Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1 L
Closing Date
10 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Ganderbal
Executive Engineer REW Ganderbal
Construction of Culvert with R wall from Ab Rashid Dar to Mohd Subhan Dar at Wussan A Halqa Wussan A Block Kangan
2021_RDPR_146526_4
e nit136
Open Tender
Civil Works
Item Rate
30 days
RD and PR Ganderbal
as per nit
2 documents required · 2 mandatory
₹100
Yes
e
Exempted
11 Nov 2021
4 Nov 2021
11 Nov 2021
4 Nov 2021
10 Nov 2021
4 Nov 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Supply and laying of stone soling (hand packed ) in trenches of foundation including consolidation watering and ramming and all consequential and incidental costs like all leads,lifts,carriages but excluding head load by manual labour or by ponnies.
P/L in position cement concrete of specified grade of reinforced cement concrete in 1:3:6 (1 cement:3 coarse sand : 6 graded stone aggregate 40mm nominal size) excluding the cost of centering, shuttering, finishing but including cost and carriages of all materials involved but excluding head load by manual labour or ponnies.
centering and shuttering including strutting,propping etc and removal of forms including all consequential and incidental costs like all leads,lifts,carriages and scaffolding etc complete job.
Providing and applying12mm cement plaster in 1:6 (1 cement: 6 fine sand)
Providing and laying RCC Spun pipes 24" dia including all carriages
Photographs/Signboard.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .