| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.5 CrAdmitted-Finance SANTA DANGAL BURNPUR ROAD NEAR GALAXY MALL BARDHAMAN WEST BENGAL 713325 | PASCHIM BARDHAMAN | WEST BENGAL | 713325 | -25.51% | ₹28.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹31.1 CrAdmitted-Finance | -3.33% | ₹31.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹31.7 CrAdmitted-Finance | +9.24% | ₹31.7 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee | - | - | - | Not Admitted-Fee Fee not received |
Tender Value
₹32.5 Cr
EMD Value
₹32.5 L
Closing Date
2 Sept 2020, 4:00 pmClosed
Sr. Regional Manager
RIICO Ltd. Bhiwadi-II
Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan
2020_RIICO_194544_1
11/2020-21
Open Tender
Civil Works - Water Works
545 days
I/A Salarpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
RIICO Ltd
₹32.5 L
RIICO Ltd. Bhiwadi-II
14 Sept 2020
12 Aug 2020
7 Sept 2020
16 Aug 2020
2 Sept 2020
20 Aug 2020
19 Aug 2020
eProcurement System Government of Rajasthan Created By: SURENDRA PRASAD SHARMA Created Date/Time: 14-Sep-2020 11:19 AM Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Tender Inviting Authority: Sr. Regional Manager, RIICO Ltd. Bhiwadi-II
Name of Work: Development of the infrastructure at Industrial Area Salarpur (Rain Water Harvesting Works - BSR Items) (PWD Rajasthan BSR Road & Building Works-2019 Alwar Circle, PHED Rajasthan BSR-2019, RUIDP Rajasthan BSR-2017, Electrical Rajasthan BSR-2013)
Contract No: 11/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s DEVENDRA CONSTRUCTION CO. 81056197.51 -3.33 78357026.13 Seven Crore Eighty Three Lakh Fifty Seven Thousand Twenty Six
2.00 yadav construction company 81056197.51 -25.51 60378761.53 Six Crore Three Lakh Seventy Eight Thousand Seven Hundred and Sixty One
3.00 lahotybuildcon 81056197.51 9.24 88545790.16 Eight Crore Eighty Five Lakh Fourty Five Thousand Seven Hundred and Ninty
Lowest Amount Quoted BY: yadav construction company(60378761.53)
eProcurement System Government of Rajasthan Created By: SURENDRA PRASAD SHARMA Created Date/Time: 14-Sep-2020 11:19 AM Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Tender Inviting Authority: Sr. Regional Manager, RIICO Ltd. Bhiwadi-II
Name of Work: Development of the infrastructure at Industrial Area Salarpur (Water Supply Scheme works - BSR Items) (PWD Rajasthan BSR Road & Building Works-2019 Alwar Circle, PHED Rajasthan BSR-2019, RUIDP Rajasthan BSR-2017, Electrical Rajasthan BSR-2013)
Contract No: 11/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s DEVENDRA CONSTRUCTION CO. 113238104.23 -5.60 106896770.39 Ten Crore Sixty Eight Lakh Ninty Six Thousand Seven Hundred and Seventy
2.00 yadav construction company 113238104.23 -8.11 104054493.98 Ten Crore Fourty Lakh Fifty Four Thousand Four Hundred and Ninty Three
3.00 lahotybuildcon 113238104.23 20.69 136667068.00 Thirteen Crore Sixty Six Lakh Sixty Seven Thousand Sixty Eight
Lowest Amount Quoted BY: yadav construction company(104054493.98)
eProcurement System Government of Rajasthan Created By: SURENDRA PRASAD SHARMA Created Date/Time: 14-Sep-2020 11:19 AM Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Tender Inviting Authority: Sr. Regional Manager, RIICO Ltd. Bhiwadi-II
Name of Work: Development of the infrastructure at Industrial Area Salarpur (Rain Water Harvesting Structure Works- Non BSR Items)
Contract No: 11/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Description of Work / Item(s) No.of Qty Units Estimated Rate M/s DEVENDRA CONSTRUCTION CO. yadav construction company lahotybuildcon
Rate Amount Rate Amount Rate Amount L1 Amount L1 Vendor
1.01 Providing and Installation of Digital Water Level Recorder (DWLR) of make Encardio Rite Model of EWLR-101-BX or equivalent make with integral GSM/GPRS Modem for telemetry, flange plate, and necesssary accessories along with required cable with protective cover for instrument etc. complete including cost of requried data sim card for telemetry. 5.00 Nos. 100000.00 500000.00 210000.00 1050000.00 225000.00 1125000.00 500000.00 M/s DEVENDRA CONSTRUCTION CO.
1.02 Construction of Recharge Shaft of dia 380 mm by rotary method system wherever required below the water table or upto maximum 5.0 Meter above the water table (the water table is reported between 22-30 mtr) with 200 mm casing pipe plain and stainer (excluding cost of pipe) along with the PVC air vent pipe of size 50-63 mm dia in the bore hole with performations of 6mm dia on periphery of vent pipe. The annular space between casing pipe & 380 mm dia shaft will be filled with suitable filter media. The recharge shaft will be protected by cement concrete (1:1.5:3 mix) ring of 1.2 m dia and thickness 50mm having reinforcement of 6mm bar upto a depth 3mtr having holes of 50 mm on periphery. The cement ring will be filled with filter media of of thickness 1.0 m each of three sizes, 8 to 12 mm, 3 to 8 mm and 1 to 3 mm, last one being on top .The work includes excavation work, excluding cost of casing pipe, 50 mm dia perforated PVC vent pipe,Cement ring, Filtermedia including testing of recharge shaft etc complete in all respect. 830.00 Nos. 112000.00 92960000.00 97500.00 80925000.00 50000.00 41500000.00 41500000.00 lahotybuildcon
Lowest Amount Quoted BY: lahotybuildcon(42625000.00)
eProcurement System Government of Rajasthan Created By: SURENDRA PRASAD SHARMA Created Date/Time: 14-Sep-2020 11:19 AM Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Tender Inviting Authority: Sr. Regional Manager, RIICO Ltd. Bhiwadi-II
Name of Work: Development of the infrastructure at Industrial Area Salarpur (Water Supply Scheme Works- Non BSR Items)
Contract No: 11/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Description of Work / Item(s) No.of Qty Units Estimated Rate M/s DEVENDRA CONSTRUCTION CO. yadav construction company lahotybuildcon
Rate Amount Rate Amount Rate Amount L1 Amount L1 Vendor
1.00 Laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked UPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (including specials such as T, bend etc.) complete including all material, labour, earthwork, hydraulic testing and commissioning as per Technical Specifications and direction of Engineer-in-charge. for the following dia of pipes: Distribution line 110 mm OD 42063.00 rmtr 324.00 13628412.00 500.00 21031500.00 542.00 22798146.00 13628412.00 M/s DEVENDRA CONSTRUCTION CO.
2.00 Laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked UPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (including specials such as T, bend etc.) complete including all material, labour, earthwork, hydraulic testing and commissioning as per Technical Specifications and direction of Engineer-in-charge. for the following dia of pipes: Distribution line 160 mm OD 3588.00 rmtr 721.00 2586948.00 880.00 3157440.00 942.00 3379896.00 2586948.00 M/s DEVENDRA CONSTRUCTION CO.
3.00 Laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked UPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (including specials such as T, bend etc.) complete including all material, labour, earthwork, hydraulic testing and commissioning as per Technical Specifications and direction of Engineer-in-charge. for the following dia of pipes: Distribution line 200 mm OD 667.00 rmtr 1144.00 763048.00 1290.00 860430.00 1400.00 933800.00 763048.00 M/s DEVENDRA CONSTRUCTION CO.
4.00 Providing, lowering, laying, aligning, fixing in position at all level/ depths CI Class - B double flanged specials as per IS : 7181 in trenches complete (excluding jointing) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 3500.00 Kg 120.00 420000.00 60.00 210000.00 170.00 595000.00 210000.00 yadav construction company
5.00 Providing, lowering, laying, aligning, fixing in position at all level/ depths CI Class - B double flanged pipes of standard length of 2.75m as per IS : 7181 in trenches complete (including jointing and jointing material) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer 100 mm Diameter. 440.00 Mtr 2200.00 968000.00 2450.00 1078000.00 2470.00 1086800.00 968000.00 M/s DEVENDRA CONSTRUCTION CO.
6.00 Providing, lowering, laying, aligning, fixing in position at all level/ depths CI Class - B double flanged pipes of standard length of 2.75m as per IS : 7181 in trenches complete (including jointing and jointing material) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer 200 mm Diameter. 100.00 Mtr 4500.00 450000.00 6500.00 650000.00 5560.00 556000.00 450000.00 M/s DEVENDRA CONSTRUCTION CO.
7.00 Providing, lowering, laying, aligning, fixing in position at all level/ depths CI Class - B double flanged specials as per IS : 7181 in trenches complete (excluding jointing) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 3500.00 Kg 90.00 315000.00 60.00 210000.00 95.50 334250.00 210000.00 yadav construction company
8.00 Supply & Fixing of Nut bolts as per requirement & as per IS Specifications. 1200.00 Kg 80.00 96000.00 60.00 72000.00 150.00 180000.00 72000.00 yadav construction company
9.00 Supply & Fixing of Rubber sheet as per requirement & as per IS Specifications. 300.00 Kg 80.00 24000.00 60.00 18000.00 300.00 90000.00 18000.00 yadav construction company
10.00 Providing, lowering, laying, aligning, fixing in position CI Duckfoot bend in pipe line as per IS:1538 (amended up to date) suitable for potable water at all level/ depth including all material, labour hydraulic testing and commissioning as per technical specifications and as per direction of Engineer for following sizes: 100 mm dia 6.00 Nos. 2000.00 12000.00 2992.00 17952.00 325.00 1950.00 1950.00 lahotybuildcon
11.00 Providing, lowering, laying, aligning, fixing in position CI Duckfoot bend in pipe line as per IS:1538 (amended up to date) suitable for potable water at all level/ depth including all material, labour hydraulic testing and commissioning as per technical specifications and as per direction of Engineer for following sizes: 200 mm dia 2.00 Nos. 4000.00 8000.00 7210.31 14420.62 519.00 1038.00 1038.00 lahotybuildcon
12.00 Providing, lowering, laying, aligning, fixing in position CI Duckfoot bend in pipe line as per IS:1538 (amended up to date) suitable for potable water at all level/ depth including all material, labour hydraulic testing and commissioning as per technical specifications and as per direction of Engineer for following sizes: Conducting SPT test for SBC of soil as per direction of Engineer in Charge 2.00 Job 50000.00 100000.00 100000.00 200000.00 250000.00 500000.00 100000.00 M/s DEVENDRA CONSTRUCTION CO.
13.00 Providing, lowering, laying, aligning, fixing in position CI Duckfoot bend in pipe line as per IS:1538 (amended up to date) suitable for potable water at all level/ depth including all material, labour hydraulic testing and commissioning as per technical specifications and as per direction of Engineer for following sizes: Dewatering Pump set, submersible 2 LPS, 10m head with auto switch 4.00 Each 70000.00 280000.00 25000.00 100000.00 55000.00 220000.00 100000.00 yadav construction company
14.00 Supply and installation of Electrochlorinator at pump house for disinfaction of water complete with piping and electric fitting.Model MM 350 for Industrial block 1.00 EACH 700000.00 700000.00 850000.00 850000.00 2000000.00 2000000.00 700000.00 M/s DEVENDRA CONSTRUCTION CO.
15.00 Supply and installation of Electrochlorinator at pump house for disinfaction of water complete with piping and electric fitting.Model MM 250 for Residential block 1.00 Each 650000.00 650000.00 650000.00 650000.00 1800000.00 1800000.00 650000.00 M/s DEVENDRA CONSTRUCTION CO., yadav construction company
16.00 DWC HDPE Pipe 100/110 mm 260.00 Mtr 360.00 93600.00 100.00 26000.00 305.00 79300.00 26000.00 yadav construction company
Lowest Amount Quoted BY: M/s DEVENDRA CONSTRUCTION CO.(21095008.00)
eProcurement System Government of Rajasthan Created By: SURENDRA PRASAD SHARMA Created Date/Time: 14-Sep-2020 11:19 AM Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Tender Inviting Authority: Sr. Regional Manager, RIICO Ltd. Bhiwadi-II
Name of Work: Development of the infrastructure at Industrial Area Salarpur (Operation and Maintenance - Non BSR Items)
Contract No: 11/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Description of Work / Item(s) No.of Qty Units Estimated Rate M/s DEVENDRA CONSTRUCTION CO. yadav construction company lahotybuildcon
Rate Amount Rate Amount Rate Amount L1 Amount L1 Vendor
1.00 Maintenace of Rain water harvesting system including removing of chocked filtermedia, desiting of water bodies & its disposal, cleaning of filter media by air pressure by suitable air compressor and also upkeeping rechage shaft in good condition for rain water harvesting structures including all material and consumable required for maintenance and day to day operation, and proper watch and ward of entire installation and services during night and day time as per mentioned scope of work. Note:-Number of RWHS , injection well and pezometric well may increase or decrease as per requirement of site. For any increase in the quantity of above , no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of RWHS , injection well and pezometric well during that particular period/year of payment. Salient features of RWHS are as below :- RWHS Structures - 16 Nos. Recharge Injection Well - 830 Nos. Pezometric Wells - 5 Nos. I st Year 1.00 Year 550000.00 550000.00 300000.00 300000.00 1000000.00 1000000.00 300000.00 yadav construction company
2.00 Maintenace of Rain water harvesting system including removing of chocked filtermedia, desiting of water bodies & its disposal, cleaning of filter media by air pressure by suitable air compressor and also upkeeping rechage shaft in good condition for rain water harvesting structures including all material and consumable required for maintenance and day to day operation, and proper watch and ward of entire installation and services during night and day time as per mentioned scope of work. Note:-Number of RWHS , injection well and pezometric well may increase or decrease as per requirement of site. For any increase in the quantity of above , no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of RWHS , injection well and pezometric well during that particular period/year of payment. Salient features of RWHS are as below :- RWHS Structures - 16 Nos. Recharge Injection Well - 830 Nos. Pezometric Wells - 5 Nos. II nd Year 1.00 Year 600000.00 600000.00 300000.00 300000.00 1000000.00 1000000.00 300000.00 yadav construction company
3.00 Maintenace of Rain water harvesting system including removing of chocked filtermedia, desiting of water bodies & its disposal, cleaning of filter media by air pressure by suitable air compressor and also upkeeping rechage shaft in good condition for rain water harvesting structures including all material and consumable required for maintenance and day to day operation, and proper watch and ward of entire installation and services during night and day time as per mentioned scope of work. Note:-Number of RWHS , injection well and pezometric well may increase or decrease as per requirement of site. For any increase in the quantity of above , no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of RWHS , injection well and pezometric well during that particular period/year of payment. Salient features of RWHS are as below :- RWHS Structures - 16 Nos. Recharge Injection Well - 830 Nos. Pezometric Wells - 5 Nos. III rd Year 1.00 Year 700000.00 700000.00 300000.00 300000.00 1000000.00 1000000.00 300000.00 yadav construction company
4.00 Maintenace of Rain water harvesting system including removing of chocked filtermedia, desiting of water bodies & its disposal, cleaning of filter media by air pressure by suitable air compressor and also upkeeping rechage shaft in good condition for rain water harvesting structures including all material and consumable required for maintenance and day to day operation, and proper watch and ward of entire installation and services during night and day time as per mentioned scope of work. Note:-Number of RWHS , injection well and pezometric well may increase or decrease as per requirement of site. For any increase in the quantity of above , no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of RWHS , injection well and pezometric well during that particular period/year of payment. Salient features of RWHS are as below :- RWHS Structures - 16 Nos. Recharge Injection Well - 830 Nos. Pezometric Wells - 5 Nos. IV th Year 1.00 Year 700000.00 700000.00 300000.00 300000.00 1000000.00 1000000.00 300000.00 yadav construction company
5.00 Maintenace of Rain water harvesting system including removing of chocked filtermedia, desiting of water bodies & its disposal, cleaning of filter media by air pressure by suitable air compressor and also upkeeping rechage shaft in good condition for rain water harvesting structures including all material and consumable required for maintenance and day to day operation, and proper watch and ward of entire installation and services during night and day time as per mentioned scope of work. Note:-Number of RWHS , injection well and pezometric well may increase or decrease as per requirement of site. For any increase in the quantity of above , no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of RWHS , injection well and pezometric well during that particular period/year of payment. Salient features of RWHS are as below :- RWHS Structures - 16 Nos. Recharge Injection Well - 830 Nos. Pezometric Wells - 5 Nos. V th Year 1.00 Year 700000.00 700000.00 300000.00 300000.00 1000000.00 1000000.00 300000.00 yadav construction company
6.00 Part-A (Regular operation and Maintenance of Tube wel) Regular Operation and maintenance of Tube wells at I/A Salarpur (Nos. of TW may increase or decrease as per requirements of Corporation) Installed with submersible pump sets of capacity upto 12.50 HP range with round the clock monitoring, including complete repair and maintenance of submersible pump set with cost of material and labour required for repairing/ reqinding, lowering and unlowering etc. The scope of work also includes complete repair and maintenance of panel board, electric connections, includes complete repair and maintenance of pipes connected with pump and motor including supply line, regular upkeeping of log book etc andother works as mentioned in tender document as directed by Engineer-in-charge complete in all respect as described in scope of enclosed Part-B (Regular Operation and maintenance of Pump House: Regular Operation and maintenance of Pump House. The work Includes operation of distribution main valves of daily supply of water at I/A Salarpur at supply times specified by corporation. Regular Operation of Pump house installed with existing centrifugal/ monoblock pumps/ motor, with round the clock monitoring, including complete repair and maintenance of pumpsets with cost of material and labour required for repairing/ rewinding, removal and replacement etc. The scope of work also includes complete repair and maintenance panel board, Electric connections, services cables and connections cable with cost of material and labour required for uniterrupted functioning of Electric panels and pumpsets with regular up-keeping of log books, repair of leakages and MS/CI/UPVC/ACPP pipeline system inside of WSS campus complete, regular chemical dosing in CWR maintaning general cleanliness at pump house and WSS Campus and maintenance of pump house structure etc complete in all respect as directed by Engineer-in-charge and as per the scope of work enclosed. Part-C (Regular Operation and maintenance of Pipe Line) Repair and Maintenance of distribution/raising pipe line Repair & Maintenance of distribution/rising main pipe line system consisting of CI lines/DI/UPVC/ACPP/HDPE pipe line system upto 300/315 mm dia for maintaining smooth water supply in complete area. The scope of work includes timely repairing of leakage in all existing distribution/rising main pipeline of all size by digging out suitable size of pit in soft & loose soil/hard soil including cutting of Bituminous/cement concrete/WBM/WMM surface as per wite of work & repairing the same as in original condition at his own cost. The scope of work also includes cutting of pipe ends, fixing of pipe piece with specified jointing material to make repair leak proof and refilling the pit by excavated soil by ramming it at side of pipes & upto ground level the work also includes dewatering whenever required for leakage repair at own arrangements. Contractor will use their own T & P and will arrange transporation of pipes and jointing material if required. The cost of all material, T&P, labor, transportation etc shall be bourne by the agency as per the direction of Engineer-in-charge and the agency will be abided by the scope of the work. Ist Year 1.00 Year 1200000.00 1200000.00 1600000.00 1600000.00 1000000.00 1000000.00 1000000.00 lahotybuildcon
7.00 Part-A (Regular operation and Maintenance of Tube wel) Regular Operation and maintenance of Tube wells at I/A Salarpur (Nos. of TW may increase or decrease as per requirements of Corporation) Installed with submersible pump sets of capacity upto 12.50 HP range with round the clock monitoring, including complete repair and maintenance of submersible pump set with cost of material and labour required for repairing/ reqinding, lowering and unlowering etc. The scope of work also includes complete repair and maintenance of panel board, electric connections, includes complete repair and maintenance of pipes connected with pump and motor including supply line, regular upkeeping of log book etc andother works as mentioned in tender document as directed by Engineer-in-charge complete in all respect as described in scope of enclosed Part-B (Regular Operation and maintenance of Pump House: Regular Operation and maintenance of Pump House. The work Includes operation of distribution main valves of daily supply of water at I/A Salarpur at supply times specified by corporation. Regular Operation of Pump house installed with existing centrifugal/ monoblock pumps/ motor, with round the clock monitoring, including complete repair and maintenance of pumpsets with cost of material and labour required for repairing/ rewinding, removal and replacement etc. The scope of work also includes complete repair and maintenance panel board, Electric connections, services cables and connections cable with cost of material and labour required for uniterrupted functioning of Electric panels and pumpsets with regular up-keeping of log books, repair of leakages and MS/CI/UPVC/ACPP pipeline system inside of WSS campus complete, regular chemical dosing in CWR maintaning general cleanliness at pump house and WSS Campus and maintenance of pump house structure etc complete in all respect as directed by Engineer-in-charge and as per the scope of work enclosed. Part-C (Regular Operation and maintenance of Pipe Line) Repair and Maintenance of distribution/raising pipe line Repair & Maintenance of distribution/rising main pipe line system consisting of CI lines/DI/UPVC/ACPP/HDPE pipe line system upto 300/315 mm dia for maintaining smooth water supply in complete area. The scope of work includes timely repairing of leakage in all existing distribution/rising main pipeline of all size by digging out suitable size of pit in soft & loose soil/hard soil including cutting of Bituminous/cement concrete/WBM/WMM surface as per wite of work & repairing the same as in original condition at his own cost. The scope of work also includes cutting of pipe ends, fixing of pipe piece with specified jointing material to make repair leak proof and refilling the pit by excavated soil by ramming it at side of pipes & upto ground level the work also includes dewatering whenever required for leakage repair at own arrangements. Contractor will use their own T & P and will arrange transporation of pipes and jointing material if required. The cost of all material, T&P, labor, transportation etc shall be bourne by the agency as per the direction of Engineer-in-charge and the agency will be abided by the scope of the work. IInd Year 1.00 Year 1200000.00 1200000.00 1600000.00 1600000.00 1000000.00 1000000.00 1000000.00 lahotybuildcon
8.00 Part-A (Regular operation and Maintenance of Tube wel) Regular Operation and maintenance of Tube wells at I/A Salarpur (Nos. of TW may increase or decrease as per requirements of Corporation) Installed with submersible pump sets of capacity upto 12.50 HP range with round the clock monitoring, including complete repair and maintenance of submersible pump set with cost of material and labour required for repairing/ reqinding, lowering and unlowering etc. The scope of work also includes complete repair and maintenance of panel board, electric connections, includes complete repair and maintenance of pipes connected with pump and motor including supply line, regular upkeeping of log book etc andother works as mentioned in tender document as directed by Engineer-in-charge complete in all respect as described in scope of enclosed Part-B (Regular Operation and maintenance of Pump House: Regular Operation and maintenance of Pump House. The work Includes operation of distribution main valves of daily supply of water at I/A Salarpur at supply times specified by corporation. Regular Operation of Pump house installed with existing centrifugal/ monoblock pumps/ motor, with round the clock monitoring, including complete repair and maintenance of pumpsets with cost of material and labour required for repairing/ rewinding, removal and replacement etc. The scope of work also includes complete repair and maintenance panel board, Electric connections, services cables and connections cable with cost of material and labour required for uniterrupted functioning of Electric panels and pumpsets with regular up-keeping of log books, repair of leakages and MS/CI/UPVC/ACPP pipeline system inside of WSS campus complete, regular chemical dosing in CWR maintaning general cleanliness at pump house and WSS Campus and maintenance of pump house structure etc complete in all respect as directed by Engineer-in-charge and as per the scope of work enclosed. Part-C (Regular Operation and maintenance of Pipe Line) Repair and Maintenance of distribution/raising pipe line Repair & Maintenance of distribution/rising main pipe line system consisting of CI lines/DI/UPVC/ACPP/HDPE pipe line system upto 300/315 mm dia for maintaining smooth water supply in complete area. The scope of work includes timely repairing of leakage in all existing distribution/rising main pipeline of all size by digging out suitable size of pit in soft & loose soil/hard soil including cutting of Bituminous/cement concrete/WBM/WMM surface as per wite of work & repairing the same as in original condition at his own cost. The scope of work also includes cutting of pipe ends, fixing of pipe piece with specified jointing material to make repair leak proof and refilling the pit by excavated soil by ramming it at side of pipes & upto ground level the work also includes dewatering whenever required for leakage repair at own arrangements. Contractor will use their own T & P and will arrange transporation of pipes and jointing material if required. The cost of all material, T&P, labor, transportation etc shall be bourne by the agency as per the direction of Engineer-in-charge and the agency will be abided by the scope of the work. IIIrd Year 1.00 Year 1200000.00 1200000.00 1600000.00 1600000.00 1000000.00 1000000.00 1000000.00 lahotybuildcon
9.00 Part-A (Regular operation and Maintenance of Tube wel) Regular Operation and maintenance of Tube wells at I/A Salarpur (Nos. of TW may increase or decrease as per requirements of Corporation) Installed with submersible pump sets of capacity upto 12.50 HP range with round the clock monitoring, including complete repair and maintenance of submersible pump set with cost of material and labour required for repairing/ reqinding, lowering and unlowering etc. The scope of work also includes complete repair and maintenance of panel board, electric connections, includes complete repair and maintenance of pipes connected with pump and motor including supply line, regular upkeeping of log book etc andother works as mentioned in tender document as directed by Engineer-in-charge complete in all respect as described in scope of enclosed Part-B (Regular Operation and maintenance of Pump House: Regular Operation and maintenance of Pump House. The work Includes operation of distribution main valves of daily supply of water at I/A Salarpur at supply times specified by corporation. Regular Operation of Pump house installed with existing centrifugal/ monoblock pumps/ motor, with round the clock monitoring, including complete repair and maintenance of pumpsets with cost of material and labour required for repairing/ rewinding, removal and replacement etc. The scope of work also includes complete repair and maintenance panel board, Electric connections, services cables and connections cable with cost of material and labour required for uniterrupted functioning of Electric panels and pumpsets with regular up-keeping of log books, repair of leakages and MS/CI/UPVC/ACPP pipeline system inside of WSS campus complete, regular chemical dosing in CWR maintaning general cleanliness at pump house and WSS Campus and maintenance of pump house structure etc complete in all respect as directed by Engineer-in-charge and as per the scope of work enclosed. Part-C (Regular Operation and maintenance of Pipe Line) Repair and Maintenance of distribution/raising pipe line Repair & Maintenance of distribution/rising main pipe line system consisting of CI lines/DI/UPVC/ACPP/HDPE pipe line system upto 300/315 mm dia for maintaining smooth water supply in complete area. The scope of work includes timely repairing of leakage in all existing distribution/rising main pipeline of all size by digging out suitable size of pit in soft & loose soil/hard soil including cutting of Bituminous/cement concrete/WBM/WMM surface as per wite of work & repairing the same as in original condition at his own cost. The scope of work also includes cutting of pipe ends, fixing of pipe piece with specified jointing material to make repair leak proof and refilling the pit by excavated soil by ramming it at side of pipes & upto ground level the work also includes dewatering whenever required for leakage repair at own arrangements. Contractor will use their own T & P and will arrange transporation of pipes and jointing material if required. The cost of all material, T&P, labor, transportation etc shall be bourne by the agency as per the direction of Engineer-in-charge and the agency will be abided by the scope of the work. IV th Year 1.00 Year 1200000.00 1200000.00 1600000.00 1600000.00 1000000.00 1000000.00 1000000.00 lahotybuildcon
10.00 Part-A (Regular operation and Maintenance of Tube wel) Regular Operation and maintenance of Tube wells at I/A Salarpur (Nos. of TW may increase or decrease as per requirements of Corporation) Installed with submersible pump sets of capacity upto 12.50 HP range with round the clock monitoring, including complete repair and maintenance of submersible pump set with cost of material and labour required for repairing/ reqinding, lowering and unlowering etc. The scope of work also includes complete repair and maintenance of panel board, electric connections, includes complete repair and maintenance of pipes connected with pump and motor including supply line, regular upkeeping of log book etc andother works as mentioned in tender document as directed by Engineer-in-charge complete in all respect as described in scope of enclosed Part-B (Regular Operation and maintenance of Pump House: Regular Operation and maintenance of Pump House. The work Includes operation of distribution main valves of daily supply of water at I/A Salarpur at supply times specified by corporation. Regular Operation of Pump house installed with existing centrifugal/ monoblock pumps/ motor, with round the clock monitoring, including complete repair and maintenance of pumpsets with cost of material and labour required for repairing/ rewinding, removal and replacement etc. The scope of work also includes complete repair and maintenance panel board, Electric connections, services cables and connections cable with cost of material and labour required for uniterrupted functioning of Electric panels and pumpsets with regular up-keeping of log books, repair of leakages and MS/CI/UPVC/ACPP pipeline system inside of WSS campus complete, regular chemical dosing in CWR maintaning general cleanliness at pump house and WSS Campus and maintenance of pump house structure etc complete in all respect as directed by Engineer-in-charge and as per the scope of work enclosed. Part-C (Regular Operation and maintenance of Pipe Line) Repair and Maintenance of distribution/raising pipe line Repair & Maintenance of distribution/rising main pipe line system consisting of CI lines/DI/UPVC/ACPP/HDPE pipe line system upto 300/315 mm dia for maintaining smooth water supply in complete area. The scope of work includes timely repairing of leakage in all existing distribution/rising main pipeline of all size by digging out suitable size of pit in soft & loose soil/hard soil including cutting of Bituminous/cement concrete/WBM/WMM surface as per wite of work & repairing the same as in original condition at his own cost. The scope of work also includes cutting of pipe ends, fixing of pipe piece with specified jointing material to make repair leak proof and refilling the pit by excavated soil by ramming it at side of pipes & upto ground level the work also includes dewatering whenever required for leakage repair at own arrangements. Contractor will use their own T & P and will arrange transporation of pipes and jointing material if required. The cost of all material, T&P, labor, transportation etc shall be bourne by the agency as per the direction of Engineer-in-charge and the agency will be abided by the scope of the work. V th Year 1.00 Year 1200000.00 1200000.00 1600000.00 1600000.00 1000000.00 1000000.00 1000000.00 lahotybuildcon
11.00 Preparation and distribution of monthly water bills as per detailed scope of work as under: The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills. The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite computer/ printer/scanner, internet connection, software if required, bill clerk and other manpower, stationary material complete,and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Number of water connection/ disconnection/ reconnection may increaseas as per requirement of enterpenurs for which no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of new water connection, re-connection, disconnection, bill distribution during that particular period/year of payment. Ist Year 1.00 Year 450000.00 450000.00 15000.00 15000.00 1000000.00 1000000.00 15000.00 yadav construction company
12.00 Preparation and distribution of monthly water bills as per detailed scope of work as under: The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills. The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite computer/ printer/scanner, internet connection, software if required, bill clerk and other manpower, stationary material complete,and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Number of water connection/ disconnection/ reconnection may increaseas as per requirement of enterpenurs for which no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of new water connection, re-connection, disconnection, bill distribution during that particular period/year of payment. IInd Year 1.00 Year 450000.00 450000.00 17000.00 17000.00 1000000.00 1000000.00 17000.00 yadav construction company
13.00 Preparation and distribution of monthly water bills as per detailed scope of work as under: The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills. The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite computer/ printer/scanner, internet connection, software if required, bill clerk and other manpower, stationary material complete,and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Number of water connection/ disconnection/ reconnection may increaseas as per requirement of enterpenurs for which no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of new water connection, re-connection, disconnection, bill distribution during that particular period/year of payment. IIIrd Year 1.00 Year 450000.00 450000.00 19000.00 19000.00 1000000.00 1000000.00 19000.00 yadav construction company
14.00 Preparation and distribution of monthly water bills as per detailed scope of work as under: The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills. The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite computer/ printer/scanner, internet connection, software if required, bill clerk and other manpower, stationary material complete,and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Number of water connection/ disconnection/ reconnection may increaseas as per requirement of enterpenurs for which no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of new water connection, re-connection, disconnection, bill distribution during that particular period/year of payment. IV th Year 1.00 Year 450000.00 450000.00 21000.00 21000.00 1000000.00 1000000.00 21000.00 yadav construction company
15.00 Preparation and distribution of monthly water bills as per detailed scope of work as under: The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills. The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite computer/ printer/scanner, internet connection, software if required, bill clerk and other manpower, stationary material complete,and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Number of water connection/ disconnection/ reconnection may increaseas as per requirement of enterpenurs for which no extra payment shall be made to the Contractor during the particular period/year. However, the proportionate payment shall be deducted from O&M bill payments for the lesser number of new water connection, re-connection, disconnection, bill distribution during that particular period/year of payment. V th Year 1.00 Year 450000.00 450000.00 25001.87 25001.87 1000000.00 1000000.00 25001.87 yadav construction company
Lowest Amount Quoted BY: yadav construction company(9597001.87)
BOQ Summary Details Tender Title: Development of Infrastructure at Industrial Area Salarpur (Water Supply Scheme and Rain Water Harvesting Structures) with 05 years Operation and Maintenance Bhiwadi (Alwar) Rajasthan Tender ID: 2020_RIICO_194544_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 yadav construction company 60378761.53 L1
2 M/s DEVENDRA CONSTRUCTION CO. 78357026.13 L2
3 lahotybuildcon 88545790.16 L3
BoQ2 1 yadav construction company 104054493.98 L1
2 M/s DEVENDRA CONSTRUCTION CO. 106896770.39 L2
3 lahotybuildcon 136667068.00 L3
BoQ3 1 lahotybuildcon 42625000.00 L1
2 yadav construction company 81975000.00 L2
3 M/s DEVENDRA CONSTRUCTION CO. 93460000.00 L3
BoQ4 1 M/s DEVENDRA CONSTRUCTION CO. 21095008.00 L1
2 yadav construction company 29145742.62 L2
3 lahotybuildcon 34556180.00 L3
BoQ5 1 yadav construction company 9597001.87 L1
2 M/s DEVENDRA CONSTRUCTION CO. 11500000.00 L2
3 lahotybuildcon 15000000.00 L3
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_345515.xls
BOQ • 0.54 MB
bidwss.pdf
Tender Documents • 3.53 MB
Download all tender documents and submit your bid