Tender Value
₹80.3 L
EMD Value
₹50,000
Closing Date
26 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/OExecutive Engineer,road Maint Division, Ktym
GENERAL-RM 2021-22- Cluster 1-One year Running Contract for various PWD Roads Section Karukachal in Kottayam district (19) road stretches for a total length of 53.662 km- General Civil Work
2022_PWD_487975_3
D1/PWD/RM/TR/104245 /2021_5_1_1/1 dtd25/04/2022
Open Tender
Civil Works - Roads
Item Rate
365 days
karukachal
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
19 Aug 2022
18 May 2022
28 May 2022
18 May 2022
26 May 2022
18 May 2022
60 days
Amount
Appendix A Reactive Maintennce
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67043/2021-2022:MORD - Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) OR 13.2mm to 0.9 mm (Type - B) aggregates using penetration grade bitumen using VG 30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheeled roller 8-10 KN static roller and finishing to required level and grade as per Technical specification clause 509 of MORD - Bitumen @22 kg / 10 m2....
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD67041/2021-2022: Arranging Man mazdoor for cutting earthen drain, diverting blocked water, cutting of wood and other various work
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
55.15:Refurbishment of existing signboards<br>Refurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
Appendix B Preventive Maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD143282/2021-2022:Mix Seal Surfacing providing ,laying and rolling of close graded premix surface material of 20mm thickness composed of 11.2mm to .09mm (Type A) or 13.2mm to 0.9mm (TypeB)aggregates using penetration grade bitumen using VG 30 to the required line ,grade and level to serve as wearing course on a previously prepared base ,including mixing in a suitable plant ,laying and rolling with a three wheel 8-10KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD - Bitumen @ 22.00kg/10m2By Manual Means
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD143364/2021-2022:Filling up of potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges transportation to site etc complete rate is arrived for a bag of 25kg.
OD143370/2021-2022:After spraying emulsion to the surface of potholes, laying 36mm broken stone,Spraying emulsion over the 36mm and compacting manually to get a compact surface
OD143375/2021-2022:Arranging man mazdoor for cutting earthen drain,diverting blocken water,wood cutting and other various works
Routine Inspection
OD143056/2021-2022:Conducting and Reporting Routine Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running contract as directed by the departmental officer at site. Additional RI may be required in response to reports or complaints from the police ,other authotities and public as a result of major accidents, typhoon or flooding damages etc and are not measurable /payable.A proportion of the RI should be carried out either during or immediately following a period of wet weather.
Bidder Name
P.M KABEER
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_704866.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .