Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.4 L+₹32,632.47 (4.05%)Rejected-AOC | ₹8.4 L+₹32,632.47 (4.05%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.2 L+₹1.2 L (14.4%)Rejected-AOC | ₹9.2 L+₹1.2 L (14.4%) | L3 | Rejected-AOC L3 |
| 4 | L4₹9.7 L+₹1.7 L (21.0%)Rejected-AOC | ₹9.7 L+₹1.7 L (21.0%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | M Chandrasekharan Unnithan L4 | SUNIL CHANDRAN L3 | SATHEESH CHANDRAN L2 | SIYADH SALAM L1 |
|---|---|---|---|---|---|---|---|
| 1.00DETAILED ESTIMATE | |||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 1.99 | Hectare | 58,076 ₹1,15,687.39 | 54,894 ₹1,09,348.85 | 50,501 ₹1,00,597.99 | 47,976.48 ₹95,569.15 Lowest |
| 1.00 | OD45367/2026-2027:Filling up potholes with departmental bituminous ready mix compound (25 kg bag) and compacting and ramming to get a compact surface including cost of materials, laying charges and transportation to the site etc complete. (The rate is arrived for a bag of 25 Kg) | 100 | each | 895 ₹89,500 | 841 ₹84,100 | 784 ₹78,400 | 736.19 ₹73,619 Lowest |
| 1.00 | OD45369/2026-2027:Engaging man mazdoor wherever required | 150 | each | 1,296 ₹1,94,400 | 1,225 ₹1,83,750 | 1,110 ₹1,66,500 | 1,070.99 ₹1,60,648.5 Lowest |
| 1.00 | OD45366/2026-2027:Engaging JCB | 132 | hour | 2,612 ₹3,44,784 | 2,470 ₹3,26,040 | 1,398 ₹1,84,536 Lowest | 2,158.59 ₹2,84,933.88 |
| 1.00 | OD45370/2026-2027:Engaging Tipper for removing wood and other materials from road side as per the direction of departmental officers in charge | 132 | hour | 440 ₹58,080 | 410 ₹54,120 | 1,200 ₹1,58,400 | 358.64 ₹47,340.48 Lowest |
| 1.01 | OD45368/2026-2027:Engaging wood cutter for removing dangerously overhanging branches of trees | 10 | Day | 1,575 ₹15,750 | 1,500 ₹15,000 | 2,000 ₹20,000 | 1,301.79 ₹13,017.9 Lowest |
| 1.01 | OD45365/2026-2027:Hiring charges of hand machine for cutting wood including fuel, rope and other sundries | 10 | Day | 1,877 ₹18,770 | 1,775 ₹17,750 | 1,559 ₹15,590 | 1,551.83 ₹15,518.3 Lowest |
| 1.01 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 3,919 | sqm | 35 ₹1,37,165 | 33.4 ₹1,30,894.6 | 29 ₹1,13,651 Lowest | 29.19 ₹1,14,395.61 |
Tender Value
Refer Docs
EMD Value
₹21,186
Closing Date
27 Jun 2026, 2:00 pmClosed
ASSSITANT EXECUTIVE ENGINEER
PWD ROADS SUB DIVISION MAVELIKARA
Clearing light jungles, clearing chocked culverts and drain, clearing water stagnation, cutting down dangerously overhanging branches of trees etc in various roads in Mavelikkara and Kayamkulam LACs under PWD Roads Section Kattanam
2026_PWD_856616_1
PWD/RB/TR/8998/2026
Open Tender
Civil Works - Roads
Item Rate
90 days
MAVELIKARA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,186
Yes
21 Jul 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DETAILED ESTIMATE | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
| 1.002 | OD45367/2026-2027:Filling up potholes with departmental bituminous ready mix compound (25 kg bag) and compacting and ramming to get a compact surface including cost of materials, laying charges and transportation to the site etc complete. (The rate is arrived for a bag of 25 Kg) | - | each | - | - |
| 1.003 | OD45369/2026-2027:Engaging man mazdoor wherever required | - | each | - | - |
| 1.004 | OD45366/2026-2027:Engaging JCB | - | hour | - | - |
| 1.005 | OD45370/2026-2027:Engaging Tipper for removing wood and other materials from road side as per the direction of departmental officers in charge | - | hour | - | - |
| 1.006 | OD45368/2026-2027:Engaging wood cutter for removing dangerously overhanging branches of trees | - | Day | - | - |
| 1.007 | OD45365/2026-2027:Hiring charges of hand machine for cutting wood including fuel, rope and other sundries | - | Day | - | - |
| 1.008 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1447857.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1447857.xls
BOQ • 0.30 MB
EEEEEEEEE.pdf
Other Document • 0.05 MB
Preliminary_Agreement.pdf
Other Document • 0.03 MB
affidavit.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .