Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 LAccepted-Finance | ₹47.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹50.3 L+₹3.4 L (7.18%)Accepted-Finance | ₹50.3 L+₹3.4 L (7.18%) | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical No valid performance certificate |
| Sl No | Description | Qty | Unit | JINU MATHEW KURIAN L1 | P M JACOB L2 | NIKHIL T REJI L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix A REACTIVE MAINTENANCE | ||||||
| 1.00 | OD26033/2026-2027:Providing and fixing of vinyl printed sticker over existing running contract information board non-retro-reflectorized Vinyl sign with 1 year warranty manufactured Vinyl Printed sheet including lettering symbols etc | 7.2 | sqm | 900 ₹6,480 Lowest | 1,038 ₹7,473.6 | 1,125 ₹8,100 |
| 1.00 | OD26037/2026-2027:Engaging labour with passenger not less than 1000cc for conducting and reporting routine inspection up to 20 KM per day for the entire length of project road at frequency of 7 days throughout the agreement period of running contract as directed by the departmental officers | 56.55 | Day | 1,900 ₹1,07,445 Lowest | 2,000 ₹1,13,100 | 2,097 ₹1,18,585.35 |
| 2.00APPENDIX B PRE MONSOON WORKS AND DISASTER MANAGEMENT | ||||||
| 2.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | 4 | Hectare | 48,000 ₹1,91,904 | 45,019.99 ₹1,79,989.92 Lowest | 49,995 ₹1,99,880.01 |
| 2.00 | OD26021/2026-2027:Cutting of grass and light jungle using cutter with all expense | 20 | hour | 400 ₹8,000 | 223 ₹4,460 Lowest | 239 ₹4,780 |
| 2.00 | OD26019/2026-2027:Engaging Hydraulic Excavator for clearing soil on road surface | 40 | Day | 9,000 ₹3,60,000 | 8,763 ₹3,50,520 Lowest | 9,429 ₹3,77,160 |
| 2.00 | OD26020/2026-2027:Hire and running charges of tipper | 20 | Day | 6,000 ₹1,20,000 Lowest | 6,029 ₹1,20,580 | 6,488 ₹1,29,760 |
| 2.00 | OD26023/2026-2027:Engaging woodcutter with machine for cutting of trees, including cutting of trunks, branches and removal of stumps, roots etc | 15 | Day | 3,400 ₹51,000 | 3,318 ₹49,770 Lowest | 3,570 ₹53,550 |
| 2.01 | OD26022/2026-2027:Rent fore Crane | 12 | hour | 700 ₹8,400 Lowest | 702 ₹8,424 | 756 ₹9,072 |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
14 Sept 2026, 3:00 pmClosed
Executive Engineer
O/o the Executive Engineer PWD Roads Division Kottayam
Clearing. refurbishment, engaging labour, GSB, WMM, close grade. road safety works
2026_PWD_868238_1
PWD/RB/TR/7647/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
360 days
kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
17 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
14 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A REACTIVE MAINTENANCE | |||||
| 1.001 | OD26033/2026-2027:Providing and fixing of vinyl printed sticker over existing running contract information board non-retro-reflectorized Vinyl sign with 1 year warranty manufactured Vinyl Printed sheet including lettering symbols etc | 7.2 | sqm | - | - |
| 1.002 | OD26037/2026-2027:Engaging labour with passenger not less than 1000cc for conducting and reporting routine inspection up to 20 KM per day for the entire length of project road at frequency of 7 days throughout the agreement period of running contract as directed by the departmental officers | 56.55 | Day | - | - |
| 2APPENDIX B PRE MONSOON WORKS AND DISASTER MANAGEMENT | |||||
| 2.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | 4 | Hectare | - | - |
| 2.002 | OD26021/2026-2027:Cutting of grass and light jungle using cutter with all expense | 20 | hour | - | - |
| 2.003 | OD26019/2026-2027:Engaging Hydraulic Excavator for clearing soil on road surface | 40 | Day | - | - |
| 2.004 | OD26020/2026-2027:Hire and running charges of tipper | 20 | Day | - | - |
| 2.005 | OD26023/2026-2027:Engaging woodcutter with machine for cutting of trees, including cutting of trunks, branches and removal of stumps, roots etc | 15 | Day | - | - |
| 2.006 | OD26022/2026-2027:Rent fore Crane | 12 | hour | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_1470470.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 1.64 MB
PERFORMANCECERTIFICATE.pdf
Additional Documents • 0.19 MB
MAINTENANCEOFDEFECTS.pdf
Additional Documents • 0.32 MB
Specialcondition.pdf
Additional Documents • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .