Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
17 Jun 2026, 12:00 pmDue today
Executive Engineer, MD-I, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER, MECHANICAL DIVISION-I. E-M SECTOR. KMDA, 59-NAZRUL PARK. ASHIWINI NAGAR. KOLKATA- 700159.
Lifting , repairing , reinstallation of 1 no. 132 KW ( Q- 2700 m3/Hr, H-12 Mtr, Model- WQ24MN28, Sl- BBM-10001) WPIL Make Submersible motor-set, by rewinding of the motor, replacement of spares-parts, at Dum Dum Park Drainage Pumping Station
2026_KMDA_1026382_1
KMDA/E-M/EE/MD-I/NIQ No.- 02 of 20026-27 Dated- 02.06.2026
Open Tender
MECHANICAL
21 days
South Dum Dum Municipal Area.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
9 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Disconnecting the power connection from the LT MCC cum PDB of the 132 KW motor and the removal of the duckfoot bend without causing any damage to the guide rail hoisting the the pump-motor set from the well with extreme caution with the assistance of a pump maintenance specialist equipped with the necessary tools and tackles as per the direction of EIC. | - | Job | - | - | ab4 |
| 2 | Loading-unloading and transportation charges of motor stator to and from the pump floor to workshop and back to pump house, which have already been lifted and dismantled before , as per the direction of E.I.C. | - | Job | - | - | ab10 |
| 3 | Repairing and overhauling of 1 No 132 KW LT motor after dismantling it from pump-motor assembly, stripping of the existing winding, and cleaning of slots and wedge groove , Flux-loop testing of stator core. New set coil making 90 nos. with enamel double glass covering copper ( rectangular) and insulating with class " F" insulation. New coil inserting into the slots with class " F " insulation, providing magnetic wedge for coilo locking into the slots. Connecting the winding and insulating. Heat- varnishing of stator winding with dr. beck H 71 A, Finally, dr. beck red becktol varnish priming on statorwinding for moisture proofing.Testing of 132 KW submersible pump motor set after complete re-assembly . | - | Job | - | - | ab16 |
| 4 | Replacement of Single Row Angular Contact Ball Bearing at the DE of the motor. Bearing No. 7324 BCBM. ( Make: FAG / NBC ) | - | Nos. | - | - | ab19 |
| 5 | Replacement of Single Row Angular Contact Ball Bearing at the NDE of the motor. Bearing No. NU 324 C3 / M C3. ( Make: FAG / NBC ) | - | No. | - | - | ab22 |
| 6 | Hydraulic Oil | - | Ltr. | - | - | ab25 |
| 7 | Replacement of Mechanical Seal | - | Set | - | - | ab28 |
| 8 | Replacement of Impeller lock nut | - | Nos. | - | - | ab31 |
| 9 | Terminal box with accessories | - | No. | - | - | ab34 |
| 10 | Painting Charges | - | Job | - | - | ab37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_2521623.xls
BOQ • 0.33 MB
Docs2_MD1.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid