Tender Value
₹16.2 L
EMD Value
₹40,500
Closing Date
18 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
Sree Ayyappa College in Thiruvalla group- Proposal for constructing a new research hall building RETENDER
2026_TDB_849496_2
EEM/ET-06/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
₹40,500
19 May 2026
14 May 2026
19 May 2026
14 May 2026
18 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix I - | |||||
| 1.01 | Clearing the site | 5 | each | 1,082.18 | ₹5,410.9 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | M3 | 359.72 | - |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | M3 | 318.47 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | - | M3 | 7,932.89 | - |
| 1.05 | Random rubble masonry in cement mortar in 1:6(I cement:6coarse sand )with hardstone in foundation and basement up to plinth level | 1 | M3 | 5,603.11 | ₹5,597.51 |
| 1.06 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | M2 | 386.16 | ₹385.77 |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1 | M3 | 10,488.77 | ₹10,478.28 |
| 1.08 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 30.88 | M2 | 1,008.55 | ₹31,143.02 |
| 1.09 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.62 | M3 | 12,772.18 | ₹33,514.2 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
BOQ_1437708.xls
BOQ • 0.39 MB
3rdtendernotice.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .