Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance VILLAGE GAWALTH P O KUINAL TEHSIL KOTKHAI DISTT SHIMLA H P | KOTKHAI | SHIMLA | HIMACHAL PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.5 L+₹1.4 L (62.3%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.8 L+₹1.6 L (75.5%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.4 L+₹2.2 L (101.6%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.1 L+₹2.9 L (133.8%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | PARMINDER KUMAR L3 | SATISH KUMAR L5 | Vinod L1 | Amrit Pal Singh L4 | Jeet Kumar L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick Work, jumper work, blasting hard or softs rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water within all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15Cm (fifteen Centimetres) layer when required into plinths, sides of foundation consolidating each depossited layer by ramming and watering and then disposing of all surplus excavated earth complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. | 41.59 | Cum | 500 ₹20,795 | 700 ₹29,113 | 150 ₹6,238.5 Lowest | 460 ₹19,131.4 | 490 ₹20,379.1 |
| 2.00 | Providing and laying cement concrete 1:3:6 (1cement:3 sand:6 graded stone aggregate 40mm nominal size) curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts as per the direction and to be entire satisfaction of Engineer-In-Charge. | 1.35 | Cum | 7,500 ₹10,125 | 7,000 ₹9,450 | 4,800 ₹6,480 Lowest | 6,800 ₹9,180 | 7,000 ₹9,450 |
| 3.00Providing and Laying cement concrete 1:1½:3 (1 Cement:1½ Sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | ||||||||
| 3.10 | Foundation, footings, bases of columns etc and mass concrete complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. | 2.7 | Cum | 12,000 ₹32,400 | 8,500 ₹22,950 | 8,100 ₹21,870 | 8,000 ₹21,600 Lowest | 11,000 ₹29,700 |
| 3.20 | In walls any thickness (but not less than 0.10mm thickness) including attached buttersses pillaster plinth and string courses etc. from top of foundation level upto floor two level complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. | 6.79 | Cum | 10,000 ₹67,900 | 9,000 ₹61,110 | 8,100 ₹54,999 Lowest | 8,500 ₹57,715 | 9,500 ₹64,505 |
| 4.00 | In suspended floor roofs, landings, shelves and their supports, balconies, beams, girders, bressumers, and cantilevers up to the floor two level, including the carriage of material, complete in all respects, including all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge | 1.4 | Cum | 9,500 ₹13,300 | 9,200 ₹12,880 | 8,100 ₹11,340 Lowest | 9,000 ₹12,600 | 9,000 ₹12,600 |
| 4.10 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x 5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in:- | 9 | Cum | 600 ₹5,400 | 400 ₹3,600 | 170 ₹1,530 Lowest | 340 ₹3,060 | 500 ₹4,500 |
| 5.00 | Flat surfaces such as soffits and suspended floors, roofs landing and the like floors etc upto 200mm in thickness complete in all respect as per the direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 66.84 | Cum | 500 ₹33,420 | 450 ₹30,078 | 170 ₹11,362.8 Lowest | 380 ₹25,399.2 | 450 ₹30,078 |
| 5.10 | Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect as per the direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 599.66 | Cum | 120 ₹71,959.2 | 440 ₹2,63,850.4 | 86 ₹51,570.76 Lowest | 370 ₹2,21,874.2 | 110 ₹65,962.6 |
| 5.20 | Providing and laying of Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. | 0.82 | Cum | 120 ₹98.4 | 100 ₹82 | 200 ₹164 | 80 ₹65.6 Lowest | 110 ₹90.2 |
Tender Value
Refer Docs
EMD Value
₹4,460
Closing Date
5 Mar 2026, 11:00 amClosed
EE
JSD DHARMSHALA
Construction of Septic Tank and Soak Pit for Rest House
2026_HPIPH_129397_1
NO. EE-JSD-EA-I-2026-16942-17041
Open Tender
Civil Works
Item Rate
120 days
dsala
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,460
9 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
5 Mar 2026
26 Feb 2026
23 Feb 2026 - 26 Feb 2026
Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick Work, jumper work, blasting hard or softs rock by chiselling where the blasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water within all heights, stacking the excavated soil within all leads clear from the edge of excavation and then returning the stacked soil in 15Cm (fifteen Centimetres) layer when required into plinths, sides of foundation consolidating each depossited layer by ramming and watering and then disposing of all surplus excavated earth complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge.
Providing and laying cement concrete 1:3:6 (1cement:3 sand:6 graded stone aggregate 40mm nominal size) curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts as per the direction and to be entire satisfaction of Engineer-In-Charge.
Providing and Laying cement concrete 1:1½:3 (1 Cement:1½ Sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :-
Foundation, footings, bases of columns etc and mass concrete complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge.
In walls any thickness (but not less than 0.10mm thickness) including attached buttersses pillaster plinth and string courses etc. from top of foundation level upto floor two level complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge.
In suspended floor roofs, landings, shelves and their supports, balconies, beams, girders, bressumers, and cantilevers up to the floor two level, including the carriage of material, complete in all respects, including all leads and lifts, as per the directions and to the entire satisfaction of the Engineer-in-charge
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x 5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in:-
Flat surfaces such as soffits and suspended floors, roofs landing and the like floors etc upto 200mm in thickness complete in all respect as per the direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect as per the direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and laying of Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge.
Brick work using common burnt clay building bricks in foundation and plinth in CM 1:4 ( 1 Cement : 4 Sand) ic carriage of material (2nd Class Bricks) complete in all respect with in all lead and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing and placing Brick bats of 2nd class in soak pit complete in all respect with in all lead and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing & fixing Cast Iron manhole cover 450 x450 mm dia with frame (Medium Duty) total weight of fram and cover not less than 58 Kgs. complete in all respect including all leads and lifts as per the direction and to the entire satisfaction of Engineer-In-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_191296.xls
BOQ • 0.28 MB
terms.pdf
Tender Documents • 0.19 MB
form68.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .