Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC VILL KANGER P O BANETHI TEHSIL NAHAN DISTT SIRMOUR | NAHAN | SIRMOUR | HIMACHAL PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.1 L+₹85,127 (5.24%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹19.6 L+₹3.3 L (20.5%)Rejected-Finance GOVT ELECTRICAL CONTRACTOR C VILLAGE HAT PO BAJAURA TEHSIL BHUNTAR DISTRICT KULLU HP 175125 | KULLU | HIMACHAL PRADESH | 175125 | L3 | Rejected-Finance Reject | |
| 4 | L4₹19.9 L+₹3.7 L (22.5%)Rejected-Finance GOVT CONTRACTOR VILLAGE ROOF P O KIARKOTI TEHSIL AND DISTRICT SHIMLA HP | L4 | Rejected-Finance Reject | |
| 5 | L5₹20.2 L+₹3.9 L (24.2%)Rejected-Finance | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | vinod kumar L3 | PREM SINGH L2 | Akshay Thakur L4 | Pariksha Chauhan L5 | M/S JASVEER ASSOCIATES L6 | Dharam Singh L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in all type of soil such as pickwork jumper work Kankar, moorum, shingles including decomposed soft and hard rock etcupto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts as per the direction of Engineer in-charge. | 67.68 | Cum | 150 ₹10,152 Lowest | 300 ₹20,304 | 250 ₹16,920 | 700 ₹47,376 | 350 ₹23,688 | 200 ₹13,536 |
| 2.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. Including centring,shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4mtrs and removal of the same for insitu reinforced concrete and plain concrete work in:- | |||||||||
| 2.01 | Vertical surface such as wall of (any thickness) partition and the like including attached pillaster buttresses plinth and string courses and like and as per the direction of Engineer-in-charge .including entire carriage of material upto all leads and lifts. | 406.62 | Sqm | 150 ₹60,993 Lowest | 300 ₹1,21,986 | 1,140 ₹4,63,546.8 | 350 ₹1,42,317 | 320 ₹1,30,118.4 | 250 ₹1,01,655 |
| 4.00 | Providing and laying cement concrete 1:5:10 ( 1Cement:5sand:10grade stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of from work in retaining wall/breast walls the size of plums shall usually be 150mm to 300mm as HPPWD specification including entire carrage of material up to all leads and lifts. | 290.14 | Cum | 6,500 ₹18,85,910 | 5,400 ₹15,66,756 | 5,200 ₹15,08,728 Lowest | 6,300 ₹18,27,882 | 7,700 ₹22,34,078 | 5,200 ₹15,08,728 Lowest |
Tender Value
₹27.0 L
EMD Value
₹55,000
Closing Date
10 Jul 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Rajgarh
SH C/O PCC protection works to protect the civil works
2025_HPIPH_109243_1
1712-1787 dated 30-06-2025
Open Tender
Civil Works
Item Rate
180 days
Rajgarh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,500
₹55,000
Yes
10 Sept 2025
2 Jul 2025
10 Jul 2025
2 Jul 2025
10 Jul 2025
2 Jul 2025
Amount
Excavation in foundation and trenches in all type of soil such as pickwork jumper work Kankar, moorum, shingles including decomposed soft and hard rock etcupto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts as per the direction of Engineer in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. Including centring,shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4mtrs and removal of the same for insitu reinforced concrete and plain concrete work in:-
Vertical surface such as wall of (any thickness) partition and the like including attached pillaster buttresses plinth and string courses and like and as per the direction of Engineer-in-charge .including entire carriage of material upto all leads and lifts.
Providing and laying cement concrete 1:5:10 ( 1Cement:5sand:10grade stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of from work in retaining wall/breast walls the size of plums shall usually be 150mm to 300mm as HPPWD specification including entire carrage of material up to all leads and lifts.
PREM SINGH (BID ID -533272)
vinod kumar (BID ID -533106)
Akshay Thakur (BID ID -533386)
Pariksha Chauhan (BID ID -533190)
M/S JASVEER ASSOCIATES (BID ID -533335)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .