Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 L+₹3,950 (0.68%)Admitted-Finance | ₹5.9 L+₹3,950 (0.68%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹19,864.36 (3.41%)Admitted-Finance | ₹6.0 L+₹19,864.36 (3.41%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HimTop Construction L3 | M/s Sharma Light house L2 | Shamoo Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | contour survey of complete area identified by the Department and Conversion of contour and alignment files in Auto CAD and contour development, contour alignment and placing of components on maps and preparing of plan and providing soft copies of map on Auto CAD including Engineer visit as per complete in all leads and lifts and to the entire staisfaction of Engineer-in-Charge upto all leads and lifts. | 38 | Day | 15,237.22 ₹5,79,014.36 | 15,000 ₹5,70,000 | 14,750 ₹5,60,500 Lowest |
| 2.00Providing drawings of the work on below mentioned paper as per complete in all leads and lifts and to the entire satisfaction of Engineer-in-charge upto all leads and lifts. | ||||||
| 2.01 | A0 color print. | 15 | Each | 820 ₹12,300 | 700 ₹10,500 Lowest | 790 ₹11,850 |
| 2.02 | A1 color print | 15 | Each | 420 ₹6,300 | 250 ₹3,750 Lowest | 390 ₹5,850 |
| 2.03 | A3 color print | 15 | Each | 320 ₹4,800 | 150 ₹2,250 Lowest | 290 ₹4,350 |
Tender Value
₹4.9 L
EMD Value
₹9,880
Closing Date
30 Apr 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Carrying out contour survey for identified flood protection project
2026_HPIPH_134944_1
773-822 Dated 22-04-2026
Open Tender
Civil Works
Item Rate
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer
₹9,880
11 May 2026
22 Apr 2026
2 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | contour survey of complete area identified by the Department and Conversion of contour and alignment files in Auto CAD and contour development, contour alignment and placing of components on maps and preparing of plan and providing soft copies of map on Auto CAD including Engineer visit as per complete in all leads and lifts and to the entire staisfaction of Engineer-in-Charge upto all leads and lifts. | - | Day | - | - |
| - | Providing drawings of the work on below mentioned paper as per complete in all leads and lifts and to the entire satisfaction of Engineer-in-charge upto all leads and lifts. | - | - | - | - |
| - | A0 color print. | - | Each | - | - |
| - | A1 color print | - | Each | - | - |
| - | A3 color print | - | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_199673.xls
BOQ • 0.27 MB
Form6.pdf
Tender Documents • 0.78 MB
Form8.pdf
Tender Documents • 1.25 MB
TC.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .