Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹25.0 L
EMD Value
₹75,000
Closing Date
31 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Dy. Conservator of Forests, Banaskantha - Palanpur
Construction of Entry Gate @ Jessore Wildlife, Iqbalgadh Range, Banaskantha Division
356062
Tender Notice 2026-27
Open
Civil - All
Works
Banaskantha
1 document required · 0 mandatory · 1 optional
₹1,500
Deputy Conservator of Forest, Wildlife Division, Palanpur
₹75,000
17 Oct 2026
17 Oct 2026
17 Oct 2026
31 Oct 2026
17 Oct 2026
NAME OF WORK: Construction of Entry Gate @ Jessore Wildlife, Iqbalgadh Range, Banaskantha Division
Sr. No. Item Description QTY. Unit Total Rate Amount
Excavation for foundation up to 1.50 m. depth including sorting out & stacking of
useful material & disposing off the excavated stuff up to 50.0 m. lead etc.
Filling in plinth with sand under floors including Watering , ramming, consolidating
and dressing completed
Providing and laying cement concrete 1:3:6 (1-Cement : 3- Coarse sand : 6- graded
3 stone aggregates 20 mm nominal size) and curing complete Including cost of 5.87 Cu.m. 3,638.79
formwork in (A) Foundation and Plinth-PCC
Providing and laying controlled cement concrete M.250 and curing complete
including the cost of formwork and excluding the cost of reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of columns and Mass
concrete.-Footing
Providing and laying controlled cement concrete M.250 and curing complete
including the cost of formwork and excluding the cost of reinforcement for
reinforced concrete work in (D) Columns, Pillars posts and struts, upto floor two
Providing and laying controlled cement concrete M.250 and curing complete
including the cost of formwork and excluding the cost of reinforcement for
reinforced concrete work in (C) Slabs,landing,shelves,Balconies, Lintels, Beams,
Girders and Cantilever upto floor two level.-Slab
Providing and laying controlled cement concrete M.250 and curing complete
7 including the cost of formwork and excluding the cost of reinforcement for 15.86 Cu.m. 8,051.70
reinforced concrete work in (A) Plinth Beam & Slab Beam
Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level (upto 10 ton)
Brick work using common burnt clay building bricks having crushing strength not less
9 than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6. (1- Cement : 6 - 4.41 Cu.m. 4,214.33
fine sand)(B) Conventional - Foundation
Brick work using common burnt clay building bricks having crushing strength not less
10 than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 - 32.98 Cu.m. 4,526.81
fine sand)(B) Conventional - Superstructure
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single
11 or half brick walls for interior plastering upto floor two level and finished even and 190.33 Sq.mt. 165.02
smooth in (ii) Cement mortar 1:4 (1-cement :4-sand)
P & L By Natural Stone (Rockface) Wall Cladding Tiles 15 mm thick , in skrting risers of
steps and dedo on 15 mm thick cement plaster 1:3 (1-cement : 3-coarse sand) on
12 New Surface and jointed with white cement slurry and jointed with color cement 126.34 Sq.mt. 3,297.65
slurry including finised with flush pointing & cleaning the surface etc. complete for
Providing and fixing 35 mm thick water proof flush door solid core double shutter
with 1mm thick laminated sheet on both side of the shutter having teakwood lipping
edge patti of 38 mm x 25.4 mm on all edges, including Indian teak wood frames
cm x 7 cm with Melamine Polish matching shade of laminate with Magnetic catcher
13 triple strip vertical type(2 Nos), S.S. 304 tower bolt (barrel type) 300x10 mm (2 Nos), 1.89 Sqm 2,601.00
Main door set handle 19mm dia x 150 mm SS 304 10 x 150 mm connector (2 Nos),SS
Hinges of 100mmX75mmX3.2mm (8 Nos) with necessary SS fixtures and fastenings
etc. complete all SS fittings to be of SS304 matt finish as directed by Engineer-in-
NAME OF WORK: Construction of Entry Gate @ Jessore Wildlife, Iqbalgadh Range, Banaskantha Division
Sr. No. Item Description QTY. Unit Total Rate Amount
Providing and fixing powder-coated aluminium domal section glass Window of
approved make and design, using standard aluminium sections of required size and
thickness, including vertical stiles, top and bottom rails, necessary glazing clips,
neoprene / EPDM gaskets, screws and fasteners, with 5.5 mm thick clear float glass /
14 approved type glass fixed with proper beading and sealant, complete with handles, 2.16 Sqm 5,111.61
tower bolts, floor spring, lock and other required accessories, as per drawing and
direction of the Engineer-in-Charge. The rate shall be for finished work per square
metre including cost of all materials, labour, tools, equipment, wastage, and
scaffolding, all complete.
Providing and fixing Granite Stone Jamb for door and windows of 18 to 20mm thick
and width as per wall thickness polished and cut as per required size of door/window
opeinings. Fixed to wall and lintle with adhesive and Hilti Frame anchor HRD-CR2
10x100 at 1000mm distance in vertical rames and 600mm distance in horizontal
frames. Jamb fixed to walls with Adhesive Material Kerakol Bioflex Flexible Mineral
Adhesive. as per instruction of site incharge complete
Steel work, welded in built up sections framed work including cutting, hoisting, fixing
in position and applying a priming coat of red lead paint. (A)In beams and joists,
channels angles Tees, flats, with connecting plates or angle cleats as in main and
cross beams. Hip and jack rafters, purlins conneted to common rafters and the like
Painting two coats (excluding priming coat) on new steel and other metal surface
with enamel paint, brushing, interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface of all dirt, dust and other
foreign matter.
Applying two coats of putty & two coats of primer of approved brand and
manufacture on new wall surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and other foreign matter and sand
papered smooth.
Wall painting (three coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including thoroughly
brushing the surface free from mortar droppings and other foreign matter and
sand papered smooth
Providing and fixing SLOTH BEAR , BEAR TWINS AND LEOPARD (STATUE OF
19 MAXIMUME STANDARD SIZE) ISI FRP Standard Materials including transportation and 1.00 LS 4,50,965.00
fitting charge of making necessary etc.
Providing and fixing electrical condutes, wiring and fixtures for Rest House. All
including labour and fixing material.
Add 1.50% Contigency Charge
I/am we/are willing to carry out the work at………………...% above /below………………….percent (should be written in figures and words) of the estimated
rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount put to tender * Estimated amount put to tender
Deduct : % below Rs. Add : % Above Rs.
Net Rs. Net Rs.
In words In words
{* Strike whichever is not applicable.} {* Strike whichever is not applicable.}
NAME OF WORK: Construction of Entry Gate @ Jessore Wildlife, Iqbalgadh Range, Banaskantha Division
Sr. No. Item Description QTY. Unit Total Rate Amount
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In- Charge for which no extra
payment shall be made.
Credit Amount Rs. 0.00 for dismantling of materials shall be deducted from running account bill
3 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
4 GST and Income tax TDS will be deducted at a source while making payments of bills
5 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Book Entry Gate.pdf
Schedul B Entry Gate.pdf
drawing Entry Gate.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .