| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.9 L+₹99,230 (11.1%)Rejected-AOC NULL | 2 | Rejected-AOC L2 | |
| 3 | 3₹10.4 L+₹1.5 L (16.5%)Rejected-AOC | 3 | Rejected-AOC L3 |
Tender Value
₹13.5 L
EMD Value
₹33,653
Closing Date
25 Feb 2023, 6:00 pmClosed
Executive Engineer
Executive Engineer, Irrigation Division, Malappuram
GENERAL Construction of Lock cum Bridge across Newcut canal at ch 352.709 of west coast canal in Parappanangadi municipality in Malappuram district Investigation Work 1
2023_Irrig_559014_1
IRR/IA/TR/5501/2022_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
New cut at Parappanangadi Municipality
please refer SBD
10 documents required · 10 mandatory
₹2,760
₹33,653
26 Apr 2023
16 Feb 2023
1 Mar 2023
16 Feb 2023
25 Feb 2023
16 Feb 2023
16 Feb 2023 - 25 Feb 2023
Amount
Appendix-A Soil exploration
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.15.a:Hydraulic Velocity Calculation - River.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
Appendix-B Total station survey and Demarcation of boundary
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.14.a:Cross sectional details - River.
60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
OD16679/2022-2023:Engaging chain men to assist surveyors (engaging 2surveyor and 4 chain men and its out turn is 3km per 10 days) including all charges etc. complete. (Daily engaging 2 surveyors. hence needed 4 chain men per day.)
OD24933/2022-2023:Supplying and erecting Precast RCC 1:2:4 post of size 0.30x0.30x0.75 m on boundary of department land @ 50 meter interval embedded 0.25m in to CC 1:4:8 foundation of size 0.60x0.60x0.50 m including all cost of materials, labour charges etc complete as per the direction of departmental officers at site.
G S Infrastructure
Esteem Developers (P) Limited
Bidder Name
Esteem Developers (P) Limited
G S Infrastructure
MUHAMMAD NIYAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_822720.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .