Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
4 Dec 2026, 3:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Engineer, TTD, Tirupati
O/o The SE-II, TTD, TIRUPATHI
Supply, erection and commissioning of LPG fired steam boilers of 600Kg/hr capacity for MTVAC and Akshaya Kitchen boiler section of VQC-II complex, Tirumala
1010049
527/SE-II/TTD/2026-27
OPEN - NCB
Others
Tirupati, Andhra Pradesh
9 documents required · 9 mandatory
₹49,000
18 Nov 2026
18 Nov 2026
18 Nov 2026
90 days
Supply, erection and commissioning of LPG fired steam boiler of make – Thermax, Model - Revomax RXA-06 of capacity 600 kg/hr (F and A 100 Deg. C), Gas train range 1-4 Bar with Design Pressure of 10.54 Kg/sqcm (g). The supply of steam boiler is including cost of Gas Train assembly, Steam Seperator, Economizer, heat optimizer, Control Panel, Supervision charges for Erection and Commissioning. The rate is including cost of Packing and Forwarding, Freight, Transit Insurance, loading and unloading, F.O.R at Tirumala, cost and conveyance to site of work and all other incidental charges etc., complete. (The rate is excluding GST).
A) SCOPE OF SUPPLY : The steam boiler consisting of - a) BOILER : 1 set i) Pressure part assembly consisting of closely wound helical vertical membrane coil fabricated out of high temperature resistant ERW tubes and flats. ii) Double jacketed air casing with an aluminum radiator to enclose the Pressure parts and serve as an integral combustion air Pre-heater.
b) AUXILARIES : 1 set i) Diffusion type, down firing burner assembly suitable for Natural GAS / LPG firing ii) Blower coupled with motor, mounted on bottom chassis, duly connected to the Jacket. iii) Water pump, with surge suppressor and relief valve, mounted on pumping module iv) Atmospheric economizer and heat optimizer to Pre-heat feed Water v) Dust protected Pre-wired control panel with necessary switch gear, power and control circuitry vi) Set of tool kit.
c) PIPING : 1 set i) Feed water line between optimizer, economizer, feed pump and boiler. ii) Flexible / Fixed connection from Gas train to burner.
d) MOUNTINGS AND FITTINGS : 1 set i) Set of isolating needle valves for indicating instruments STEAM : 1 set i) One Main steam stop valve ii) One Auxiliary steam stop valve iii) One Single port spring loaded safety valve WATER : 1 set i) One Y Strainer ii) One Drain valve for economizer iii) One Relief valve on feed water pump iv) One Non-return valve on feed water line v) One Ball valve for coil blow down
e) INSTRUMENTS, CONTROLS AND SAFETIES : 1 set One Burner programmer with matching flame detector One Set Audiovisual alarms for abnormal conditions STEAM i) One Steam pressure switch for burner ON-OFF control ii) One Steam pressure gauge iii) One Steam temperature indicator-cum-switch for high alarm WATER i) One Low water level alarm switch on economizer ii) One Blow down valve limit switch
f) LPG FIRED GAS TRAIN ASSEMBLY (HIGH PRESSURE) SCOPE of SUPPLY Consisting of isolation valve, filter, pressure regulator with slam shut valve, vent valve, pressure switch, dual shut off valves and flow control valve. NOTE: i) Suitable for min / max pressure of 1 - 4 barg at inlet of gas train ii) Dual shut off valves and flow control valve are part of burner (in case monobloc burner is supplied)
One Gas train assembly suitable for gas firing (Madas make) : - i) One Isolating ball valve DN 25 on main line - Madas ii) One Gas filter – Madas iii) Pressure gauge each at upstream and down stream of the pressure regulator with push to read valves iv) One Gas pressure regulator. - Madas v) One Slam shutoff valve – Madas vi) One Gas pressure switch vii) One Dual shutoff valve – Madas viii) Gas train Size – 25NB
B) BATTERY LIMITS : Terminal Points a) STEAM i) Main steam stop valve outlet ii) Auxiliary steam stop valve outlet iii) Steam safety valve outlet b) WATER i) Heat optimizer inlet ii) Air vent outlet on economizer iii) Economizer drain valve outlet iv) Relief valve outlet on feed water pump v) Blow down valve outlet
c) FUEL i) Gas - Outlet of safety relief valve ii) Gas - inlet of gas train d) AIR and FLUE GAS i) Suction of Blower ii) Flue GAS outlet on economizer e) ELECTRICALS i) Terminal connectors on control panel
f) Vent - Upto outlet of air vent / safety valve g) Power / signal - At the inlet of motor / instrument mounted on equipment h) Earthing - At the earhing node of each equipment i) Fuel gas - Inlet and outlet of the gas train assembly
C) CONTROLS and SAFETIES : Alarm and Interlock Schedule - Instrument \ Action a) Steam Pressure High - Pressure Switch \ Burner OFF b) Steam Temperature High - Temperature Switch \ Burner Trip c) Flame Failure - Flame Sensor \ Burner Trip d) Economizer water level low - Level Switch \ Burner Trip e) Blow down Valve open - Blow down Sensor \ Burner Trip f) Gas Pressure Low - Pressure Switch \ Burner Trip g) Gas pressure high - Pressure Switch \ Burner Trip
D) EXCLUSIONS : a) Main chimney and flue gas duct between boiler and chimney b) Raw water and soft water service tanks c) Steam, water, fuels oil and drain piping up to our terminal points d) All civil and structural work for installing the boiler e) Electrical works in boiler house up to our terminal points
f) Labour, tools and tackles, utilities (water, power, air, gas, etc.) and consumables required for assembling, erecting and commissioning the boiler g) Spares for installation, operation and maintenance of boiler h) Water treatment plant i) Fuel, water, instruments and accessories for commissioning, operation and for performance testing of boiler j) All lagging / insulation wherever required
Note : a) The contractor is to submit the all drawings and documents to the Department such as Drawings, Terminal Point, GA Drawing (General arrangement drawings), foundation details (not foundation design), electrical wiring diagram and Piping and Instrumentation Diagram, Installation / Operations and Maintenance Manual etc., b) The contractor is to submit all the tested certificates at their own cost for the steam boiler and for all components as mentioned in the scope of work.
The rates are exclusive of GST but inclusive of all other taxes.No reimbursement whatsoever will be made by TTD for taxes (EXCEPT GST) recovered by TTD from the contractor or taxes paid by the contractor.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 527.xlsx
TENDER_DOCUMENT • 0.02 MB
NIT 527.doc
TENDER_DOCUMENT • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .