| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.0 L+₹26,000 (4.55%)Rejected-AOC | ₹6.0 L+₹26,000 (4.55%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.5 L+₹3.8 L (66.1%)Rejected-AOC | ₹9.5 L+₹3.8 L (66.1%) | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
3 Dec 2022, 2:00 pmClosed
Varghese P O
SM P AND P FACT LTD
Replacement of damaged Chain Links of RC / DD / Product Elevators and damaged chain links of RC / SF Conveyors in NP Plant, FACT CD.
2022_FACT_722862_1
04096/2022-2023/E26329
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM106A).
4 documents required · 4 mandatory
₹0
₹5,000
Yes
24 Jan 2023
11 Nov 2022
5 Dec 2022
11 Nov 2022
3 Dec 2022
11 Nov 2022
Replacement of damaged Chain Links of RC / DD / Product Elevators and damaged chain links of RC / SF Conveyors in NP Plant, FACT CD.
Repair / replacement of chain links of Product Elevator A or B in N P Plant. Work involves : The materials required for the work shall be collected / transported from stores to site. After getting the clearance, boot covers, side covers and all inspection doors shall be opened. Back stopper of gearbox shall be removed and suitably position the broken chain links and buckets, by manual rotation of the elevator chain. The bottom side sprocket assembly shall be lifted with chain block.The buckets, lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link. New chain links, pins and lock pins shall be fixed back in position.The dismantled / new buckets, side covers, bottom side sprocket assembly shall be fixed back properly. All guide angles shall be inspected for loosness, damage and rectified.The damaged Guide angles are to be dismantled and fixed back after repairng on both sides,if required and also the required patch work at the guide angle fixing area is to be done as per the instruction. Box-up boot covers and inspection covers. Fix the back stopper of gearbox and take the trial run. One unit chain link removal/ replacement means the removal of two coupling pins. The removal of no.s of coupling pins wholly depends according to Shift Engineer's Instructions.
Repair / replacement of chain links of DD / RC Elevator A or B in N P Plant. Work involves : The materials required for the work shall be collected / transported from stores to site. After getting the clearance, boot covers, side covers and all inspection doors shall be opened. Back stopper of gearbox shall be removed and suitably position the broken chain links and buckets, by manual rotation of the elevator chain. The bottom side sprocket assembly shall be lifted with chain block. The buckets, lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link. New chain links, pins and lock pins shall be fixed back in position. The dismantled / new buckets, side covers, bottom side sprocket assembly shall be fixed back properly. All guide angles shall be inspected for loosness, damage and rectified.The damaged Guide angles are to be dismantled and fixed back after repairng on both sides,if required and also the required patch work at the guide angle fixing area is to be done as per the instruction.Box-up boot covers and inspection covers. Fix the back stopper of gearbox and take the trial run. One unit chain link removal/ replacement means the removal of two coupling pins.The removal of no.s of coupling pins wholly depends according to Shift Engineer's Instructions.
Repair / replacement of chain links of RC / SF Conveyor A or B in NP Plant. Work involves : The materials required for the work shall be collected / transported from stores to site. After getting the clearance, back and front doors, side covers and inspection doors shall be opened. Suitably position the brocken chain links and flights for repair. Adjust Tail Sprocket if required. The flights, lock pins and connecting pins of the damaged links shall be removed to dismantle / take out the damaged chain link. New chain links, pins and lock pins shall be fixed back in position. The dismantled or new flights shall be fixed back and tightened properly. Tightening / loosening of the tail end sprocket sssembly shall be done as per instruction. Box-up all doors, covers and inspection covers.Take trial run of the RC / SF Conveyor and box-up back and front doors. One unit chain link removal/ replacement means the removal of two coupling pins. The removal of no.s of coupling pins wholly depends according to Shift Engineer's Instructions.
BABY B
K G SIVANANDAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_760275.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .