Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAdmitted-Finance | ₹6.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.5 Cr+₹33.5 L (5.44%)Admitted-Finance | ₹6.5 Cr+₹33.5 L (5.44%) | L2 | Admitted-Finance |
| 3 | L3₹12.0 Cr+₹5.8 Cr (95.0%)Admitted-Finance | ₹12.0 Cr+₹5.8 Cr (95.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GLOBAL INFRA SOLUTIONS L2 | Segmental Consulting and Infrastructure Advisory Pvt Ltd L3 | AYOLEEZA CONSULTANTS PVT. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00Professional Staff | ||||||
| 1.10 | Team Leader Cum Senior Highway Engineer (1 No) | 30 | Months | 3,25,000 ₹97,50,000 | 1,50,000 ₹45,00,000 Lowest | 3,00,000 ₹90,00,000 |
| 1.20 | Tunnel Design Engineer 1 (1 No) | 12 | Months | 3,00,000 ₹90,00,000 | 1,00,000 ₹30,00,000 Lowest | 3,00,000 ₹90,00,000 |
| 1.30 | Bridge/Structural Engineer (1 No) | 12 | Months | 2,25,000 ₹27,00,000 | 1,00,000 ₹12,00,000 Lowest | 2,25,000 ₹27,00,000 |
| 1.40 | Senior Geologist (1 No) | 12 | Months | 3,25,000 ₹39,00,000 | 1,00,000 ₹12,00,000 Lowest | 2,50,000 ₹30,00,000 |
| 1.50 | Senior Contract Specialist (1 No) | 6 | Months | 1,00,000 ₹6,00,000 | 25,000 ₹1,50,000 Lowest | 2,50,000 ₹15,00,000 |
| 1.60 | Tunnel Safety Expert (1 No) | 4 | Months | 2,00,000 ₹36,00,000 | 25,000 ₹4,50,000 Lowest | 3,00,000 ₹54,00,000 |
| 2.00Sub-Professional Staff | ||||||
| 2.10 | Survey Engineer, 2 Nos. | 24 | Months | 65,000 ₹15,60,000 | 1,55,000 ₹37,20,000 | 60,000 ₹14,40,000 Lowest |
| 2.20 | Assistant Highway Engineer, 1 Nos. | 72 | Months | 65,000 ₹46,80,000 | 1,90,000 ₹1,36,80,000 | 50,000 ₹36,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
17 May 2022, 3:00 pmClosed
B Shivprasad
National Highways and Infrastructure Development Corporation Ltd. 2nd Floor, PTI Building, 4- Parliament Street, New Delhi
CS as AE for Supervision of Up-gradation to two lane from Km. 12.850 to Km.20.300 of 7.450 Km. and Km 20.300 to Km 29.030 on Goha-Khellani section and a link road to Goha Village of 2.016 Km in Jammu and Kashmir
2022_NHIDC_682666_1
NHIDCL/JK/NH-244/G-Krd 83rd Tunnel/AE/2022
Open Tender
Civil Works
Item Rate
2190 days
Jammu and Kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
5 Aug 2022
6 Apr 2022
18 May 2022
6 Apr 2022
17 May 2022
22 Apr 2022
6 Apr 2022 - 11 Apr 2022
11 Apr 2022
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer (1 No)
Tunnel Design Engineer 1 (1 No)
Bridge/Structural Engineer (1 No)
Senior Geologist (1 No)
Senior Contract Specialist (1 No)
Tunnel Safety Expert (1 No)
Sub-Professional Staff
Survey Engineer, 2 Nos.
Assistant Highway Engineer, 1 Nos.
CAD Expert
Lab technician (1Nos.)
Assistant Bridge Engineer, 2Nos.
Quantity Surveyor, 2 Nos.
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (1 nos during Construction Period and 1 nos during Maintenance Period.)
Bolero or equivalent 4x4 vehicle(not more than 3 years old) (1 nos during Construction Period and 1 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 24 round trip to Employer's Head Office and 24 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 200 sqm area shall be rented during Construction Period
One Office of Minimum 50 sqm area shall be rented during Maintenance Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (79.26 kms x 8 times)
Pavement strength measurement using FWD (79.26kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (79.26kms x 8 times)
Road signs inspection using Retro Reflectometer (79.26kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
GLOBAL INFRA SOLUTIONS
Segmental Consulting and Infrastructure Advisory Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .