| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 CrAccepted-AOC AT BARAL LANE BADAMBADI PO ARUNODAYA MARKET DIST CUTTACK PIN 753012 | CUTTACK | CUTTACK | ODISHA | 753012 | L1 | Accepted-AOC 1st lowest responsive Bidder | |
| 2 | L2₹12.6 Cr+₹69.9 L (5.88%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹13.3 Cr+₹1.4 Cr (11.8%)Rejected-Finance VIP LANE PO BLOCK KOKSARA DIST KALAHANDI ODISHA PIN 766019 | KOKSARA | KALAHANDI | ODISHA | 766019 | L3 | Rejected-Finance 3rd lowest bidder | |
| 4 | L4₹14.0 Cr+₹2.1 Cr (17.5%)Rejected-Finance | L4 | Rejected-Finance 4th lowest bidder | |
| 5 | L5₹14.9 Cr+₹3.0 Cr (25.3%)Rejected-AOC AT LADUGAON PS KOKSARA DIST KALAHANDI PIN 766019 ODISHA | LADUGAON | KALAHANDI | ODISHA | 766019 | L5 | Rejected-AOC rejected |
Tender Value
₹14.0 Cr
EMD Value
₹14.0 L
Closing Date
14 Aug 2025, 5:00 pmClosed
CE AND BM MB BURLA
Office of the Chief Engineer and Basin Manager Mahanadi Basin Burla At Burla Dist Sambalpur Pin 768017 Odisha
Renovation of Canal System of Hirakud Dam Project of Bheden Canal Section Bargarh Irrigation Division Bargarh
2025_CEBBU_115979_1
CE AND BM MB 07-2025-2026(Online)
Open Tender
Civil Works - Canal
Percentage
730 days
At-Saharatikra Block-Bheden Dist-Bargarh
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹14.0 L
Yes
16 Feb 2026
24 Jul 2025
16 Aug 2025
24 Jul 2025
14 Aug 2025
24 Jul 2025
24 Jul 2025 - 14 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area with all leads, lifts, sundries, T&P required for the work etc. complete as per the direction of Engineer-in-charge. | 81,768.4 | Sqm | 2.8 | ₹2,28,951.52 |
| 2 | Dismantling and removing R.C.C. columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge. | 39.73 | Cum | 1,697 | ₹67,413.33 |
| 3 | Dismantalling and removing cement concrete including stacking, the useful materials for reuse and removing debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge. | 488.3 | Cum | 858.6 | ₹4,19,252.66 |
| 4 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge. | 13.69 | Cum | 1,611.7 | ₹22,059.34 |
| 5 | Earthwork in Oridinary soil within initial lead of 50M. and initial lift of 1.5M. Including rough dressing, levelling the bed and depositing the excavated earth away from worksite etc. complete as per specification and direction of the Engineer-in-charge. | 380.66 | Cum | 171.7 | ₹65,359.32 |
| 6 | Earthwork excavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge. | 18,801.77 | Cum | 276.9 | ₹52,06,210.94 |
| 7 | Filling in foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 3,606.76 | Cum | 647.8 | ₹23,36,461.72 |
| 8 | Cement concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the Direction of the Engineer in charge. | 2,893.26 | Cum | 5,556 | ₹1,60,74,924.78 |
| 9 | Cement concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 9,852.41 | Cum | 6,360.1 | ₹6,26,62,331.92 |
| 10 | RCC M-25 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 407.34 | Cum | 6,748.1 | ₹27,48,798.05 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_547086.xls
BOQ • 0.33 MB
176552889.pdf
Tender Documents • 1.70 MB
176552891.html
Tender Documents • 0.05 MB
DTCN.pdf
Tender Documents • 7.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .