Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹3.1 L+₹12,916 (4.29%)Rejected-AOC | L2 | Rejected-AOC l2 |
Tender Value
₹2.9 L
EMD Value
₹7,176
Closing Date
28 Jan 2025, 6:00 pmClosed
AJITH ANTO P
O/o Office of the Assistant Executive Engineer, Electrical Irrigation Sub Division Chalakudy
GENERAL-AMC 2024 - 25 Ramanchadi and Kattuppaara LIS- Malappuram Dt-Fully Comprehensive Annual Maintenance contract General Electrical Work
2025_Irrig_722571_25
C-ETN-JAN/EL/24-25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹635
₹7,176
22 Apr 2025
20 Jan 2025
30 Jan 2025
20 Jan 2025
28 Jan 2025
20 Jan 2025
Amount
RAMANCHADI LIS
OD207291/2024-2025:Dismantling the above 110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD135285/2024-2025:Dismantling the above 110 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD134866/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD134867/2024-2025:Lowering down and erecting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207292/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207295/2024-2025: Fully Comprehensive Annual Maintenance contract of above110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD207294/2024-2025: Fully Comprehensive Annual Maintenance contract of above110 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD135299/2024-2025: Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD169845/2024-2025:Replacing old bearing and supply new bearing bearing no 6316 SKF/FAG OR equivalent
OD169846/2024-2025:Replacing old bearing and supply new bearing bearing no 6315 SKF/FAG OR equivalent
OD169847/2024-2025:Replacing old bearing and supply new bearing bearing no 6309SKF/FAG OR equivalent
14.7:Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc including form work etc as required.
KATTUPPARA LIS
OD207336/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD135329/2024-2025:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD135332/2024-2025: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD135333/2024-2025:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD207428/2024-2025:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD207429/2024-2025: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD135343/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD135344/2024-2025:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD169865/2024-2025:Replacing old bearing and supply new bearing bearing no 6311SKF/FAG OR equivalent
AJITHKUMAR S. (BID ID -2079397)
Bidder Name
AJITHKUMAR S.
SAJEESH P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1159185.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .