Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance | ₹1.9 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹2.0 Cr+₹9 L (4.74%)Rejected-Finance | ₹2.0 Cr+₹9 L (4.74%) | L2 | Rejected-Finance Reject |
| 3 | L3₹2.2 Cr+₹27.5 L (14.5%)Rejected-Finance GROUND FLOOR PRAKASH APARTMENT BYE PASS ROAD SAPROON SOLAN SAPROON SOLAN SOLAN HIMACHAL PRADESH 173211 UDYAM HP 11 0005662 | SOLAN | HIMACHAL PRADESH | 173211 | ₹2.2 Cr+₹27.5 L (14.5%) | L3 | Rejected-Finance Reject |
Tender Value
₹1.7 Cr
EMD Value
₹2.1 L
Closing Date
30 Sept 2022, 11:00 amClosed
Er Rahul Dhiman EE
JSV Division Nagrota Bagwan
Operation and maintenance of source level Aug.various WSS in Changer area under Nagrota Bagwan constituency
2022_HPIPH_65233_1
NGB-KNG01-773
Open Tender
Civil Works - Others
Item Rate
1825 days
Nagrota Bagwan
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,500
Yes
online mode
₹2.1 L
6 Oct 2022
21 Sept 2022
30 Sept 2022
21 Sept 2022
30 Sept 2022
21 Sept 2022
Amount
Operation & maintenance of Water Supply Scheme as whole including Automated Pumping Machinery (working and Stand bye Pumping machinery), Rising Mains and Gravity mains in a length of 44.65 K.M, 3 Nos Percolation Wells, 3 Nos Pump house, 7 Nos Over head/Underground Storage Reservior, 3 Nos Chlorination system including Yard light, at various sites complete in all respect in proper working condition for a period of 5 years. O&M includes the regular i.e. daily supplying of designed/required quantity of potable water having water quality as per CPHEEO manual of water supply to the beneficiaries of the scheme upto main storage /delivery tank from above mentioned sources to Percolation Well, main & sector over head storage tanks at different locations as per plan and repair & maintenance of Main lines, Gravity lines and entire distribution system along with maintenance of automised system of scheme. Regular maintenance of all the facilities including cleaning / washing, oil and greasing repairs, replacement of worn out/damaged partiments, regular cleaning of all structure like Storage tanks, percolation wells, collection/distribution chambers, pump houses etc and disposal of same as per the direction of Engineer-in-charge, fixing/repairing leakage in civil structures, channels, pipe lines, pumping machinery etc. proper disinfection of treated water and regular testing of water samples at required stages of treatment and lift, keeping regular and proper record of water quantity and quality, time and hour of run of pumping machinery, repair and maintenance of all works,removal of all kind of slips, slush, up rooting of unwanted grass, shrubs, weeds etc. growing near the structures and keeping the area neat and clean to the entire satisfaction of Engineer-in-Charge, planting and maintaining plants/flowers/trees around the pump house , storage tanks/ percolation wells etc. as per the entire satisfaction of Engineer-in-Charge including the cost of adequate and proper tools and plants, skilled and unskilled manpower, spare parts, oil/grease/lubricants, chemicals (Except bleaching powder) instruments, equipments, stationery and any other material etc. required for O&M excluding the cost of energy charges. All the operation shall be carried out as per the CPHEEO manual on water supply and treatment (latest addition) HP PWD/JSV specification, HP & JSV departmental norms, directions issued by Engineer-in-Charge from time to time and sound Engineering practice. The chlorine gas shall be provided by the contractor itself .The firm / contaractor will be responsible for collection of water Tarrif from consumers as per the norms of HPIPH Department complete in all respect with in all leads and lifts. The operation and miaintenance of whole scheme shall be for 5 years.
1st Year of O & M
2nd Year of O & M
3rd Year of O & M
4th Year of O & M
5th Year of O & M
Pumping Mechinary :-
Submersible Pump 7.50 x 2 = 15 HP (1 working and 1 stand by)
Submersible Pump 7.50 x 2 = 15 HP (1 working and 1 stand by)
Centrifugal Pump 7.50 x 2 = 15 HP (1 working and 1 stand by)
Centrifugal Pump 225 x 3 = 675 HP (2 working and 1 stand by)
Centrifugal Pump 25 x 2 = 50 HP (1 working and 1 stand by)
Centrifugal Pump 30 x 2 = 60 HP (1 working and 1 stand by)
Labour requirement :-
Fitter = 3 Nos.
Bedar = 7 Nos.
Pump Operator = 6 Nos.
Helper = 2 Nos.
Chowkidar = 3 Nos.
Mali = 1 No.
Vijay Kumar C/O Vasudeva Electricals
Sai Aqua Machines and Builders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .