Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹138.0 CrAccepted-AOC 101 TO 104 PRABHAT CENTRE ANNEX SECTOR THANE 410614 | THANE | THANE | MAHARASHTRA | 410614 | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹183.3 Cr+₹45.3 Cr (32.8%)Rejected-AOC | 2 | Rejected-AOC 2nd Lowest | |
| 3 | 3₹206.3 Cr+₹68.3 Cr (49.5%)Rejected-AOC 1ST FLOOR B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | 3 | Rejected-AOC 3rd Lowest | |
| 4 | 4₹207.1 Cr+₹69.0 Cr (50.0%)Rejected-AOC | 4 | Rejected-AOC 4th Lowest | |
| 5 | 5₹216.7 Cr+₹78.6 Cr (57.0%)Rejected-AOC RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | 5 | Rejected-AOC 5th Lowest |
Tender Value
₹102.9 Cr
Closing Date
27 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE_South_GAP_WS_KMDA
D-Block, 1st Floor, Unnayan Bhavan, Salt Lake City, Kolkata-700091.
Pollution Abatement Works for River Ganga at North Barrackpore Municipality of I and D with STP in West Bengal, including O and M period of 15 years through Hybrid Annuity Based PPP Mode under Namami Gange Programme.
2022_KMDA_371478_1
KMDA/WS/GAP/SE/S/NIT-10/21-22
Open Tender
CIVIL AND ELECTRICAL WORKS
Item Rate
730 days
North Barrackpore Municipal Town
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
virtual meeting
15 Sept 2022
15 Mar 2022
29 Jun 2022
15 Mar 2022
27 Jun 2022
15 Mar 2022
15 Mar 2022 - 23 Mar 2022
24 Mar 2022
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 130 MLD STP at Babanpur | |||||
| 1.01 | Bid Project Cost (including all taxes) for 30 MLD STP | 1 | Each | - | - |
| 1.02 | Bid Project Cost (including all taxes) for Associated Infrastructure | 1 | Each | - | - |
| 2O&M CHARGES | |||||
| 2.01 | O&M charges for 30 MLD STP at Babanpur for first month after Babanpur COD | - | - | - | - |
| 2.02 | Manpower | 180 | INR/Month | - | - |
| 2.03 | Maintenance and Repair | 180 | INR/Month | - | - |
| 2.04 | Consumables | 180 | INR/Month | - | - |
| 2.05 | Guaranteed Energy Consumption for 30 MLD STP for the first month after Babanpur COD (Value should be entered in all cell from 2.06 to 2.17, and should be greater than 0) | - | - | - | - |
| 2.06 | For flow < 15 MLD and BOD < 130 mg/L | 1 | kWh/MLD | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_722627.xls
BOQ Document • 0.35 MB
94411788.pdf
Tender Document • 0.62 MB
Draft_CA_North_Barrackpore.pdf
Tender Document • 1.25 MB
RFP_North_Barrackpore.pdf
Tender Document • 1.02 MB
Terms_and_Conditions.pdf
Tender Document • 19.48 MB
94411790.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .