Loading
Loading…
Loading…
Tender Value
₹16.4 L
EMD Value
₹32,820
Closing Date
6 Jul 2026, 4:00 pm
EE Mahore
Mahore
BOQ
2026_PWDJK_312454_3
ENIT NO 11
Open Tender
Civil Works
90 days
Mahore
NIT
2 documents required · 2 mandatory
₹600
Yes
eepwd
₹32,820
15 Jun 2026
15 Jun 2026
7 Jul 2026
15 Jun 2026
6 Jul 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25m from cutting edge. all kinds of soil | 189.5 | Cum | 576.45 | ₹1,09,237.28 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: (a)1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
. | 20.93 | Cum | 4,826.5 | ₹1,01,018.65 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 165 | Cum | 5,733.6 | ₹9,46,044 |
| 4 | Dry Random Rubble Masonary with Hard Stone in foundation and Plinth without bond stone. | 41 | Cum | 2,793.8 | ₹1,14,545.8 |
| 5 | Dumping of stone on horizontal on level including supply of stone | 30 | Cum | 937.9 | ₹28,137 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations and plinth | 253.6 | sqm | 628.95 | ₹1,59,501.72 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspeded Floor | 12 | sqm | 803.75 | ₹9,645 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 150 | Kg | 123.2 | ₹18,480 |
| 9 | Carriage of material with in avg. Lead from source to site of work Sand 15 Km by MT | 74.09 | cum | 344.49 | ₹25,523.26 |
| 10 | Carriage of material with in avg. Lead from source to site of work Agg Below 40mm 50Km by MT | 148.19 | cum | 741.14 | ₹1,09,829.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_1011470.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid