| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.5 L+₹64,502 (5.42%)Rejected-Finance 3 G M C MARKET G N B ROAD CHANDMARI KAMRUP ASSAM 781003 | KAMRUP METRO | ASSAM | 781003 | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.6 L+₹1.7 L (14.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹13.8 L+₹1.9 L (16.0%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹22.7 L+₹10.8 L (90.9%)Rejected-Finance KA 273 SECTOR 12 FIRST FLOOR PRATAP VIHAR VILLAGE TOWN PRATAP VIHAR CITY GHAZIABAD GHAZIABAD UTTAR PRADESH 201009 INDIA | GHAZIABAD | UTTAR PRADESH | 201009 | L5 | Rejected-Finance L5 |
Tender Value
₹14.3 L
EMD Value
₹28,533
Closing Date
23 Aug 2022, 3:00 pmClosed
AGM (E-E), AAI, Silchar Airport
AAI, Silchar Airport
Conversion of manual to automatic Operation of fire hydrant system at Silchar Airport
2022_AAI_124333_1
AAI/SIL/ENGG-E/ FIRE HYDRANT/2022-23
Open Tender
Electrical Works
Works
90 days
AAI, Silchar Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹28,533
29 Sept 2022
2 Aug 2022
24 Aug 2022
2 Aug 2022
23 Aug 2022
2 Aug 2022
2 Aug 2022 - 5 Aug 2022
Amount
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 'C' class MS pipe of dia 6 inch (150 mm) for suction line of 2 nos 50 HP fire hydrant pumps. Length - As per site requirement.
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 'C' class MS pipe of dia 4 inch (100 mm) for suction line of jockey pump. Length - As per site requirement.
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 'C' class MS pipe of dia 3 inch ( 80 mm) for suction line of 2 nos 3 HP pumps. Length - As per site requirement.
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 6 inch (150 mm), CI foot valve for 2 nos 50 HP fire hydrant pumps.
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 4 inch (100 mm), CI foot valve for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 3 inch (80 mm), CI foot valve for 2 nos 3 HP pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 6 inch(150 mm), CI butterfly valve for 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 4 inch(100 mm), CI butterfly valve for for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 3 inch (80 mm), CI butterfly valve for 2 nos 3 HP pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 6 inch (150 mm), CI non return valve for 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 4 inch (100 mm), CI non return valve for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 3 inch (80 mm), CI non return valve for 2 nos 3 HP pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 6 inch (150 mm), MS bend for suction line of 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 4 inch (100 mm), MS bend for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 3 inch (80 mm), MS bend with nut bolt for 2 nos 3 HP pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 6 inch (150 mm), MS flange with nut bolt for suction line of 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 4 inch (100 mm), MS flange with nut bolt for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. 3 inch (80 mm), MS flange with nut bolt for 2 nos 3 HP pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. Pressure switch of 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. Pressure switch for jockey pump
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. Pressure gauge of 2 nos 50 HP fire hydrant pumps
Supply, fixing/installation, testing and commissioning of following suction pipeline and all other related accessories after dismantling and making good the same as before of RCC top cover of fire hydrant reservoir (as necessary) and making the fire hydrant system completely operational as required. Pressure gauge for jockey pump
Complete modification of fire hydrant control panel including modification to auto pressurization system by supply & fixing of following pressure switches and pressure gauge and all necessary electrical, mechanical and electronic spares, necessary wiring inside the panel complete as required. (i) Pressure switch for 2 nos 50 HP fire hydrant pumps - 2 nos (ii) Pressure switch for jockey pump - 1 no (iii) Pressure gauge for 2 nos 50 HP fire hydrant pumps - 2 nos (iv) Pressure gauge for jockey pump - 1 no
Provision of priming line with 2 inch dia 'B' class GI pipe with the existing priming tank for 2 nos 50 HP capacity fire hydrant pumps, 01 no jockey pump and 2 nos 3 HP pumps for filling of overhead tank including supply and fixing of gate valve of suitable size and quantity as per site requirement complete as required.
SITC of 3HP motor pump set having following specifications of motor & pump for water transfer as follows: Motor: Single/Three phase,3HP,2900 RPM, LV Squirrel Cage Induction motor totally enclosed fan cooled horizontal foot mounted, continuously rated class B/F insulation having degree of protection IP 44/55 suitable for coupling with water delivery pump system complete as required. Pump: 3HP, 2 pole mono block pump having minimum discharge 3.5 LPS and head upto 15 mtr, 2900 RPM suitable for 80/65 mm suction and delivery pipe including all accessories like base frame, coupling, coupling guard, foudation bolts & nuts etc. including installation testing & commissioning & connection to the existing pipe line of the motor pump set complete as required.
Supply, Installation, Testing and Commissioning of DOL starter suitable for operation of 3HP motor pump set including fixing the starter on existing wall, electrical wiring complete as required.
Supply, Installation, Testing and Commissioning of 5 HP capacity submersible pump including suitable star- delta starter, fixing the starter panel at suitable location, complete power supply wiring / cabling of the starter panel, providing suitable hoisting metallic rope for lifting the submersible pumps complete as required.
Dismantling of existing suction lines of fire hydrant pumps, transfer pumps, jockey pump, different types of valves, flange, bends, pressure switches, pressure gauge and storing the dismantled materials at AAI store complete as required as per site condition.
Fire Equipments Supply Agency
SAFE GUARD (INDIA)
FAIRDEAL ASSOCIATES
3D FIRE AND SAFETY PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .