| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹138.0 CrAccepted-AOC | ₹138.0 Cr | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹183.3 CrRejected-AOC | ₹183.3 Cr | 2 | Rejected-AOC 2nd Lowest |
| 3 | 3₹206.3 CrRejected-AOC B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW UTTAR PRADESH 226010 | LUCKNOW | UTTAR PRADESH | 226010 | ₹206.3 Cr | 3 | Rejected-AOC 3rd Lowest |
| 4 | 4₹207.1 CrRejected-AOC | ₹207.1 Cr | 4 | Rejected-AOC 4th Lowest |
| 5 | 5₹216.7 CrRejected-AOC RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹216.7 Cr | 5 | Rejected-AOC 5th Lowest |
Tender Value
₹102.9 Cr
Closing Date
27 Jun 2022, 2:00 pmClosed
SE_South_GAP_WS_KMDA
D-Block, 1st Floor, Unnayan Bhavan, Salt Lake City, Kolkata-700091.
Pollution Abatement Works for River Ganga at North Barrackpore Municipality of I and D with STP in West Bengal, including O and M period of 15 years through Hybrid Annuity Based PPP Mode under Namami Gange Programme.
2022_KMDA_371478_1
KMDA/WS/GAP/SE/S/NIT-10/21-22
Open Tender
CIVIL AND ELECTRICAL WORKS
730 days
North Barrackpore Municipal Town
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
virtual meeting
15 Sept 2022
15 Mar 2022
29 Jun 2022
15 Mar 2022
27 Jun 2022
15 Mar 2022
15 Mar 2022 - 23 Mar 2022
24 Mar 2022
Amount
30 MLD STP at Babanpur
Bid Project Cost (including all taxes) for 30 MLD STP
Bid Project Cost (including all taxes) for Associated Infrastructure
O&M CHARGES
O&M charges for 30 MLD STP at Babanpur for first month after Babanpur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for 30 MLD STP for the first month after Babanpur COD (Value should be entered in all cell from 2.06 to 2.17, and should be greater than 0)
For flow < 15 MLD and BOD < 130 mg/L
For flow < 15 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow < 15 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow < 15 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 15 MLD and upto 23 MLD and BOD < 130 mg/L
For flow > 15 MLD and upto 23 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow > 15 MLD and upto 23 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow > 15 MLD and upto 23 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 23 MLD and upto 30 MLD and BOD < 130 mg/L
For flow > 23 MLD and upto 30 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow > 23 MLD and upto 30 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow > 23 MLD and upto 30 MLD and BOD > 200 mg/L and upto 250 mg/L
Power Charges for 30 MLD STP (= 30 X Units Consumed/MLD X 5475 X10.20) = 1675350 (Not to be filled by the Bidder)
Land requirement (sqm) - 30 MLD STP at Babanpur
O&M charges for Associated Infrastructure at Babanpur for first month after Babanpur COD
Manpower
Maintenance and Repair
Associated Infra Guaranteed Energy Consumption for first month after Babanpur COD (30 MLD capacity x Units Consumed/ MLD x 5475 x 1675350)
8 MLD STP at Manirampur
Bid Project Cost (including all taxes) for 8 MLD STP
Bid Project Cost (including all taxes) for Associated Infrastructure
O&M CHARGES
O&M charges for 8 MLD STP at Manirampur for first month after Manirampur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for 8 MLD STP for the first month after Manirampur COD (Value should be entered in all cell from 4.06 to 4.17, and should be greater than 0)
For flow < 4 MLD and BOD < 130 mg/L
For flow < 4 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow < 4 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow < 4 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 4 MLD and upto 6 MLD and BOD < 130 mg/L
For flow > 4 MLD and upto 6 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow > 4 MLD and upto 6 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow > 4 MLD and upto 6 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 6 MLD and upto 8 MLD and BOD < 130 mg/L
For flow > 6 MLD and upto 8 MLD and BOD > 130 mg/L and upto 160 mg/L
For flow > 6 MLD and upto 8 MLD and BOD > 160 mg/L and upto 200 mg/L
For flow > 6 MLD and upto 8 MLD and BOD > 200 mg/L and upto 250 mg/L
Power Charges for 8 MLD STP (= 8 X Units Consumed/MLD X 5475 X 10.20) = 446760 (Not to be filled by the Bidder)
Land requirement (sqm) - 8 MLD STP at Manirampur
O&M charges for Associated Infrastructure at Manirampur for first month after Manirampur COD
Manpower
Maintenance and Repair
Associated Infra Guaranteed Energy Consumption for first month after Manirampur COD (8 MLD capacity x Units Consumed/ MLD x 5475 x 10.20)
Aquatech Solutions Pvt. LTd.
Traders and Engineers Private Limited
R K ENGINNERS SALES LTD
ENVIRO INFRA ENGINEERS PVT LTD
Vishvaraj Environment Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf