Loading…
Loading…
Tender Value
₹53.3 L
EMD Value
₹54,000
Closing Date
12 May 2026, 6:00 pmClosed
Executive Engineer Sipu Project Division, Palanpur
Construction Of Steel Fabricated Foot Bridge And Dowell Wall At Various Location Of MD-1 Distry and Nagafana Minor of Sipu Main Canal (IInd Attempt)
300448
Notice No.1 of 2026-27
Open
Civil Works - Others
Banaskantha
6 documents required · 6 mandatory
₹2,400
Executive Engineer Sipu Project Division Palanpur
₹54,000
1 May 2026
1 May 2026
1 May 2026
12 May 2026
1 May 2026
BILL OF QUANTITIES
Name of Work :- Construction Of Steel Fabricated Foot Bridge And Dowell Wall At
Various Location Of MD-1 Distry and Nagafana Minor of Sipu
Main Canal (IInd Attempt)
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy,
gravelly soil including soft murrum & H.M.
including sorting & stacking and depositing the
excavated stuff in uniform layers as and where 381.20 Cu.M. 79.00
directed upto lead of 30 m and lift as shown
below including clearing the site etc. compute
(including dewatering). (B) For foundation
trenches of C.D. work (a) 0 to 3 Mt. depth
2 Providing and laying foundation concrete of
proportion as under by using cement, sand and
machine crushed course aggregate laid in situ
including necessary temping, smooth finishing,
watering and curing as directed with all leads
and lifts etc complete. (a) PCC 1:3:6
3 Providing and laying CC 1:2:4 grade using
cement, sand & crushed metal incuding
providing & erecting necessary form work,
centering, vibrating, smooth finishing, watering
& curing as directed with all leads & lifts etc.
complete.(a) Sub structures
(b) Super structures 463.50 Cu.M. 5053.10
4 Manufacture, Supply and Errection of steel truss
for foot bridge of canal as per drawing including
cost of materials, labours, cutting, bending,
welding, jigs and fixture including conveyance
of parts at site of erection, tools and tackls,
scaffolding etc. including erection in position as
per drawing and specification.
(A) For ISMB Member 4.289 MT 97782.39
(B) For Angle Member 3.284 MT 98219.12
(C) For Chequared Plate 3.249 MT 109536.77
(D) For Nut-Bolt 177.60 Kg 108.00
5 Earth work in embankment from borrow pits in
all sorts of soil and soft murrum or other
suitable strata as directed including breaking
the clods and dressing to the design sections 1640.00 Cu.M. 88.00
including cutting the proud section with lead as
under and all lift including site clearing etc.
complete. (c) 200 to 1000 Mt.
6 Providing and laying HYSD/TMT Fe-415,500D
steel bar reinforcement for R.C.C. works and 0.14 MT 71366.00
anchor bars with providing binding wires
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
including cutting, bending, welding, binding in
position, hooking, placing in position with all
leads & lifts etc. complete. (c) TMT Fe-500D
Rupees Fifty Three Lakh Twenty Five Thousand Eighty One Paise Thirty Five Only
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Canal Sub Division No-2 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida No-1 of 2026-27 (Gujarati-English) (f).pdf
SBD Foot Bridge and Dowell MD-1.pdf
SCH-B Foot Bridge and Dowell MD-1.pdf
Download all tender documents and submit your bid