| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 Cr+₹16.3 L (4.56%)Admitted-Finance 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹3.7 Cr+₹16.3 L (4.56%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 7 CANAL VIEW GIANI ZAIL SINGH NAGAR RUPNAGAR PUNJAB 140001 INDIA | RUPNAGAR | PUNJAB | 140001 | - | - | Rejected-Technical Technically not Qualified |
| Sl No | Description | Qty | Unit | Fibretech L1 | Multitech Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Pre-shutdown Survey | 1 | Job | 50,000 ₹50,000 Lowest | 55,000 ₹55,000 |
| 2.00 | Dewatering of machine (Arrangement of divers shall be in the scope of contactor) | 1 | Job | 50,000 ₹50,000 Lowest | 55,000 ₹55,000 |
| 3.00 | Dismantling of the Machine. | 1 | Job | 26,00,000 ₹26,00,000 Lowest | 27,00,000 ₹27,00,000 |
| 4.00 | Post –Dismantling Inspection, Testing , Measurement and Analysis | 1 | Job | 50,000 ₹50,000 Lowest | 55,000 ₹55,000 |
| 5.00 | Repair of Runner Blades | 1 | Job | 30,00,000 ₹30,00,000 Lowest | 31,00,000 ₹31,00,000 |
| 6.00 | Repair of Guide Vane | 1 | Job | 16,00,000 ₹16,00,000 Lowest | 16,50,000 ₹16,50,000 |
| 7.00 | Repair, re-babitting, DP test and Ultrasonic test of GGB, TGB and Thrust Bearing Pads | 1 | Job | 15,00,000 ₹15,00,000 Lowest | 15,50,000 ₹15,50,000 |
| 8.00 | Repair of Guide Vane Bearing body assemblies | 1 | Job | 6,00,000 ₹6,00,000 Lowest | 6,25,000 ₹6,25,000 |
| 9.00 | Repair of Runner Hub | 1 | Job | 6,00,000 ₹6,00,000 Lowest | 6,25,000 ₹6,25,000 |
| 10.00 | Repairing of Runner cone | 1 | Job | 4,00,000 ₹4,00,000 Lowest | 4,25,000 ₹4,25,000 |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
21 Oct 2024, 3:00 pmClosed
Executive Engineer (M G) Kulhal Power Station, UJV
Office of the Executive Engineer (M G) Kulhal Power Station, UJVN Ltd
Major overhauling and repair of Unit-C of Kulhal Power Station (3x10 MW)
2024_UJVN_76435_1
08/UJVNL/EE (MG)/KPS/2024-25
Open Tender
Electrical Works
Item Rate
120 days
Kulhal poer Station
Please refer Tender documents.
3 documents required · 3 mandatory
₹17,700
UJVNL Kulhal P S (A/c No 1072002105502148) PNB
₹7.2 L
29 Oct 2024
30 Sept 2024
25 Oct 2024
30 Sept 2024
21 Oct 2024
5 Oct 2024
Amount
Pre-shutdown Survey
Dewatering of machine (Arrangement of divers shall be in the scope of contactor)
Dismantling of the Machine.
Post –Dismantling Inspection, Testing , Measurement and Analysis
Repair of Runner Blades
Repair of Guide Vane
Repair, re-babitting, DP test and Ultrasonic test of GGB, TGB and Thrust Bearing Pads
Repair of Guide Vane Bearing body assemblies
Repair of Runner Hub
Repairing of Runner cone
Repair of Runner Chamber
Repair of Top Cover
Repair of Guide Vanes Servo Motor
Repair of Regulating Ring
Repair of Governing System & OPU system
Compatible OPU pump motor starter control panel as specified above suitable for following HP of motor 40 HP motor panel.(as per technical specification)
Repairing and overhauling electronic solonide valve(ESV)
Repairing of Upper bracket and turbine pit cover
Repairing and overhauling of oil header
Repairing of clean water system(stainers)
Repairing of Penstock drain valve and Draft tube drain valve
Automation of pre-installed weda pump
Repair of Turbine Shaft assembly
Repair of Pivot Ring
Pressure grouting of draft tube
Overhauling of Generator Stator, Pilot stator, Main Excitor Assembly
Providing and replacement Complete wedges in for Slot 100 No
Fixing of New Carbon Brushes Grade EGOR
ELCID testing, Wedge Deflection Tests after replacement of new wedges
a) Over Voltage Test
b) DC High Voltage Test
c) AC High Voltage Test
d) Partial Discharge Test
e) Tan Delta and Tan Delta Tip Up
f) Capacitance and Capacitance increment
g) Partial Discharge Test inception voltage
Rewinding of PMG rotor pole -32 No.
ITC (Installation Testing and comissioning) of braking& jacking system panel with all accessories
ITC (Installation Testing and comissioning) NGT transformer rating: 6.6kV/110 V ,20 kVA, register- 0.289 ohm & rated current continuous 220 Amp
Dismantling, cleaning, repairing & reassembly of Generator Stator Water Coolers (08 NO)
Retubing of Generator Water Cooler all 84 copper tubes.
Lagging over cooling pipe line by Class O, Nitride Insulation Closed Cell Sheet, thickness min. 15 mm.
Making of Rotor Pole joint and also replace the copper strip connection in all thrre machine A,B &C
Fixing of multistrand DC copper cable 150 sq mm
Fixing of 100 mm LCD frequency display unit.
Fxing of 100 mm LCD RPM display unit
Fixing of 6.6 kV Post Insulator
Fixing of 11 kV post insulator for bus bar support in Generator & GT side cubical.
Laying of Single core 500 sq mm,6.6 kV power cable from Gen Duct to T/F duct (07 Nos ,200 m each) and fixing the end joint kit and associated work.
Shiting the old power cable after rolling on drum from Cable Gallery to Center Store (07 Nos ,200 m each)
Fixing of diffused LED panel light & strip LED light for lower bracket area.
Copper Plate Earting 600x600x6 mm with 50x5 mm copper strip termination for Gen Transformer
Dismantling of old LA assembly and fixing of new Lightening Arrestor assembly with surge monitor 120 kVA class 3 zinc oxide -03 nos
Overhauling of Stator Air Cooler Cast Steel glove valve: 150 mm
Overhauling of Stator Air Cooler Cast Steel glove valve 100 mm
Overhauling of Stator Air Cooler Cast Steel glove valve 50 mm
Overhauling of AVR (Automatic Voltage Regulator) System along with reheostat
Replacement of Instruments: RTD- Pt-100 with calibration
TSD-150 mm dial , 15 mtr length with calibration
Fixing of Lightning Arrestor 6.6 kV for Generator
Filtration of UAT, Station Ist & IInd and Generator Transformer Oil
Dissolved Gas Analysis (DGA) & Furan test, BDV and Water content of Gen Transformer Oil and UAT, Station Ist & IInd
Painting of UAT, Station Ist & IInd and Generator Transformer
Repairing & Overhauling of Circuit breaker Control Panel
Painting of all metallic parts
Reassembly, Alignment, Leveling & Re-commissioning of the Unit
Testing, Commissioning, Dry Out and Synchronization
Dynamic balancing and vibration testing of machine Vibration testing of machine
Supply of self lubricated bushes upper side for TGB (Make- Throdon)
Supply of self lubricated bushes middle side(Make- Throdon)
Supply of self lubricated bushes bottom side(Make- Throdon)
Supply of self lubricated bushes guide vane linkage(Make- Throdon)
Supply of runner hub MS locking plate and SS cover plate
Supply of SS HT stud with nut of size is M-27 X 90mm ( as per sample)
Supply of Servo motor limit switch (as per sample)
Supply of Brass side-08 nos and bottom pad -08 nos
Supply of Piano wire with attachment
Supply of feed- back mechanism steel wire rope dia -8 mm
Supply of electronic solonide valve(ESV) for 115% over speed tripping( as per sample)
Supply of OPU pump( as per sample)
Supply of NRV for OPU pump (as per sample)
Supply of Governor Limit switch(as per sample)
Supply of OPU NRV limit switch
Supply of CI glow- valve-50mm, (high pressure, 40 kg testing) (as per sample)
Supply of CI glow- valve-25mm, (high pressure, 40 kg testing)
Supply of NRV cup seal/gland seal, make – Neoprene(as per sample)
Supply of ‘O’ Ring and gas kits (as per sample)
Supply of Heavy duty Filter (as per sample)
Supply and fixing Glass/ Acrylic Tubes for oil level indicator/gauge technical scale with limit switch of OPU(as per sample)
Supply of digital techo meter/speed meter 10 mm x 100 mm size, range 0-200 %
Supply of CI globe valve dia 100 mm rising spindle
Supply of GM bushes for oil header
Supply of MS Bucket with wire mesh complete
Supply of CI Gate valve rising spindle 80 mm
Supply of GM vertical NRV dia- 50 mm
Supply of Neoprene air seal for TGB
Supply of Neoprene gland seal for TGB
Supply of New Carbon Brushes Grade EGOR
Supply of braking& jacking double acting system panel with all accessories
Supply NGT transformer rating : 6.6kV/110 V ,20 kVA, register- 0.289 ohm & rated current continuous 220 Amp
Supply of FCB contact coil as per sample
Supply of multistrand DC copper cable 150 sq mm
Supply of 100 mm LCD frequency display unit.
Supply of 100 mm LCD RPM display unit
Supply of 6.6 kv Post Insulator as per sample
Supply of 11 kV post insulator for bus bar support in Generator & GT side cubical.
Supply of Cable clamp complete suitable for 500 sq mm single core cable as per sample
Supply of Heat shrinkable Indoor termination kit for Single core cable ,500 sq mm, 11kV(E)
Supply of diffused LED panel light & strip LED light for lower bracket area.
Providing of Lightning Arrestor 6.6 kV for Generator
Supply of Lightening Arrestor assembly with surge monitor 120 kVA class 3 zinc oxide
Supply of Cup seal (LV bushing) as per sample
Supply of HV Bushing 132 kV
Supply of LV bushing 6.6 kV
Supply of OTI and WTI
Supply of Generator Transformer Inlet Outlet valve as per sample
Field Testing & Maintenance of unit protection Relay Panel (Numerical Relays generator & transformer protection.)(as per scope of work)
Generator Testing (as per scope of work)
Intake gate control panel field testing.(as per scope of work)
Generator Transformer testing (as per scope of work)
UAT Testing (as per scope of work)
Earth resistance testing(as per scope of work)
Unit circuit Breaker testing (as per scope of work)
LBB testing(as per scope of work)
Governor testing speed 115%,165% and gate testing
DC earth fault testing (as per scope of work)
Multitech Engineers (BID ID -340783)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD_08.pdf
Tender Documents • 1.61 MB
BOQ_91224.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .