Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
3 Aug 2026, 5:00 pm
SE (CIVIL) RRVPN KOTA
SE (CIVIL) RRVPN KOTA
CONSTRUCTION OF CONTROL ROOM BUILDING WITH DEVELOPMENT WORK, PARKING, STORE SHED, GUARD HUT, BOUNDARY WALL, FENCING WORK, WATER SUPPLY SYSTEM, WATER HARVESTING SYSTEM AT 132 KV GSS SOP (TONK)
2026_RRVPN_575210_5
SE (CIVIL) RRVPN KOTA NITNO12-2026-27
Open Tender
Civil Works
Percentage
300 days
TONK
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
5900 ACCOUNT OFFICER (T AND C) RRVPN SWM
₹5.0 L
Yes
15 Jul 2026
15 Jul 2026
4 Aug 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock (B-1.9.1) | 1,916 | P.Cum | 268 | ₹5,13,488 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (B-3.1.6) | 302 | P.Cum | 3,302 | ₹9,97,204 |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand)(B-6.1.6) | 504 | P.Cum | 2,838 | ₹14,30,352 |
| 4 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth Cement mortar 1 : 6 (1 cement : 6 coarse sand)(B-5.1.2) | - | P.Cum | 4,263 | - |
| 5 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) (B-5.2.2) | 347 | P.Cum | 4,990 | ₹17,31,530 |
| 6 | "Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand)Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storey Upto 45 cm length and two corners are free
(B-5.15.02+5.3.2)" | 35 | P.cum | 4,995 | ₹1,74,825 |
| 7 | Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :(B-3.8) | 227 | P.Sqm | 367 | ₹83,309 |
| 8 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of waterproof compound complete as per specification : 50 mm thick B-/ 3.7.1 | 28 | P.Sqm | 391 | ₹10,948 |
| 9 | Half brick masonry in foundation & plinth using bricks of designation 75 Cement mortar 1 : 6 (1 cement : 6 coarse sand) (B-/5.7.3) | 58 | P.Sqm | 470 | ₹27,260 |
| 10 | Add extra providing and placing in position 2 Nos. ,6mm Ø M.S. bar at every third course of half brick masonry .B-/5.9 | 610 | P.Sqm | 64 | ₹39,040 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
Tendernotice_2.pdf
PDF • 32.29 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 0.08 MB
Tendernotice_5.pdf
PDF • 0.21 MB
Tendernotice_6.pdf
PDF • 0.11 MB
BOQ_1022972.xls
BOQ • 0.54 MB
6BIDDOCUMENTS.pdf
Tender Documents • 17.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].