| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ARUN SUNDAR O L2 | VISWANATHAN O, BEAULA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Road | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 130 | sqm | 15.44 ₹2,007.20 | 14.7 ₹1,911 |
| 1.00 | OD177767/2025-2026:Granular sub-base/base/surface course with availabe local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing departmental local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br> (i) Using Departmentaly occuring gravel | 6.5 | cum | 204.37 ₹1,328.41 | 194.6 ₹1,264.90 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 10.22 | cum | 2,397.47 ₹24,502.14 | 2,283 ₹23,332.26 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 25.08 | cum | 3,622.42 ₹90,850.29 | 3,449.9 ₹86,523.49 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 167.2 | sqm | 84.19 ₹14,076.57 | 80 ₹13,376 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 167.2 | sqm | 19.67 ₹3,288.82 | 18.7 ₹3,126.64 |
| 1.01 | 75.5.6.A.1.2pb:Surface Dressing using Bituminous (Penetrations grade / modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. (A) By Manual Means Case - I: Nominal Chipping Size 13.2 mm II Bitumen S-65 | 20.25 | sqm | 174.77 ₹3,539.09 | 166.45 ₹3,370.61 |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 24.54 | sqm | 414.78 ₹10,178.70 | 395 ₹9,693.30 |
| 1.01 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 21.42 | sqm | 322.04 ₹6,898.10 | 306.7 ₹6,569.51 |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
24 Oct 2025, 6:00 pmClosed
AELSGD KADALUNDY
LSGD KADALUNDY
WORKS
2025_LSGD_810606_1
AE/LSGD/KDY/TENDER/6/25-26
Open Tender
Civil Works - Roads
180 days
KADALUNDY
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,593
Yes
5 Mar 2026
17 Oct 2025
27 Oct 2025
17 Oct 2025
24 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353138.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1353138.xls
BOQ • 0.24 MB
viewsbd.pdf
Tender Documents • 1.80 MB
Download all tender documents and submit your bid