| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 CrAccepted-AOC E 60 INDUSTRIAL AREA HARIDWAR 249401 | HARIDWAR | HARIDWAR | UTTARAKHAND | 249401 | ₹4.9 Cr | 1 | Accepted-AOC Qualified in Financial Bid |
| 2 | 2₹5.1 Cr+₹23.3 L (4.76%)Rejected-AOC 7 CANAL VIEW GIANI ZAIL SINGH NAGAR RUPNAGAR PUNJAB 140001 INDIA | RUPNAGAR | PUNJAB | 140001 | ₹5.1 Cr+₹23.3 L (4.76%) | 2 | Rejected-AOC Qualified in Financial Bid |
| 3 | 3₹5.7 Cr+₹78.9 L (16.1%)Rejected-AOC 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹5.7 Cr+₹78.9 L (16.1%) | 3 | Rejected-AOC Qualified in Financial Bid |
| 4 | Not Admitted-Fee/PreQual/Technical S 6 B S ROAD INDUSTRIAL AREA GHAZIABAD UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
16 Dec 2022, 6:00 pmClosed
Executive_Engineer_Maint._CPS
Executive Engineer Maint. CPS Vidhyut Bhawan Dakpathar
Capital Maintenance Work of Turbine Generator and Associated Equipments of Unit 3 of Chibro Power Station
2022_UJVN_51707_1
E-CH MAINT 24 2022-23
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
120 days
Dakpathar
Please refer to the Tender Document
2 documents required · 2 mandatory
₹23,600
DGM_HGC_Dakpathar
₹10.8 L
6 Apr 2023
17 Nov 2022
19 Dec 2022
17 Nov 2022
16 Dec 2022
21 Nov 2022
Supply Part A
Stainless steel Top cover liner plate and Pivot Ring Liner Plate as per Annexure M-1
S.S. Labyrinth (Top & Bottom) as per Annexure M-II
8” Rising Stem Gate Valve clas 150. As per Annexure M-III
8” Rising Stem Gate Valve clas 300 with electric actuator oprated K600F14A WD 10000 make rotark. As per Annexure M-III
8” Rising Stem Gate Valve clas 300. As per Annexure M-III
10”Gate valve . As per Annexure M-III
12” Clas 300 Gate Valve for Bypass Guard valve. As per Annexure M-III
Eccentric Connecting Pin of GV lever as per Annexure M-IV
Centric Connecting Pin of Regulating ring as per Annexure M-IV
Coupling bolt with nut(Runner-turbine) as per Annexure M-V
Coupling bolt with nut(Turbine Shaft And Rotor Shaft ) as per Annexure M-V
Ultrasonic flow meter DN50 Annexure M-VI
MS Seamless Pipe 2" Thickness 3.91 mm, Sch 40 Annexure M-VI
2" Gate valve Annexure M-VI
Connecting Bend Pipe of TGB Pads (As per Sample) Annexure M-VI
MS Seamless bend 2" , Sch 40 Annexure M-VI
Flange For 2” Pipe 4 hole ASA 150 Annexure M-VI
Copper Tube 3/8", 16 SWG ,15 Mtr Roll Annexure M-VII
Shaft gland sealing segment .As per Annexure M-VIII
Complete shaft Gland Assembly plate as per exising Machine sample. As per Annexure M-VIII
Rubber Consumables, Annexure M-X
Acryle Nitrile base reinforced rubber seal. for MIV of 60 MW Machine of Chibro power station as per Drg. No.HGD/T-110 (14.5 Mtrs. Long)
Synthetic rubber isolating gland seal OD: 853.0 mm, ID: 755.0 mm for shaft gland (As per drawing enclosed)
Rubber Ball dia 200 mm for air realease valve 6'' of MIV.(Maximum approx Weight 2.40 Kg )
Rubber Flapper seat for air release valve 6" ,OD 300 mm, Ball seat dia: 150 mm, ID 100 mm,
Chevron rubber packing setConsisting of 6 No. Intermediate and 1 No. Outer ring for Lever side of MIV as per following dimension and enclosed Drg. No: C350109, ID – 660.4 mm, OD – 698.5 mm
Chevron rubber packing set Consisting of 6 No. Intermediate and 1 No. Outer ring for Non Lever side of MIV as per following dimension and enclosed Drg. No: C350109, ID – 647.7 mm, OD – 685.8 mm
Packing for MIV Servo Motor Piston Rod, OD: 247.65 mm, ID: 215.9 mm, Thickness of complete set: 50.8 mm (As per drawing enclosed)
Nitrile Nylon Threaded Rubber Cup Seal, Size-150 X 120 X 15 mm of 4" ball revovling Flange of MIV.
Packing for GV Servo Motor Piston Rod, OD: 209.55 mm, ID: 177.80 mm, Thickness of complete set: 60.3 mm (As per drawing enclosed)
SS Shaft Shaft Sleeve,Annexure M-XI
Temperature Sensing Device Annexure M-XII
Strainer Parts Annexure M-XIII
Greasing System pipe line spare Annexure M-XIV.
10” NB M S Seamless Pipe LineSCH 60 AAnnexure M-XV
10” NB CLASS 300 steel flange Annexure M-XV
1.1/8"MM” X 5” Long hexa head Bolts Annexure M-XV
1.1/8"hexa Nut Annexure M-XV
7/8” BSF 76 mm Long SS STUD Annexure M-XV
7/8” Brass nut Annexure M-XV
7/8” BSF 4” LONG SOCKET HEAD CAP BOLT Annexure M-XV
7/8” SPRING WASHER Annexure M-XV
1.1/4” BSFX4” LONG HEX HEAD BOLT Annexure M-XV
Gr. 8 Hex Head Bolts1"BSFx6" long fastner Annexure M-XV
(7/8"x/4" long) Hex head cap bolt Annexure M-XV
(1.1/4"x6" long) Hex head cap bolt Annexure M-XV
1" Hexagonal Nut Annexure M-XV
7/8" Hexagonal Nut Annexure M-XV
Hexagonal Nut1.1/4" Annexure M-XV
Generator rotor pole key Annexure -I
Wedges & insulation blocks Annexure -II
RTD,TSD and Temperature scanner etc. as per annexure Annexure -III
Brake pad set Annexure -IV
Carbon Brush Annexure -V
Carbon Brush Holder Annexure- VI
Air Filter assebmly for Brake & Jack System U#3 Annexure -VII
Cup seal & O ring Of Brake & Jack System Unit #3 Annexure -VII
Rotor Coupling Bolt Annexure-IX
Slipring copper multistand Cable 120 sqmm Annexure -X
Seamless Pipe size NB-125, Sch40, Class #150. Annexure -XI
Seamless Pipe size NB-200, Sch40, Class #150. Annexure -XI
M.S Flange NB-125,Sch-40,Class#150 Annexure -XI
M.S Flange NB-200,Sch-40,Class#150 Annexure -XI
Seamless long bend NB-200,Sch-40, Class #150. Annexure -XI
Hex Head bolt & Nut M20x85 mm grade H8.8 Annexure -XI
Packers of different size, Annexure -XII
Supply material for brake and jack system, Annexure -XIII
Supply of different size of fasteners, Annexure -XIV
Spiral casing air release valve, Annexure M-XVI
Hex Head brass bolt size 1" BSF X76 mm Long, Annexure M-XVII
Generator , Generator Transformer,Unit Auxiliary Transformer, Protection panel with numerical relay (Identical to ABB make REG 670 relay) based protection panel of one Unit at 4X60 MW Chibro Power Station, Annexure -T-1
Work Part B
Dismantling of Unit
Turbine and auxillaries
Repair & overhauling of Draft Tube and Spiral Casing Annexure M-1
Overhauling of TGB assembly & its cooling Pipe line Annexure M-2
Overhauling of Guide Vane Annexure M-3
Overhauling of Top cover, pivot ring & Turbine shaft flanges Annexure M-4
Rebabbiting of 01 Set (08 Nos )of TGB Pads Annexure M-5
Fixing of Runner Cone Annexure M-6
Overhauling of Greasing System Annexure M-7
Repairing and Overhauling of Draft Tube Air Release valve(10”) and Gate valve 8” class150 Annexure M-8
Overhauling of HMC cabinet of G-40 Governor Annexure M-9
Overhauling of Guide Vane Servomotor assembly and regulating ring Annexure M-10
Overhauling of Overspeed protection ( Mechanical ) device Annexure M-11
Replacement of Cooling Valves 8" Annexure M-12
Overhauling of Cooling line Strainer Annexure M-13
Replacement of of MIV Bypass Valve and bypass Guard Valve Annexure M-14
Replacement of 10" Penstock Drain Valve (Gate Valve)&Pipe Annexure M-15
Overhauling of DT Drain Valve Annexure M-16
Overhauling of Oil Pressure Unit (GOP pump and Sump) Annexure M-17
Repairing and overhauling of Penstock and Spiral casing Pressure gauge line and valves Annexure M-18
Replacemnt of different Rubber seals of MIV Annexure M-19
Overhauling and calibration of Safety Valve Annexure M-20
Overhauling of Spiral casing Drain Valve & Pipe Line Annexure M-21
Replacement of 6” Spiral Casing Air release Valve Annexure M-22
Generator and Auxilaries
Re-tubing of Generator Guide bearing oil coolers ( 06 N0s.)Complete in all aspect Annexure -G1
G2 Overhauling of Thrust and generator guide bearing complete in all aspect Annexure -G2
Rebabbitting of Guide pad Annexure -G2
Rebabbitting of Thrust pad Annexure -G2
Re-tubing of Stator air coolers (07 Nos.) complete in all aspect. Annexure -G3
Reconditioning 24 nos. Of rotor poles, complete in all aspect. Annexure -G4
Overhauling of Generator Stator complete in all aspect. Annexure -G5
Overhauling of braking and jacking system complete in all aspect. Annexure -G6
Overhauling of Slip Ring and Rocker Assembly complete in all aspect. Annexure -G7
Repair and polishing of Mirror disc and thrust collar assemblycomplete in all aspect. Annexure -G8
Levelling, Alignment and dynamic balancing of Machine complete in all aspect.
Replacement of stator air cooling water pipe line complete in all aspect. Annexure -G10
Insulation of Cooling water pipeline of Stator air cooler and bearing air cooler pipeline complete in all aspect Annexure -G11
Refurbishment of Vapour seal assembly complete in all aspect Annexure -G12
Replacement of Electro-mechanical relay based Generator , Generator Transformer,Unit Auxiliary Transformer, Protection panel with numerical relay (Identical to ABB make REG 670 relay) based protection panel of one Unit at 4X60 MW Chibro Power Station Annexure -T-2
Miscellanous Work
Assembly & Commissioning of machine
Shivalik Hydro Pvt.Ltd.
Multitech Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .