Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance NO 51 5 AMMAN NAGAR SUNDAR NAGAR TIRUCHIRAPPALLI 620021 | TIRUCHIRAPPALLI | TAMIL NADU | 620021 | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | ₹2.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R RENGASAMY L1 | R MURUGAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clear away and carefully stacking the material useful for re-use for RCC work including all abour and other incidental charges etc complete.(PWD SOR Page no 31 SL no 35 Item no 38). | 2.83 | Cu.m | 4,610.3 ₹13,070.20 | 4,702.5 ₹13,331.59 |
| 2.00 | Dismantling, clear away and carefully stacking the material useful for re-use for RR Masonry work including all abour and other incidental charges etc complete.(PWD SOR Page no 30 SL no 16 Item no 15). | 12.82 | Cu.m | 247 ₹3,167.78 | 252.11 ₹3,233.31 |
| 3.00 | Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B | 18.72 | Cu.m | 263 ₹4,923.36 | 269.05 ₹5,036.62 |
| 4.00 | Filling in foundation and basement with sand including cost and conveyanceof sand and all labour charges for filling ,tamping ramming etc., complete. | 1.44 | Cu.m | 1,924 ₹2,770.56 | 1,962.93 ₹2,826.62 |
| 5.00 | Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., | 2.16 | Cu.m | 5,615 ₹12,128.40 | 5,728.3 ₹12,373.13 |
| 6.00 | CC 1:2:4 using 40 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc., | 7.92 | Cu.m | 6,444 ₹51,036.48 | 6,572.92 ₹52,057.53 |
| 7.00 | CC 1:2:4 using 20 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc., | 6.72 | Cu.m | 6,925 ₹46,536 | 7,063.6 ₹47,467.39 |
| 8.00 | Rcc 1:1.5:3 using 20 mm ISS metal including cost and conveyance of material to site and all labour charges are mixing and laying concrete (excluding steel, centering charges) etc., complete. | 2.52 | Cu.m | 9,256 ₹23,325.12 | 9,441.9 ₹23,793.59 |
| 9.00 | Supply and fabrication of steel for RCC works including cost and conveyance of material to site and all labour charges etc., complete. | 0.35 | MT | 91,969 ₹32,189.15 | 93,809.3 ₹32,833.26 |
| 10.00 | Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete | 10.39 | Sqm | 1,095 ₹11,377.05 | 1,116.9 ₹11,604.59 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
19 Feb 2026, 4:00 pmClosed
The Blockdevelopment Officer
The Blockdevelopment Officer PU Thottiyam
Construction of Drainage with RCC Slab Culvert at Kattuputhur- M.Kalathur Road in Seethapatti Panchayat
2026_RDTN_655624_3
A2/3449/2026
Open Tender
Civil Works - Bridges
90 days
PU Thottiyam
Work Experience
5 documents required · 5 mandatory
₹0
₹3,000
Yes
23 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Dismantling, clear away and carefully stacking the material useful for re-use for RCC work including all abour and other incidental charges etc complete.(PWD SOR Page no 31 SL no 35 Item no 38).
Dismantling, clear away and carefully stacking the material useful for re-use for RR Masonry work including all abour and other incidental charges etc complete.(PWD SOR Page no 30 SL no 16 Item no 15).
Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B
Filling in foundation and basement with sand including cost and conveyanceof sand and all labour charges for filling ,tamping ramming etc., complete.
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
CC 1:2:4 using 40 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc.,
CC 1:2:4 using 20 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc.,
Rcc 1:1.5:3 using 20 mm ISS metal including cost and conveyance of material to site and all labour charges are mixing and laying concrete (excluding steel, centering charges) etc., complete.
Supply and fabrication of steel for RCC works including cost and conveyance of material to site and all labour charges etc., complete.
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
PriceBid3.pdf
Additional Documents • 0.41 MB
TechBid3.pdf
Tender Documents • 0.54 MB
BOQ_786269.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid