Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹67.3 LAccepted-AOC COLLEGE CHOWMUHANI JIRANIA WEST TRIPURA | 1 | Accepted-AOC quoted lowest amount | |
| 2 | 2₹67.7 L+₹37,002.44 (0.55%)Rejected-Finance DHALESWAR JAIL ASHRAM ROAD AGARTALA TRIPURA W | DHALAI | TRIPURA | 799204 | 2 | Rejected-Finance Quoted second highest amount and stands as L2 | |
| 3 | 3₹71.5 L+₹4.1 L (6.12%)Rejected-Finance | 3 | Rejected-Finance Quoted highest amount and stands as L3 |
Tender Value
₹64.9 L
EMD Value
₹1.3 L
Closing Date
10 Aug 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM, ED-Jirania
O/o DGM, ED-Jirania
Extension of DWS works under ED-Jirania
2022_POWER_30599_1
DGM/ED/JRN/2022-23/08
Open Tender
Electrical Works
Turn-key
180 days
under ED-Jirania
As per NIT
3 documents required · 3 mandatory
₹2,000
Yes
₹1.3 L
Yes
O/o DGM, ED-Jirania
28 Sept 2022
30 Jul 2022
11 Aug 2022
30 Jul 2022
10 Aug 2022
4 Aug 2022
30 Jul 2022 - 2 Aug 2022
2 Aug 2022
Amount
Supply of 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole
Supply of Stay Set Complete
Suppl;y of Stay Wire
Supply of HT Stay Insulator
Supply of 11 KV polymeric pin insulator along with necessary fittings.
Supply of 11 KV Disc insulator
Supply of 11 KV Disc fitting
Supply, of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM.
Supply of 1 KM (Single conductor ) 8 SWG GI wire in/c hoistingand binding etc complete as required
Supply of 11 KV Craddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification
Supply, of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Break switch including necessary Connection
Supply,of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unit suitable for operation for 11 KV 50 Hz AC system including necessary Connection
Supply of 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection
Supply of MS channel cross arm of 0.3/1.2/2.2/2.8 Mtr length 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Supply of MS Angle arm of1.5/2.3/3.1 mtr length 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Supply of MS Channel cross arm of 0.8/2.8 mtr length 100X50X50X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Supply of febricated Clamp of assorted size of MS flat (50X6 mm) with double coat of red oxideprimer coat (Bkt Clamp-1390 nos and Stay clamp250 nos)
Supply of Nuts and Bolt of assorted size
Supply of straps with nuts and bolts
Supply with fitting fixing of Cutouts(set of 3 nos )on wooden plank(preferably korai wood) of size 24 "X10"X1.5" & cable connections with termination by lugs/thimbles)complete (i/c supply of wooden plank, screws and MS clamp excluding cost of Thimble)
Supply of 100 Amps Cut out
Supply of 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing.
Supply of 60 Kg Salt & 55 kg Charcoal for Earthing (For 1 pit).
Supply of 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LA from GI Pipe
Supply of 95 Sq mm Bimetalic lugs for connecting one cable with another cable or connection more than two cable
Supply of 16 sq mm PVC cable for providing new service connection to spot located under DWS Scheme
Supply of 70 sqmm PVC for loop completion in between Transformer and Cutout
Errection of 9 mtr long PCC pole direct in Earth inc Excavation ,Back filling & ramming etc as Required ( the poles should be Burried 1/6 th of their length) as per Technical Specification 9 Mtr. Long pcc pole
Erection of stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300x300x8mm, turn buckle, 7/3.15 mm dia GI standard stay wire and strain insulator etc
Erection of 11 KV polymeric pin insulator along with necessary fittings.
Erection of 11 KV polymeric disc insulator along with necessary fittings. (Excluding the cost of fittings).
Erection/Laying and stringing of conductor 6/1/2.59 mm ACSR WEASEL including laying hoisting, binding and jumpering etc. Complete as reqd. Single conductor per KM.
Erection/Laying & stringing of 1 KM (Single conductor ) 8 SWG GI wire in/c hoistingand binding etc complete as required
Erection of 11 KV Craddle Guarding by GI wire 8 SWG as per technical specification in horizontal specification
Erection & connection of triple pole ( 3 ph , 12 KV , 200 A manually Gang operated air Break switch including necessary Connection
Erection & connection of triple pole ( 3 ph , 12 KV , 200 A manually Drop out fuse unit suitable for operation for 11 KV 50 Hz AC system including necessary Connection
Erection of 11 kv SP metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV inc Necessary Connection
Erection of MS channel cross arm,0.3 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS channel cross arm, 1.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS channel cross arm, 2.2 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS channel cross arm, 2.8 mtr long 75X40X40X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS Angle of arm, 1.5 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS Angle of arm, 2.3 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS Angle of arm, 3.1 mtr long 65X65X6 mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS channel cross arm, 2.8 mtr long 100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of MS channel cross arm, 0.8 mtr long 100X50X50X6mm (Excluding the cost of bracket clamps, nuts & bolts.).
Erection of 2.5 mtr long, 40 mm dia GI Pipe (make TATA/JINDAL) for earthing.
Erection/ Laying of 8 swg GI wire at 300 mm below the ground level for earthing of Sub Station equipments and LA from GI Pipe
Installation/Positioning of 11/0.43 KV,3 ph 63 KVA of Distribution Transformer on pole with necessary connections and fitting fixing of all allied accessories components as required for making complete in all respect of energizing.
Providing 3 ph Service Connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr in length supported by GI Wire Reel Insulator i/c fitting fixing of energy meter as required
ADHIR DEBNATH
Dilip Kumar Kar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .