Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC KACHIRAYIL KARTHIKAPURAM PO | ₹1.7 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹1.7 LRejected-AOC | ₹1.7 L | L2 | Rejected-AOC Higher rate and hence rejected |
| Sl No | Description | Qty | Unit | SANTO K J L1 | THOMSON M MANDAPAM L2 |
|---|---|---|---|---|---|
| 1.00Compound Wall | |||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 1.62 | cum | 680.15 ₹1,101.84 | 680.15 ₹1,101.84 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6 | cum | 335.74 ₹2,013.77 | 335.74 ₹2,013.77 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.7 | cum | 8,620.24 ₹6,051.41 | 8,620.24 ₹6,051.41 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 2.91 | sqm | 783.63 ₹2,278.8 | 783.63 ₹2,278.8 |
| 1.00 | OD254425/2025-2026:Laterate masonry with departmental laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1) (Edited 2021-2022) | 0.81 | cum | 3,429.66 ₹2,795.17 | 3,429.66 ₹2,795.17 |
| 1.01 | OD254426/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1) (Edited 2021-2022) | 9.23 | cum | 6,496.02 ₹59,932.28 | 6,496.02 ₹59,932.28 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.2 | cum | 7,997.86 ₹1,599.57 | 7,997.86 ₹1,599.57 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.54 | cum | 9,789.52 ₹5,325.5 | 9,789.52 ₹5,325.5 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.48 | cum | 11,920.7 ₹5,721.94 | 11,920.7 ₹5,721.94 |
Tender Value
₹1.7 L
EMD Value
₹4,237
Closing Date
3 Nov 2025, 3:00 pmClosed
Assistant Engineer
The Assistant Engineer, LID and EW Subdivision ,Thaliparamba Block Panchayath
TPBA BP - Project No 97 2025-26-Construction of Jayagiri Pakal Veedu Compound wall in Udayagiri GP (Retender)
2025_LSGD_815255_2
AE/TPBA/ETEN0.04/2025-26
Open Tender
Civil Works - Others
180 days
Thaliparamba BP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,237
Yes
29 Mar 2026
27 Oct 2025
5 Nov 2025
27 Oct 2025
3 Nov 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1364590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.18 MB
fot.pdf
Tender Documents • 0.25 MB
BOQ_1364590.xls
BOQ • 0.31 MB
affi.pdf
Tender Documents • 0.24 MB
sbd.pdf
Tender Documents • 0.90 MB
preagmt.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid