| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-Finance | ₹3.4 Cr | L1 | Accepted-Finance Due to L1 |
| 2 | L2₹3.4 Cr+₹2.3 L (0.69%)Rejected-Finance NEAR HAIDAKHAN MANDIR VILL PO CHILIYANAULA RANIKHET DISTT ALMORA UTTARAKHAND 263645 | ALMORA | UTTARAKHAND | 263645 | ₹3.4 Cr+₹2.3 L (0.69%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹3.4 Cr+₹3.5 L (1.04%)Rejected-Finance HIMACHAL PRADESH | ₹3.4 Cr+₹3.5 L (1.04%) | L3 | Rejected-Finance Due to L3 |
| 4 | L4₹4.4 Cr+₹1.0 Cr (30.3%)Rejected-Finance VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹4.4 Cr+₹1.0 Cr (30.3%) | L4 | Rejected-Finance Due to L4 |
| 5 | Rejected-Technical R O BLOCK NO 2 FLAT NO B 1 STRAWBARY HILL CHOTTA SHIMLA 2 HP | CHAMBA | HIMACHAL PRADESH | 176207 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
23 Aug 2021, 11:00 amClosed
EE Bilaspur Division No. 2 HPPWD Bilaspur
EE Bilaspur Division No. 2 HPPWD Bilaspur
C/o link road from Galwa to Challella Km. 0/0 to 4/765 (SH- F/C, i/c Retaining wall, C.D. work GSB Mettaling Tarring, road side drain, Parapets and Km. stones etc. Km. 0/0 to 4/765, including Five years maintenance plan) under Nabard RIDF-XXVI
2021_PWD_51074_1
PW-NBT/CB/Tender/2020/5120-24 dated 26.07.2021
Open Tender
Civil Works
Item Rate
540 days
Bilaspur
Refer to SBD
10 documents required · 10 mandatory
₹5,000
EE Bilaspur Division No. 2 HPPWD Bilaspur
₹9.4 L
4 Sept 2021
12 Aug 2021
23 Aug 2021
12 Aug 2021
23 Aug 2021
12 Aug 2021
Amount
Excavation in hilly area in all heights and depths in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil , soft rocks, hard rocks, chiselling/wedging out of rock (where blasting is prohibited ) and other intermediate classification of soil setting out true to the required line, graded width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in-Charge at site according to the M.O.R.D Technical Specification,2014 Clause 300,1603.1,1603.2, & sorting out useful material and stacking the same in all leads and lifts in acquired width of the road and transportation of material for filling in road way, camber ,embankments for grade improvements and disposal of all useful /surplus materials to required width of the road or on approved dumping sites, through all modes of transportation including head load or animals transport or mechanical means, alongwith its levelling fine dressing and carriage of machineries, materials tools equipments and execution shall be absolute responsibility of the Contractor which shall have to be duly compensated by him in all cases as per direction of Engineer-in-Charges including carriage of materials within all leads and lifts.The rate including octori,royality , Malkana , toll tax, sale tax or other taxes imposed by the Govt. A recovery of useful stone for 2642.28 (Two thousand six hundred forty two point twenty eight)Per Cubic metre at the rate of Rs.300/- (Rs. Three hundred ) Per Cubic metre shall be done on pro-rate basis in each running bill for this item including carriage of materials in all leads lifts as per the direction of the Engineer-in-Charge.
Construction of embankment with material obtained from Roadway cutting construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300.1 and 300.2 as per Technical Specification MORD,2014 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Earth work in Excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiselling/wedging out of rock (where blasting is prohibited) as per drawings and M.O.R.D Technical specification MORD,2014, Clause 305.1 including setting out construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 150mm (One hundred fifty milimetres) compacted thickness including shorting , strutting , pumping and bailing out water (surface and sub-soil water )upto all depth and any quantum of water including cleaning of slush which may arise out during dewatering or as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and MORD Technical Specification MORD,2014,Clauses,802,803,1202 and 1203(1:5:10) (One Cement five sand ten graded crushed stone aggregate on ground or under water,40mm(Forty milimetre nominal size) including cost of form work and curing complete,including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying mechanically mixed and vibrated concrete, for plain / reinforced concrete in open foundations for all type of structure complete of plain cement concrete , (Nominal mixed 1:4:8)(One Cement four sand eight graded crushed stone aggregate)25mm (Twenty five milimetre size)nominal size in or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawing and M.O.R.D technical specification,2014, Clause 802,803,1202 &1203 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying mechanically mixed and vibrated concrete, for plain reinforced concrete in open foundations for all type of structure complete of plain cement concrete grade M-10(M-Ten) design mix on ground or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawing and M.O.R.D technical specification,2014, Clause 802,803,1202 and 1203 as per direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying mechanically mixed and vibrated concrete, for plain reinforced concrete in open foundaion for all type of structure laying concrete grade M-15(M-Fifteen) grade minimum cement contents ,240 kg. (Two hundred forty kilogrmme) on ground or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawing and M.O.R.D technical specification ,2014,Clause 802,803,1202 and 1203 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing concrete for plain /reinforced concrete in Sub-Structure complete as per drawing and technical specifications MORD 2014, Clauses 802 ,804,805,806,807,1202 and 1204 , P.C.C grade M-20 grade design mix minimum cement contents 250kg. (Two hundred fifty kilogramme) Per Cubic metre,including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying mechanically mixed and vibrated concrete, for plain /reinforced cement concrete in Sub-Structure for all type of structure laying of Reinforcement cement concrete grade M-25 grade design mix minimum cement contents 300 kg.(Three hundred kilogramme) per cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawing and M.O.R.D technical specification ,2014,Clause 800,1205.4 and 1205.5 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing back filling with granular material behind abutment, wing walls, return walls and retaining/breast walls to the full height compacted to firm condition complete as per drawing and M.O.R.D technical specification ,2014,clause 802.804,805,806,807,1202 and 1204 and as per direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, Wing wall, Return wall Retaining wall with 100mm (One hundred millimetre)dia PVC pipe extending through the full width of the structure with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification MORD,2014,clause 614,709,1204.3.7 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Supplying, fitting and placing TMT bar reinforcement in Super--Structure complete as per drawings and Technical Specifications MORD,2014, Clause 1002,1005,1010 and 1202 cutting bending binding and placing in position complete,including cost of binding wire including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and fixing Drainage spouts complete as per drawing and technical specifications MORD,2014.clause -1209, as per direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying(to level or slopes)900mm dia( Nine hundred millimetre dia metre)reinforced cement concrete non pressure pipe I.S.Class NP2 for culverts on first class bedding of granular material in single row, including fixing collars, with cement mortar 1:2(One Cement two sand )but excluding the cost of excavation, protection work, back filling concrete and masonry work in head walls and parapets as per drawing and M.O.R.D Technical specification,2014, clause 1101 and as per direction of Engineer-in-Charge, including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Preparation of Sub-grade by dressing to camber(Earth work for the cutting involved for sub-grade to be paid for separately) depending upon the classification of soil completed as per H.P.PWD, Specifications including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Consolidation of sub-grade with road roller including making good the undulation etc.with earth or quarry soil etc. and re-rolling the sub-grade completed as per H.P.PWD,Specifications,including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Construction of granular sub-base by Providing well graded material, mixing in mechanical mix plant at OMC, carriage of mixed material to work site spreading in iniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density completed as per Technical Specification MORD,2014.Clause -401.including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contracwtor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing laying ,spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carriage of mixed materials by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 KN(Eighty to hundred )KN weight to achieve the desired density incuding lighting barricading and maintenance of diversion etc. as per Tables 400.11 and 400.12 and Technical Specification MORD,2014,Clause 406 .including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 -1.00 (Zero point seven zero to one point zero)Kilogram per Square metre using mechanical means/manual means as per Technical Specifications MORD,2014. Clause 502 including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and applying Tack coat with bitumen emulsion (RS-I ) using emulsion distributior @ 0.25 to 0.30 Kg. (Zero point two five to Zero point three zero ) Killogram per Square metre on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification MORD,2014. Clause-503 and as per direction of Engineer-in-Charge,including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and laying bitumenious concrete with 100-120 TPH batch type hot mix plant producing an average output of 75(Seventy five) Tonne per hour using crushed stone aggregates of specified grading premixed with bitumenious binder V.G 30(Viscosity grade Thirty @ 5.4 to 5.6 (Five point four to Five point Six)percent of mixed and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandern rollers to achieve the desired degree of compaction as per MORTH Specification Clause 509 complete in all respect .(Bitumen concrete )Thickness 30mm(Thirty milimetre)i and as per direction of Engineer-in-Charge, including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Construction of Parapets with plain cement concrete, 1:5:10(One cement five sand Ten graded crushed stone aggregate,40mm(Forty millimetre ), nominal size, and curing complete including the cost of form work with the steel plates and filled by bitumen drums in dressiest as per drawing and H.P.PWD,Technical Specification with parapet size 185 cm x 45 cmx 60 cm (one hundred eighty five centimetre into Forty five centimetre into Sixty centimetre )including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Reinforced cement concrete M15(M-Fifteen) grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc. as per drawing and Technical Specification Clause 1700 For Ist and 5th Kilometre stones (precast)including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not enterain any claim whatsoever in this respect of the same.
Reinforced cement concrete M15(M-Fifteen) grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc. as per drawing and Technical Specification MORD,2014.Clause 1700 Ordinary Kilometre stone precast including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contracwtor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and fixing of semi reflective cautionery, mandatory and informatory sign board as per IRC:67 made of 1.5mm (One point five milimetre)thick M.S sheet duly stove white colour in front and gray colour on back with red reflective border of 65mm (Sixty five milimetre) width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mmx47mmx(Forty seven milimetre into forty seven milimetre)12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15(M-Fifteen) grade cement concrete 450x450x600mm, 600mm(Four hundred fifty into four hundred fifty into six hundred milimetre, six hundred milimetre) below ground level as per approved drawing Clause 1701.2.2. 800mmx600,,(Eight hundred milimetre into six hundred milimetre))rectangular.including entire carriage of material within all leads, lifts and other incidentals or as per direction of Engineer-in-Charge .The rate includes octroi, royality Malkana, toll tax, sale tax or other taxes imposed by the Government .
Providing and fixing of semi reflective cautionery, mandatory and informatory sign board as per IRC:67 made of 1.5mm (One point five milimetre)thick M.S sheet duly stove white colour in front and gray colour on back with red reflective border of 65mm (Sixty five milimetre) width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mmx47mmx(Forty seven milimetre into forty seven milimetre)12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15(M-Fifteen) grade cement concrete 450x450x600mm, 600mm(Four hundred fifty into four hundred fifty into six hundred milimetre, six hundred milimetre) below ground level as per approved drawing Clause 1701.2.2. Cautionery board (600mm (Six hundred milimetre)Equilateral)including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contracwtor and Government shall not enterain any claim whatsoever in this respect of the same.
Providing and fixing of semi reflective cautionery, mandatory and informatory sign board as per IRC:67 made of 1.5mm (One point five milimetre)thick M.S sheet duly stove white colour in front and gray colour on back with red reflective border of 65mm (Sixty five milimetre) width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mmx47mmx(Forty seven milimetre into forty seven milimetre)12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15(M-Fifteen) grade cement concrete 450x450x600mm, 600mm(Four hundred fifty into four hundred fifty into six hundred milimetre, six hundred milimetre) below ground level as per approved drawing Clause 1701.2.2. Mandatory (600mm (Six hundred milimetre)*Circular)including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contracwtor and Government shall not enterain any claim whatsoever in this respect of the same.
Painting lines dashes , arrows etc. On road in two coats on new work with ready mixed road marking paint confirming to IS: 64 on bituminous /concrete surface including cleaning the surface of all dirt and dust other foreign matter , demarcation at site and traffuc control as per drwing and Techncal Specifications Clauses,1702..including carriage of material within all leads and lifts and other incidental.The rate includes octroi, royality Malkana toll tax,Goods and service Tax, building and other construction worker, welfare cess royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contracwtor and Government shall not enterain any claim whatsoever in this respect of the same.
Maintenance for Five years after completion of construction work as per items and condition of bid documents of Contract dated to General conditions and contract Technical Specifications of Ministry of Rural Development for Rural Road including good services tax including haulage carriage of labour equipment and material to various location through all Modes of transportation in all leads and lifts to the entire saitisfaction of Engineer-in-Charge.
For Ist Year.(First year)
For 2nd year(Second year)..
For 3rd Year.(Third year)
For 4th Year.(Fourth year).
For 5th Year.(Fifty year).
SS CONSTRUCTION COMPANY
RAVINDER KUMAR
Manohar Lal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .