| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹3.8 L+₹5,763.31 (1.54%)Rejected-AOC MELEDAM CHAVASSERY PO 670702 | CHAVASSERY | KANNUR | KERALA | 670702 | L2 | Rejected-AOC L2 Hence Rejected |
| Sl No | Description | Qty | Unit | SOMANATHAN M L2 | K V NARAYANAN L1 |
|---|---|---|---|---|---|
| 1.00WORK | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 11.69 | cum | 190.2 ₹2,223.44 | 187.31 ₹2,189.65 Lowest |
| 1.00 | OD63225/2026-2027:Dry rubble masonry with hard stone in foundation and plinth | 23.28 | cum | 3,773.87 ₹87,855.69 | 3,716.62 ₹86,522.91 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.84 | cum | 7,356.04 ₹13,520.4 | 7,244.44 ₹13,315.28 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 91.82 | kilogram | 83 ₹7,621.39 | 81.74 ₹7,505.69 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.98 | sqm | 285.08 ₹3,130.18 | 280.76 ₹3,082.74 Lowest |
| 1.01 | OD107228/2026-2027:Laterite neatly dressed stones of size 35x20x20 cm or nearezt size in cement mortar 1:6 for superstructure above
plinth level up to floor two level including cost of materials labour charges etc. complete.(MOD 50.6.7.2 of DAR) | 9.97 | cum | 5,789.81 ₹57,718.62 | 5,701.98 ₹56,843.04 Lowest |
| 1.01 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 166.5 | kg | 166.85 ₹27,780.53 | 164.32 ₹27,359.28 Lowest |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 9.25 | sqm | 121.71 ₹1,125.82 | 119.86 ₹1,108.71 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 114.17 | sqm | 272.98 ₹31,166.13 | 268.84 ₹30,693.46 Lowest |
Tender Value
₹4.8 L
EMD Value
₹12,009
Closing Date
18 Aug 2026, 5:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT ENGINEER LID EW SECTION IRITTY MUNICIALITY
Annual Plan-IRITTY MUNICIPALITY PROJ NO-175-26-27 construction of compound wall at Parayanad Anganwadi
2026_LSGD_864965_2
AE/ITY/TEN/2/26-27
Open Tender
Civil Works - Buildings
Item Rate
90 days
Iritty Muncipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,060
Yes
₹12,009
Yes
26 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | OD63225/2026-2027:Dry rubble masonry with hard stone in foundation and plinth | - | cum | - | - |
| 1.003 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | kilogram | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.006 | OD107228/2026-2027:Laterite neatly dressed stones of size 35x20x20 cm or nearezt size in cement mortar 1:6 for superstructure above
plinth level up to floor two level including cost of materials labour charges etc. complete.(MOD 50.6.7.2 of DAR) | 1 | cum | - | - |
| 1.007 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | - | kg | - | - |
| 1.008 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | - | sqm | - | - |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1463641.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1463641.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .