Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.5 L+₹21,379.07 (1.11%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical PLACHERI MANNIL VELLIYARA P O AYROOR NORTH PATHANAMTHITTA DIST | IDUKKI | KERALA | 685533 | - | Rejected-Technical L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 |
Tender Value
₹22.3 L
EMD Value
₹50,000
Closing Date
2 Nov 2019, 5:00 pmClosed
BDO
Koipuram Block Panchayat Office , Pullad P O
Koipuram Block Panchayat MLA SDF 2018-19 Choorakkattuchira Ochalippadi Road Side protection wall and concreting in ward No.14 of Eraviperoor G P
2019_LSGD_312843_1
2019_KBP_BDO_1_1
Open Tender
Civil Works - Roads
Item Rate
180 days
Koipuram
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
Yes
online
₹50,000
Yes
3 Jan 2020
25 Oct 2019
7 Nov 2019
25 Oct 2019
2 Nov 2019
25 Oct 2019
Amount
Road concrete
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
od145467/2019_2020 : od32442/2019_2020 :Filling with Quarry muck<br><br> Filling up low lying and water logged areas with local material/ Quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc .quantity for 300m3
od145468/2019_2020 : Construction of,plain cement concrete pavement ,thickness as per design,over a prepared sub base,with 43 grade<br>cement or any other type as per clause 1501.2.2 M 20 (grade),coarse and fine aggregates conforming to IS<br>383,maximum size of coarse aggregate not exceeding 25 mm,mixed in a concrete mixer of not less than 0.2<br>cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side<br>formwork(steel channel, laying and fixing of 125 micron thick polythene film, wedges,steel plates including<br>levelling the formwork as per drawing),spreading the concrete with showels,rakes,compacted using<br>needle,screed, and plate vibrators and finished in continuous operation including provision of contraction<br>and expansion ,construction joints,applying debonding strips, primer, sealant, dowel bars, near approaches<br>to bridge /culvert and construction joints, admixtures as approved,curing of concrete slabs for 14 days,using<br>curing compound(where specified) and water finishing to lines and grade as per drawing and Technical<br>Specifications clause 1501 with form work 3%
3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Side Protection wall
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
od217096/2019_2020 : od 32485/2019-2020<br> DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges ete. complete as per direction of Departmental officers at site.
od217101/2019_2020 : od32996/2019-2020 : Plain /reinforced cement concrete M20 (2:2:4 using 20mmb/s) in substructure complete as per drawings and technical specification Clauses 802, 804,805, 806, 807,1202 and 1204 including form work.(modified 11.4.3)
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
3.14 : Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
od234588/2019_2020 : Supplying and fixing name board with an area of 0.50m2 engraving leers as per direection of engineer in charge.
AJU K A
HARILAL. P.J
K M JOSEPH
Bidder Name
K M JOSEPH
AJU K A
HARILAL. P.J
ANIL V VARGHESE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_430495.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .