, weights etc. shall be in Metric System/British Standard Equivalents. The technical terms and symbols to be used will be as per General and Subsidiary Rules/Signal Engineering Manual/Extant Practice of East Central Railway.
ADVICE OF CANCELLATION OF DOCUMENTS BY TENDERER: The Cancellation of any document such as Power of Attorney/Partnership deed etc. should be forthwith communicated by the contractor to the Rly. Administration in writing failing which the Rly. Administration shall have no responsibility or liability for an action taken on the strength of the said document.
THE RAILWAY NOT BOUND TO ACCEPT ANY TENDER: The Railway shall not be bound to accept the Lowest or any Tender or to assign any reason for non-acceptance or rejection of a Tender. No Tender shall be deemed to have been accepted unless such acceptance shall have been notified in writing to the successful tenderer by the Railway. The Railway reserves the right to accept any tender in respect of the whole or any portion of the work specified in the tender or to divide or reduce the work or to accept any tender for less than the tendered quantity without assigning any reason whatsoever.
The General Instructions and Special Instructions mentioned in various para to be read in conjunction with uploaded tender document which contains important formats/Annexures and Technical bindings and schedule of work etc.
Letter of credit as mode of payment in works tenders or service tenders is available. If is an option for the contractor to take payment from Railways through a letter of credit (LC) arrangement. The details letter of credit is as under:-
Option for Letter of Credit (V) In case tender opts for payment through LC, following shall be the procedure to deal release of payment through LC: (a) The LC shall be a sight LC. (b) The contractor shall select his Advising/Negotiating bank for LC. The incidental cost forward issue of LC and its operation thereof shall be borne by the contractor.(c) SBI, New Delhi ,Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units fortenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15% per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d) The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalized by the engineer in consultation with the contractor on the basis of expected progress of work. (e) The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit(LC). As sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor. (f) The LC terms and conditions shall inter-aliaprovided that Railways will issue a Document of Authorization (format enclosed as Annexure 2) after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank. (g) The acceptable, agreed upon document for payments to be released under the LC shall bethe Document of Authorization.
Option for Letter of Credit (VI) In case tender opts for payment through LC, following shall be the procedure to deal release of payment through LC: (h) The Document of Authorization shall be issued by Railway Accounts Office against each bill passerby Railways. (i) On issuance of Document of Authorization, acopy of Document of Authorization shall be posted on IREPSfor download by the contractor. A digitally signed copy of Document of Authorization shall also be sent by Railway Account Officer to Railway's bank (Local SBI Branch). (j) The contractor shall take print out of the Document of Authorization available on IREPS and present his claim to his bank (advisingBank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorization, Bill of Exchange and Bill. (k) The payment against LC shall be subject to verification from Railway's Bank(Local SBI Branch). (l) The contractor's bank (advising bank) shall submit the documents to the Railway's Bank (Local SBIBranch). (m) The railway's bank (issuing bank) shall, after verifying the claim so received w.r.t the digitally signedDocument of Authorization received from Railway Accounts Office, release the payment to contractor's bank (advisingbank) for crediting the same to contractor's account. (n) Anynumber of bills can be dealt within on LC, provided the sumtotal of payments to contractor is within the amount for which LC has been opened. (o) The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor. (p) The release of performance guarantee orsecurity deposit shall be dealt directly by railway with the contractor i.e., not through LC.
For the service rendered by the RITES for inspection of materials supplied by the contractor in works contract, inspection charges @ 1% of the cost of materials including all taxes, excise duty 27.1.1 etc. are to be borne by the contractor& no inspection charges are payable to RDSO by contractor for RDSO Inspected materials.
Provision of latest labour laws must be followed as per applicable.
Provision of CCTV Cameras at Non-Interlocked Manned LC Gates at different locations over DDU division.
SG-DSE-T-OT-04-26
SG-DSE-T-OT-04-26
Open
Works - General
6 Months
Chandauli, Uttar Pradesh
₹0
₹9.7 L
13 Jul 2026
19 Jun 2026
29 Jun 2026
105 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,86,43,985.53 | ||
| — | 192.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of Full HD Fixed Bullet type IP Colour Camera along with 128 GB or higher SD Card, housing and mount and all accessories required for installation purposes As Per RDSO specification No RDSO/SPN/TC/65 /2021Version 6.0 or latest. It should be STQC complied. Execution of work as instruction of site engineer. Inspection - RDSO | — | — | — | 19,46,403.84 | |
| — | 48.00 | — | — | ||
| Supply, Installation,Testing & Commissioning of Field Switch 8-POE port and 2 Nos of 1G Optical port (required SFP module is also required to be provided) as per Spec. No: RDSO/SPN/TC/65/2021 Ver.6.0 or latest. Execution of work as instruction of site engineer. Inspection - RDSO | — | — | — | 8,35,526.4 | |
| — | 48.00 | — | — | ||
| Supply of Rack mounter 8 channel NVR , IP camera support, PTZ camera control support, Full HD(1920 X 1080) Recording Resolution, H.264,H.265,MPEG-4 Compression Technique, Recording Speed:25fps, Ethernet, HDMI, VGA,USB Supported Interface-Upto 6TB capacity for each disk, Make: Sparsh,CP-plus or Prama. Inspection- RDSO. | — | — | — | 3,64,756.32 | |
| — | 48.00 | — | — | ||
| Supply & Installation of Surveillance Hard Disk Drive 4 TB capacity As per technical specification attached as Annexure-1. Execution of work as instruction of site engineer. Inspection- Consignee | — | — | — | 2,95,206.72 | |
| — | 2.00 | — | — | ||
| Supply & Installation of 64 Channel Network Video Recoder and 64TB storage after RAID 5/6 configuration with HDD(8 nos. of HDD capacity 8TB each), 2 nos. ethernet complete with all other accessories as per RDSO spec. No: RDSO/SPN/TC /65/2019 Rev.5.0 or latest. Execution of work as instruction of site engineer. Inspection - RDSO | — | — | — | 3,32,328.1 | |
| — | 10.00 | — | — | ||
| Supply of 22" LED Monitor, Make Dell/Samsung/HP/Acer or better. Inspection- Consignee. | — | — | — | 94,190.4 | |
| — | 2.00 | — | — | ||
| Supply of 4K UHD Display (55 inch) as per RDSO spec. No: RDSO/SPN/TC/65 /2021 Rev.6.0 or latest . Inspection- Consignee. | — | — | — | 89,127.22 | |
| — | 2.00 | — | — | ||
| Installation, Testing & Commissioning of Full HD Large Format Display Monitor (55 inch).All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. Execution of work as instruction of site engineer. | — | — | — | 1,710 | |
| — | 10.00 | — | — | ||
| Supply of On line pure sine wave UPS of 1KVA with SMF batteries. Minimum 1600VAH for backup of one hour. Make - Microtek, Eton or APC. As per technical specification attached as Annexure-1 Inspection- Consignee. | — | — | — | 2,36,483.3 | |
| — | 10.00 | — | — | ||
| Supply of Integrated service router with 3 onboard GE, 2 NIM Slots, 1 ISC slot, 1 SM slots, 4 GB Flash Memory default, 4 GB DRAM default loaded with 8 port Multi-flex Trunk Voice/Clear- channel Data T1/E1 Module. Dual power supply support(230V AC/48V DC). Make-Cisco ISR 4331 with NIM-8MFT-T1/E1 module or similar. As per technical specification attached as Annexure-1. Inspection - RITES. | — | — | — | 15,72,960 | |
| — | 49.00 | — | — | ||
| Supply of Wireless Portable Router for internet connectivity with Integrated SIMcard slot High-speed 4G LTE/VoLTEconnections with downlink speed up to150 Mbps and uplink speeds up to 50Mbps, Wi-Fi speeds up to 300 Mbps FastEthernet WAN port, and four Fast Ethernet LAN ports. Make- D link or similar. Inspection- Consignee. | — | — | — | 1,19,133.21 | |
| — | 49.00 | — | — | ||
| Supply and installation of with one Sim Card with one-year internet subscription. Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 2,31,222.18 | |
| — | 58.00 | — | — | ||
| Supply and Installation of surface Wall mountable type 19 inch 6U network Rack with front glass door with lock and rack fixing multipoint AC Power trip & all accessories.As per technical specification attached as Annexure-1. Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 2,16,363.78 | |
| — | 3000.00 | — | — | ||
| Supply of RJ-45 connector. Make - Dlink or similar. As per technical specification attached as Annexure-1. Inspection- Consignee. | — | — | — | 14,100 | |
| — | 49.00 | — | — | ||
| Supply of Single Mode 10/100/1000 media convertor with latest Technology , Make - Syrotech, D-link, Techroute or better. Inspection- Consignee. | — | — | — | 1,95,452.67 | |
| — | 500.00 | — | — | ||
| Supply of Simplex Single Mode Optical Fiber Patch Cord 9/125 Jumper Cable 5 Meters 15 ft (SC/APC - SC/APC, LC-SC/SC-SC/LC-LC/FC-LC or as per site requirement) Make- Syrotech, D-link, Techroute or better. Inspection- Consignee. | — | — | — | 61,635 | |
| — | 1800.00 | — | — | ||
| Supply of PIG Tail (10m Long) with FC/PC connector as per TEC specification no. G/OFJ-01/03 Jun'99 with latest amendments. (required accessories like 0dB etc. connector to be supplied by contractor). Inspection- RITES. | — | — | — | 10,80,000 | |
| — | 3600.00 | — | — | ||
| Supply and fixing of ISI mark PVC conduit pipe of 25mm diameter and 1.5mm thickness. Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 1,11,492 | |
| — | 3600.00 | — | — | ||
| Supply of STP CAT-6 cable.Cable should be compliant with latest EIA/TIA-568-B. 2-1 standard with fire retardant as per IEC/EN60332-1. As per technical specification attached as Annexure-1. Inspection- Consignee. | — | — | — | 46,836 | |
| — | 1800.00 | — | — | ||
| Supply of 6 Fiber armoured mono mode optical fiber cable. As per technical specification attached as Annexure-1. Inspection- Consignee. | — | — | — | 27,198 | |
| — | 3000.00 | — | — | ||
| Supply of power cable 3 Core copperx(PVC insulated flexible 3 core x 2.5 sq mm multi strand power cables should conform to specification no. IS: 694:1990 reaffirmed 1995 or latest.) Make: Delton /Finolex or better. Inspection- Consignee. | — | — | — | 1,09,710 | |
| — | 1000.00 | — | — | ||
| Fixing of GI pipe of sizes as given below for entry of cables on bridges/ culverts/drains approaches or at places as adviced by the site incharge of Railways. The GI pipe should be tightly clamped with suitable clamp as per instruction of Railway site engineer. Proper bricks channel and concreting (1:2:4) is require to be made for cases of requirment of site over GI pipe by a layer of 100 mm and extending by 60 mm. dia /80 mm dia PVC/HDPE pipe on either side minimum by 01 mtr. The rate is given for fixing of one GI pipe including supply of GI pipe, PVC/HDPE pipe and other materials required for execution. (i) 50 mm dia. Note - GI pipe 50/70 mm. dia Grade medium as per IS : 1239 Pt. 1 1979 (70 mm dia grade medium as per IS 1239 Pt. 1 1979) and flexible PVC/HDPE pipe 60/80 mm. dia with clamps, bricks and the materials for concreting and fixing the pipe are to be supplied by the contractor at site after inspection by the rep. of Railway. Execution of work as instruction of site engineer. | — | — | — | 6,06,580 | |
| Cubic Centimetr e | 20.00 | — | — | ||
| Casting,cementing & concreting with cement,sand & stone chips (12.5mm) in the ratio 1:2:4.(all materials are to be supplied by the contractor). Execution of work as instruction of site engineer. | — | — | — | 71,161.2 | |
| — | 1000.00 | — | — | ||
| Supply of DWC pipes (ISI mark) confirming to Sepc no. IS-14930,part -II of length 6 meter and 120mm outer and 103.5mm inner dia. with one snap fit coupler with rubber ring,spacer,band ,endcap one v end and one T coupler for under ground power/signal/Tlecom cable protection.Make-Rex,Duraline, or Similar. Inspection - RITES. | — | — | — | 10,39,770 | |
| — | 1000.00 | — | — | ||
| Installation of Double Wall corrugated (DWC) pipe with socket coupler.The includes (1.2 mtrs) Depth and backfilling. Execution of work as instruction of site engineer. | — | — | — | 91,300 | |
| — | 110.00 | — | — | ||
| Supply and laying of HDPE Pipe / Telecom duct (Outer dia 40 mm) as per generic requirement No. G/COS-08/01 DEC'99 or latest at a depth of 1.0 metre in all kind of soils. This includes transportation of HDPE pipe / Telecom duct to the site. Execution of work as instruction of site engineer. (Inspection - RITES) | — | — | — | 77,00,000 | |
| — | 50.00 | — | — | ||
| Supply and installation of Joint enclosure and making of straight through joints including splicing and making Pit of size 1.2 metre (depth) and 1.2 metre dia in all type of soil in the section, back filling the pit after jointing and coilling of 10 metres OFC cable (as reserve / spare). Provision of bricks walling around the sides and bottom of the pit with 1:6 plaster covering the pit with RCC slab, back filling with earth after ramming as per drawing. All the materials requires for OFC joints & pit construction will be supplied by the contractor. Execution of work as instruction of site engineer. Inspection - Consignee. | — | — | — | 6,99,330.5 | |
| — | 49.00 | — | — | ||
| Supply and Installation of fiber distribution frame 19" rack mounted as per specification no. IRS:TC:81-2000 (Part-D) or 48 fibers (24 fibers from each side) including supply of all pig tail / patch cord / FCFC adopter. Execution of work as instruction of site engineer. Inspection - RITES | — | — | — | 6,53,047.5 | |
| — | 1800.00 | — | — | ||
| Splicing /Dropping/Termination of eachFiber /Pigtail in the LIU/FDMS/Termination Joints through fusion Splicing of the termination of OFC Cables. Execution of work as instruction of site engineer. | — | — | — | 61,236 | |
| — | 500.00 | — | — | ||
| Supply and installation of RCC Route Markers including Painting As per technical specification attached as Annexure-1.Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 4,20,615 | |
| — | 2000.00 | — | — | ||
| Supply and fixing of PVC Casing and caping of 50 mm x 50 mm x I.5 mm thickness with cover on wall/Roof/Partition etc as per IS 14927 Part 1 or latest (All the miscellaneous materials required for fixing to be supplied by the contractor). Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 1,78,840 | |
| — | 96.00 | — | — | ||
| Supply and erection of 15 feet GI pipe of 4'' dia of medium quality ISI No 1230 (part 1) 1990.Having iron base plate 10mm thick 30cm x 30cm weild at the bottom of the pipe with 4 supports of iron bars of size 10mm dia. The 3 feet pipe shall be burried in the ground and 12 feet shall be above the ground. The work includes digging of pit on platform, laying of cable, erection of pole, filling the pit with 1:3:4 cement, concrete and sand. Final plastering should be done on the surface. The iron bracket on the top of the pole shall be provided for the fixing of CCTV camera and junction box/6U outdoor cabinate etc.(Necessary fixing and other materials required for fixing should be brone by the contractor). Execution of work as instruction of site engineer. Inspection- Consignee. | — | — | — | 3,06,432 | |
| — | 110000.00 | — | — | ||
| "Digging trench 1.0 Mtr deep & 0.3 Mtr wide in all kind of soil , dully clearing any roots, plants etc. The trench should be straight and parallel to track as per RE specification. . If the depth of the trench not uniform in a span of 100 Mtr of shortest length and site condition demands along the cable run, minimum depth will be taken for that particular stretch for payment. Execution of work as per site engineer | — | — | — | 55,00,000 | |
| — | 110000.00 | — | — | ||
| "Back filling of trench by shifted earth and ramming of the earth up to original ground level after the work Execution of work as per site engineer | — | — | — | 5,50,000 | |
| — | 120.00 | — | — | ||
| Laying of OFC through HDPE pipe / Telecom duct by blowing of OFC as per procedure and practise in Railway and advised by site engineer. | — | — | — | 14,40,000 | |
| — | 10000.00 | — | — | ||
| Blowing/ Drawing/ Laying of 6-F OFC/ Power Cable / CAT-6 cable in trenches / GI pipe/ through HDPE pipe on ground or on wall for connecting/ interfacing various components for system integration of CCTV surveillance system and others. This includes supply and installation of Fibre management system (wherever required), splicing, and termination of the fibres. Execution of work as instruction of site engineer. | — | — | — | 1,87,900 | |
| — | 380.00 | — | — | ||
| Cutting of platform surface (Tile/Slab) for a depth of 25cm and a width of 10cms and refilling /Reconditioning/ Concreting /Repairing the platform after laying HDPE/PVC pipe and cable. Cutting should be done with marble cutting machine in proper manner and restore the same as before in such a manner that aesthetic of the platform is not disturbed. (Laying of pipes/cables not included), Execution of work as instruction of site engineer. | — | — | — | 86,708.4 | |
| — | 100.00 | — | — | ||
| Excavation, trenching, earth work and reinstatement of track while track crossing. Execution of work as instruction of site engineer. | — | — | — | 12,033 | |
| — | 500.00 | — | — | ||
| Cable Crossing Rly. Track / Road by boring hole at a depth of 1 meter by using one no. 100 mm dia G.I pipe (medium grade) with accessories. G.I pipe with accessories will be supplied by contractor.Execution of work as instruction of site engineer. | — | — | — | 8,57,265 | |
| — | 7500.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of stores materials, preparation of site and boring of 110mm dia and placing HDPE pipe of size 63 to 40mm in single / double / triple etc required for crossing/ laying of Railway cables in a combination of quad & signalling cables etc. as per required comprising maximum 72 cores in any HDD section on land /bridges / culverts / track / pucca road crossing and blowing / pulling of Quad / Signalling cables etc. within HDPE pipe. Boring of trench shall be minimum 1(one) Mtr below the track to 1.5 (one point five) minimum 3 (three) meter below the river bed, 01 meter below other lands including road / pucca road 63 to 40 mm dia & its accessories suitable for HDT as permanently lubricated HDPE pipe of size 63 to 40mm crossing area. This includes supply as per Specification No. RDSO/SPN/TC/45 /2013 with latest amendment & cost of the fuel and all other items which will be required for laying of cable through it. Inspection : RITES for HDPE pipe (for inspection charges cost of all sort of HDPE pipe is Rs. 195/- per Mtr.) NOTE: The number of HDPE pipes (of any dia as mentioned above) to be pulled in any HDD section will depend upon the numbers of quad / signalling cables to be pulled through that HDD section as per site requirement. At a particular site, the second /additional HDD is to be done only after completing the pulling of 72 cores of cable through 1st HDD other wise the second /additional HDD will not be counted as a new / additional HDD for the purpose of billing. Only cables to be supplied by Railway. Cable sketch/route plan showing division & depth to be submitted by firm.Execution of work as instruction of site engineer. | — | — | — | 86,48,625 | |
| — | 58.00 | — | — | ||
| "Supply and Installation of basic material to construct unit maintenance free earth as per RDSO Spc.No.RDSO/SPN/ 197/ 2008 or latest, consisting the following (Inspection:Supply Portion- RDSO) (i) Copper bonded steel electrodes of 3.0 meter long & 17.0 mm dia with Cu-bondign thickness of min. 250 microns and UL listed and marked =1 no. (ii) Earth enhancement material supplied in sealed bags of min. 10 Kgs =3 nos. (iii) Cu-strip 150x25x6 mm to terminate earth rod=1 no.(iv) Cu-strip 300x25x6 mm (MEEB)=1 no.(v) Cu-strip 150x25x6 mm (SEEB)=1 no.(vi) digging the earth to the required depth(vii) Insertion of electrode(viii) Filling of earth enhancing compound (30 Kg) provision of exothermic weld connection on copper tape/bus bar of 25 mm x 6mm x 150 mm to the earth electrodes all the materials, tools and features required for the weld to be arranged by the contractor-1 no.(ix) Trenching, laying & provision of exothermic weld connecting, one to connect copper tape/35 sq mm multi strand single core PVC insulated copper cable to the copper strip/tape/ busbar welded to the earth electrode and another to the copper tape to be fixed inside the equipment/relay rack/apparatus room as per RDSO's Spec (fixtures for mounting the copper tape inside the relay room, weld materials, tool features and all other materials required for the weld shall be arranged by the (x) Exothermic weld connection, fixing of Cu- strips and routing the cables to bus bar in equipment/relay room (all other materials requird for the work shall be borne by the contractor.(xi) Construction of concrete inspection chamber as per RDSO spec.(xii) Any other material said required as per RDSO spec.NOTE:(i) Above includes interconnection of the earthing installed with the already existing earthing electrode, if any, as per site requirement and as per instruction of site incharge. (2) Any other material required as per RDSO spec. (3) All materials required for compelete installation of maintenance free earth, to be supplied by the contractor. "Execution of work as instruction of site engineer. Execution of work as instruction of site engineer. | — | — | — | 10,49,507.68 | |
| — | 58.00 | — | — | ||
| Supply and installation of Class "B" & Class "C" lightning cum surge protection device for main incoming power supply with enclosure as per RDSO spec. RDSO/SPN/165/2012 (Ver.3) or latest . Material to be produced from RDSO approved/recommended sources only.Execution of work as instruction of site engineer. Inspection- RDSO. | — | — | — | 12,99,631.52 | |
| — | 3.00 | — | — | ||
| Supply of Optical Time Domain Reflectometer (OTDR) for 1310/1550nm fiber with resolution of 60 Cms,dynamic Rangeof 314/29 dB with all accessories confirming to TEC Specification NoTEC Specification No G/OTD/02-03 March 2009.Make EXFO Model MAX 720C , AQ- 7270+735022.Make Yokogawa Electric Co Ltd Japan or better .Inspection- RITES. | — | — | — | 11,35,317.9 | |
| — | 3.00 | — | — | ||
| Supply of Single fiber fusion splicing machine similar to fujikura 80C with standard accessories :AC ADAPTER /BATTERY Charger, AC Power Cord, Spare Electrode, Carrying case, USB cable, Sleeve loader, Dispenser, Screw driver, BATTERY PACK, Battery charger cord, High precision Fiber cleaver, 3 in-1 Stripper & Protection sleeves (A demo shall be arranged along with supply) as per TEC Specification g/osm/01-03 April 2005 Model S-177A. Make - FURUKAWA ELECTRIC COJapan. Type approved or Superior. Inspection- RITES. | — | — | — | 7,91,154 | |
| — | 6.00 | — | — | ||
| Supply of electronic Cable route tracer/locator with underground cable and pipe locating receiver and cable avoidance tool thatprovide location of armoured OFC ,signalling and telecom , powercable etc. make : C Scope Stanley/3M Dynatel , model: DXL-4DBG /2273M-iD 30 or superior. Inspection- RITES. | — | — | — | 24,60,000 | |
| — | 2.00 | — | — | ||
| Supply of Handheld Digital Earth Clamp Tester for clamp on earth/ground resistance measurement up to 1000 ohms.Accuracy 0.1 - 0.99 : 1%, 1 - 49 :1.5% Also measure current leakage up to 20A. No spines required formeasurement Model - DECT-2 orequivalent / higher version make Motwane/Stanlay /Fluke/Megger. Inspection- Consignee. | — | — | — | 1,41,706.94 | |
| — | 2.00 | — | — | ||
| Supply and testing of optical Laser light source of Make- JDSU ModelOLS-35 or latest or having similar specification of reputed make. Inspection- Consignee. | — | — | — | 1,59,519.36 | |
| — | 4.00 | — | — | ||
| Supply of Wiremap Tester(Network Microscanner CableTester) for CAT-6 and CAT- 5Cable Make Fluke Modelno.MS2-100 or equivalent As per technical specification attached as Annexure-1. Inspection: Consignee. | — | — | — | 1,56,137.96 | |
| — | 5.00 | — | — | ||
| Supply of Optical Power Meter,type-B, as per TEC spec. GR/OPM-01/03 Feb. 2005 or latest. Inspection- Consignee. | — | — | — | 75,288.5 | |
| — | 4.00 | — | — | ||
| Supply of Digital multimeter for diagnosis & measuring parameter; Make:Fluke 107 or KYORITSU KEW1019R or Klein Tools MM1300. Inspection- Consignee. | — | — | — | 46,030.24 | |
| — | 2.00 | — | — | ||
| Supply of digital Psophometer as per specification are as under, Frequency Range - 15Hz to 6KHz (Weighted Mode) as specified by CCITT & 15Hz to 10KHz (Unweighted Mode); Measuring Range -90dBm to 0dBm & 30 micro V to 1V; Min. Measurable Value 10 micro V (-98dBm); Calibration Accuracy at 800Hz - 0 to -60dBm: ±0.5dB & -60 to -90dBm: ±1.0dB; 3½ Digit LCD type Display; Input Impedance - 600 ohms, 1120 ohms balanced, Recorder Facility; Power-100 micro A at 0dBm 1120 impedance, 230V AC ±10%, 47-53Hz. Optional 115V AC ±10%, 57-63Hz. Internal rechargeable 6V battery. External battery operation. Make-Aplab 1072 or better. Inspection- Consignee. | — | — | — | 1,00,299.94 | |
| — | 5.00 | — | — | ||
| CAMC of CCTV camera system installed at above LC Gates and related equipment installed at connecting station including CAMC of 1 KVA Off-Grid Solar Photovotaic (PV) Power Plant, installed for CCTV system by Railway | — | — | — | 41,36,712.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexforpenalty.pdf
ATTACHMENT
TechSpecCCTVGate_Annex-1_1.pdf
ATTACHMENT
Techspec_CCTVGate_Annex-2_1.pdf
ATTACHMENT
verificationtestingofcameras.pdf
ATTACHMENT
1AffidavitAnnexure-V.pdf
ATTACHMENT
2erformaofPoliceVerification.pdf
ATTACHMENT
3OpeningofLCAnnexure1.pdf
ATTACHMENT
4.OpeningofLCAnnexure2.pdf
ATTACHMENT
5.formoftender.pdf
ATTACHMENT
GCC2022-compressed_1.pdf
ATTACHMENT
Bidsecuritydeclarationletter.pdf
ATTACHMENT
SpecialconditionforTELECOMtender.pdf
ATTACHMENT
7CorrectionSlipNo.1ofGCC2022.pdf
ATTACHMENT
8CorrectionSlipNo.2ofGCC2022.pdf
ATTACHMENT
9correctionSlipNo.3ofGCC2022_1.pdf
ATTACHMENT
10CorrectionslipNo.4ofGCC2022.pdf
ATTACHMENT
CorrectionslipNo.5ofGCC2022.pdf
ATTACHMENT
13CorrectionSlipNo.6ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo7ofGCC2022.pdf
ATTACHMENT
14CorrectionSlipNo.11ofGCC2022.pdf
ATTACHMENT
Procedureforundertakingdiggingwork.pdf.pdf Procedure forundertaking digging
ATTACHMENT
Procedureforundertakingdiggingwork.pdf.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .