| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹68.6 LAccepted-AOC | ₹68.6 L Quoted ₹72.3 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹78.2 LRejected-Finance | ₹78.2 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹83.1 LRejected-Finance | ₹83.1 L | L-3 | Rejected-Finance L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹65.8 L
EMD Value
₹1.3 L
Closing Date
8 Feb 2022, 1:00 pmClosed
Chief Engineer, KSTPS, Kota
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Capital, Routine and Breakdown Maintenance of Pumps and Ash Disposal Lines up to Ash Dyke of Stage-I To V of KSTPS, Kota
2022_RRVUN_255630_1
TN-4980
Open Tender
Repair and Maintenance Works
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
Digitally as mentioned in tender documents
₹1.3 L
Yes
24 Nov 2022
28 Jan 2022
9 Feb 2022
28 Jan 2022
8 Feb 2022
28 Jan 2022
Routine, preventive & minor break down maintenance work in general shift of AHP Pump house area, Stg- I to V, associated pumps, pipelines, valves, overhead cranes including checking of oil level & transportation of material from Stores Manpower Required
Unskilled
Semi Skilled
Skilled
Highly Skilled
Routine, Emergency, Breakdown and shift maintenance works for operation of CMR system, drain pump, dewatering pump of both the units including following jobs. These Man Power will also be utilised by AEN(AHP-I/II) for AHP work in General duty. i) Operation of CMR system regularly in all the three shifts of Unit –1 & Unit-2. ii) Maintenance of CMR system as directed by the Engineer i n-charge ii) Unloading of hydro bin as required iii) Operation of drain pump. iv) Checking of operation of dewatering pump, if required. Man Power required
Skilled
Petrolling of all Ash disposal lines (line no. 1 to 8) round the clock for checking leakage anywhere from respective pump house to ash dyke & Daily checking of Ash Dyke for: i) Back flow of Ash water ii) Overflow from boundaries / embankment of ash. iii) Proper positioning of all lines on Steel Structure / Pedestal /Ash Bed. iv) Any leakage of pipe coupling etc. vi) Maintain all ADL record for rotation/ replacement of pipe & bends & other associated work as per direction of work incharge. Man Power required.
Skilled
Un -skilled (in Shift)
Bidder Name
Amount
Krishna Engineering Works(GSTN-08AQDPS2196L1Z9)
M/s MITUL ENGINEERING SERVICES(GSTN-08AFRPS6892L1Z7)
Navdeep Engineer Fabricators(GSTN-08AACFN4499A1ZA)
Navdeep Engineer Fabricators
Krishna Engineering Works
Navdeep Engineer Fabricators
Krishna Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid